---
title: "Stephen Camilleri: planning applications in Malta | PropertyList"
url: https://propertylist.mt/applicant/stephen-camilleri
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Planning Authority applications by Stephen Camilleri: projects, localities, approvals and refusals in Malta and Gozo.

Planning applications › Applicants › Stephen Camilleri

# Stephen Camilleri: planning applications

5 planning applications since 5 July 2023: 4 granted, 0 refused, 1 pending. Tallest granted: 6 floors.

- [**PA/05842/26** Floriana](https://propertylist.mt/permit/PA-05842-26/floriana-sanction-removal-of-basement-ceiling): To sanction removal of basement ceiling, part excavation of basement and to change the use back to Class 1 residential unit from approved permit PA/866/12… Pending, validated 26 August 2026
- [**PA/07024/25** Zurrieq](https://propertylist.mt/permit/PA-07024-25/zurrieq-change-of-condition-in-pa4976-24-from-class): Change of condition in PA4976/24 from Class 4B retail convenience shop to Class 4B retail butcher shop. Granted, validated 29 October 2025
- [**PA/04976/24** Zurrieq](https://propertylist.mt/permit/PA-04976-24/zurrieq-change-of-use-of-private-car-garage): Change of use of private car garage as approved in PA5300/22 to a Class 4B retail shop, installation of gypsum partition to form a store and toilet. Granted, validated 31 July 2024
- [**PA/04212/24** Marsaskala](https://propertylist.mt/permit/PA-04212-24/marsaskala-sanctioning-of-first-floor-maisonette-and-its): Sanctioning of first floor maisonette and its underlying garage at semi-basement level from that approved in PA/04606/90. Granted, validated 3 July 2024
- [**PA/04728/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04728-23/san-pawl-il-bahar-demolish-existing-dwelling): To demolish existing dwelling. Proposed construction of ground floor garage, six overlying apartments at first, second, third, fourth, fifth and sixth floor… Granted, validated 26 September 2023, 6 floors plus a receded floor
