---
title: "Neil Muscat: planning applications in Malta | PropertyList"
url: https://propertylist.mt/applicant/neil-muscat
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Planning Authority applications by Neil Muscat: projects, localities, approvals and refusals in Malta and Gozo.

Planning applications › Applicants › Neil Muscat

# Neil Muscat: planning applications

12 planning applications since 13 July 2023: 10 granted, 0 refused, 2 pending. Tallest granted: 3 floors.

- [**PA/05964/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05964-26/san-pawl-il-bahar-sanctioning-of-minor-variations-from-the-latest): Sanctioning of minor variations from the latest approved permit PA/5501/25. Variations include changes to the location of internal partitions and the… Granted, validated 12 October 2026
- [**PA/00503/26** Gzira](https://propertylist.mt/permit/PA-00503-26/gzira-demolition-of-existing-townhouse-and-construction-of): Demolition of existing townhouse and construction of a block of apartments consisting of five apartments and one penthouse at receded level. Pending, validated 28 January 2026, 4 floors plus a receded floor
- [**PA/06278/25** Rabat](https://propertylist.mt/permit/PA-06278-25/rabat-alterations-to-an-existing-pre-1967-property): Proposed alterations to an existing pre-1967 property, change of use from a restaurant to a Class 3A guesthouse and Class 4B retail outlet, and an extension… Granted, validated 1 October 2025
- [**PA/05692/25** San Gwann](https://propertylist.mt/permit/PA-05692-25/san-gwann-demolition-of-existing-residential-units-and-construction): Demolition of existing residential units and construction of a block of apartments consisting of ground floor garages level and five apartments and one… Granted, validated 3 September 2025, 1 floor plus a receded floor
- [**PA/05501/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05501-25/san-pawl-il-bahar-sanction-the-variations-in-a-second-floor): To sanction the variations in a second floor apartment as built from the last approved PA/05546/01, variations include floor to ceiling height, size of… Granted, validated 10 October 2025
- [**PA/01035/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01035-25/san-pawl-il-bahar-change-of-use-from-class-1-residential): Change of use from Class 1 residential to Class 4B retail including internal and external alterations and fixing of signage. Granted, validated 26 February 2025
- [**PA/00552/25** Qormi](https://propertylist.mt/permit/PA-00552-25/qormi-alterations-to-pa-1368-24-to-construct-three-additional): Alterations to PA/1368/24 to construct three additional floors above the already approved showroom. Proposal includes two apartments at second and third… Pending, validated 5 May 2025, 4 floors plus a receded floor
- [**PA/07138/24** Swieqi](https://propertylist.mt/permit/PA-07138-24/swieqi-pool-at-approved-roof-level): Proposed pool at approved roof level, jacuzzi at receded floor and alterations to finishes materials to approved facade at PA/04069/22. Granted, validated 9 April 2025
- [**PA/05891/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05891-24/san-pawl-il-bahar-sanctioning-of-differences-in-a-two-bedroom): Sanctioning of differences in a two bedroom apartment located on 3rd floor in lieu of DS/151/22. Granted, validated 4 September 2024
- [**PA/04030/24** Swieqi](https://propertylist.mt/permit/PA-04030-24/swieqi-propose-the-installation-of-travertine-cladding-on): To propose the installation of travertine cladding on the facade and minor internal alterations at first floor level. Also, to sanction the construction of… Granted, validated 21 August 2024
- [**PA/01368/24** Qormi](https://propertylist.mt/permit/PA-01368-24/qormi-proposal-demolition-of-existing-garage): Proposal demolition of existing garage, and excavation, to construct a Class 4B showroom at ground and first floor, and separate staircase to access roof level. Granted, validated 13 March 2024, 2 floors
- [**PA/06001/23** Mellieha](https://propertylist.mt/permit/PA-06001-23/mellieha-internal-alterations-at-level-1): Proposed internal alterations at level 1, demolition of roof structures at level 2, vertical extension of dwelling at levels 2 and 3 plus parapet wall for… Granted, validated 18 October 2023, 3 floors
