Fulani Oriana Ltd: planning applications
3 planning applications since 28 June 2023: 3 granted, 0 refused, 0 pending. Tallest granted: 8 floors.
- PA/00161/25 San Pawl il-Bahar: Construction of 3 levels of basement with 77 closed garages and 8 parking spaces, with overlying ground floor with 7 Class 4B units, 6 floors with 8…
- PA/08467/24 San Pawl il-Bahar: Construction of a Class 3B 3-star hotel, consisting of a ground floor comprising in lounge, bar, breakfast area, luggage room, 7 overlying floors and 2…
- PA/06272/23 San Pawl il-Bahar: Full demolitions of existing building and excavation of 4 levels basement in preparation for multipurpose use building.