Mario Farrugia: planning applications
14 planning applications since 5 September 2019: 6 granted, 0 refused, 0 pending.
- PA/06329/26 Rabat: To sanction previously approved (PA/1712/19) for minor internal alterations and wall realignment following a site survey, widening of apertures on the rear…
- PA/04343/26 Cospicua (Bormla): Proposed minor extensions and alterations at ground floor level within an existing residential unit.
- PA/04366/24 Mqabba: Proposed minor internal and external additions and alterations to existing pre-1967 residential unit.
- PA/06088/23 Sliema: Change of use from Class 4A estate agency to massage parlour, alterations to internal layout, and change of signage.
- PA/03312/23 Qormi: Sanctioning of internal alterations, addition of domestic store at roof level and relocation of existing services.
- PA/01792/23 Zurrieq: Proposed internal alterations and extension at roof level to existing penthouse to convert into a duplex unit.
- PA/02260/22 Zebbug: Proposed pump room next to existing pre-1967 reservoir.
- PA/03099/21 Naxxar: To increase height of party wall to approved dwelling for privacy and security reasons and to carry out minor alterations to ground floor dwelling and garage
- PA/01517/21 Zurrieq: To sanction construction of Class 4B Ironmongery use at basement level
- PA/01346/21 Santa Venera: To sanction garage as built, with changes from approved permit PA/03787/01
- PA/00754/21 Zurrieq: To sanction the installation of a kitchen-hood extraction fan and narrowing of existing window from PA/10583/17.
- PA/00470/21 Zurrieq: Proposed alterations to front garden to remove part of front garden wall and replace with aluminium gate/railings, remove some vegetation and pave part of…
- PA/00189/20 Zebbug (Gozo): To construct two units, one on each floor, by extending approved but yet unbuilt unit at fourth floor level, and construct new unit at fifth receded floor.
- PA/00008/20 Mqabba: To sanction minor changes to approved manure clamp and, cesspit. Application is also sanctioning pv's at roof level, reservoirs, construction of wc, and…