---
title: "Simon John Calleja: planning applications in Malta | PropertyList"
url: https://propertylist.mt/applicant/simon-john-calleja
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Planning Authority applications by Simon John Calleja: projects, localities, approvals and refusals in Malta and Gozo.

Planning applications › Applicants › Simon John Calleja

# Simon John Calleja: planning applications

5 planning applications since 2 July 2024: 3 granted, 0 refused, 2 pending. Tallest granted: 3 floors.

- [**PA/04461/26** Cospicua (Bormla)](https://propertylist.mt/permit/PA-04461-26/cospicua-bormla-alterations-and-extensions-to-existing-property): Proposed alterations and extensions to existing property, including the extension of the first-floor level and the construction of a washroom level. Pending, validated 1 July 2026
- [**PA/07212/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07212-25/san-pawl-il-bahar-sanctioning-of-changes-from-application-permit-pa-06): Proposed sanctioning of changes from application permit PA/06473/16 and proposed shifting of existing canopy. Pending, validated 5 November 2025
- [**PA/01022/25** Vittoriosa (Birgu)](https://propertylist.mt/permit/PA-01022-25/vittoriosa-birgu-change-of-use-from-class-4b-and): Change of use from Class 4B and Class 4C as approved in PA/4817/15 to Class 1 and proposed internal alterations. Granted, validated 26 February 2025
- [**PA/06722/24** Gudja](https://propertylist.mt/permit/PA-06722-24/gudja-demolition-of-existing-property-and-construction-of): Demolition of existing property and construction of a garage at ground floor level and three apartments from first floor upwards including a penthouse. Granted, validated 2 October 2024, 3 floors plus a receded floor
- [**PA/05390/24** Vittoriosa (Birgu)](https://propertylist.mt/permit/PA-05390-24/vittoriosa-birgu-sanctioning-of-existing-and-changes-of-facade): Sanctioning of existing and changes of facade, canopy, and outdoor platform. Granted, validated 28 August 2024
