---
title: "Triq Santa Marta, Rabat (Gozo): planning applications, height limit and decisions | PropertyList"
url: https://propertylist.mt/area/rabat-gozo/triq-santa-marta
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Triq Santa Marta, Rabat (Gozo): 17 planning applications, 100% granted, typically 3 floors granted. Conditions, consultees and precedents from the planning…

Planning applications › Area intelligence › Rabat (Gozo) › Triq Santa Marta

# Triq Santa Marta, Rabat (Gozo): planning intelligence

17 applications on record: 13 granted, 0 refused, 1 pending (100% of decided granted). Granted buildings are typically 3 floors. 5 residential units granted. 3 new in the last 12 months.

## What the local plan allows

The official height limit for this street is on Rabat (Gozo)'s local plan height map; it hasn't been read automatically for this street yet. [See Rabat (Gozo)'s local plan maps](https://propertylist.mt/local-plan/Rabat%20(Gozo)).

## Height precedents

- [**PA/03701/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03701-26/rabat-gozo-construction-of-2-basement-garage-levels-for): Construction of 2 basement garage levels for private cars; Class 4B shop at ground floors inclusive of a Class 4C cafeteria, all interconnected with overlying C Granted, validated 10 June 2026, 3 floors plus a receded floor, decided 13 October 2026
- [**PA/07943/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07943-24/rabat-gozo-sanction-variations-in-site-footprint): To sanction variations in site footprint, internal layout at all levels; elements in facade, including fixing of sign and flat at third floor level instead of w Granted, validated 20 November 2024, 3 floors, decided 17 June 2025
- [**PA/05973/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-05973-25/rabat-gozo-extend-a-studio-flat-approved-under-pa-09842-19): To extend a studio flat approved under PA/09842/19 by converting a small commercial store into bedrooms. Also proposed alterations and creation of a loft to cre Granted, validated 17 September 2025, 2 floors plus a receded floor, decided 18 November 2025

## What the planning files say

No eapps planning files have been read for Triq Santa Marta yet.

## Pending now

- [**PA/05518/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05518-24/rabat-gozo-include-mini-market-and-butcher-to-approved): To include mini market and butcher to approved Class 4B and part change of use to Class 4C. Correction of levels of both shops. Pending, validated 28 August 2024

## Latest applications on Triq Santa Marta

- [**PA/03701/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03701-26/rabat-gozo-construction-of-2-basement-garage-levels-for): Construction of 2 basement garage levels for private cars; Class 4B shop at ground floors inclusive of a Class 4C cafeteria, all interconnected with overlying C Granted, validated 10 June 2026, 3 floors plus a receded floor
- [**PA/02985/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02985-26/rabat-gozo-demolish-existing-building-and-to-construct-a): To demolish existing building and to construct a Class 4B (retail) at ground and mezzanin level, Class 4A offices from first to receded floor and garages and st Granted, validated 6 May 2026
- [**PA/00409/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00409-26/rabat-gozo-sanction-internal-alterations-and-extension-at-back): To sanction internal alterations and extension at back of level 3 office (Class 4A) and sanction internal alterations at level 1 and level 2 and sanction altera Granted, validated 28 January 2026
- [**PA/05973/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-05973-25/rabat-gozo-extend-a-studio-flat-approved-under-pa-09842-19): To extend a studio flat approved under PA/09842/19 by converting a small commercial store into bedrooms. Also proposed alterations and creation of a loft to cre Granted, validated 17 September 2025, 2 floors plus a receded floor
- [**PA/00882/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00882-25/rabat-gozo-renew-permission-pa467-20-to-renew-permission): To renew permission PA467/20 - To renew permission PA3303/14 - Renewal of PA4541/09 - To construct basement garage, carry out internal alterations, change of us Granted, validated 17 March 2025
- [**PA/07943/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07943-24/rabat-gozo-sanction-variations-in-site-footprint): To sanction variations in site footprint, internal layout at all levels; elements in facade, including fixing of sign and flat at third floor level instead of w Granted, validated 20 November 2024, 3 floors
- [**PA/07531/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07531-24/rabat-gozo-change-of-use-of-garage-to-public): Change of use of garage to Public Service Garage. Granted, validated 6 November 2024
- [**PA/07442/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07442-24/rabat-gozo-sanction-alterations-to-access-to-offices): To sanction alterations to access to offices (Class 4A) from that approved in PA/08341/18. Alterations include changes to stairs, introduction of a ramp and oth Granted, validated 30 October 2024
- [**PA/05833/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05833-24/rabat-gozo-change-use-of-intermediate-level-approved-in): To change use of intermediate level approved in PA4244/18 from Class 4A office to Class 3C (dance studio). Granted, validated 4 September 2024
- [**PA/05518/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05518-24/rabat-gozo-include-mini-market-and-butcher-to-approved): To include mini market and butcher to approved Class 4B and part change of use to Class 4C. Correction of levels of both shops. Pending, validated 28 August 2024
- [**PA/04225/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04225-24/rabat-gozo-change-in-use-from-garage-to-retail): To change in use from garage to retail (Class 4B), fix sign and add wc. Granted, validated 3 July 2024
- [**PA/03923/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-03923-24/rabat-gozo-sanction-apartment-as-built): To sanction apartment as built. Differences from approved drawings in PA/09842/19 consist of changes to the internal layout and to the slight shifting of window Granted, validated 22 August 2024
- [**PA/03917/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-03917-24/rabat-gozo-change-of-use-from-class-4b-approved): Change of use from Class 4B approved in PA/09842/19 to Class 4B (butcher) and minor internal changes. Granted, validated 26 June 2024
- [**PA/02250/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-02250-24/rabat-gozo-sanction-variations-from-pa3257-18-namely-addition-of): To sanction variations from PA3257/18 namely addition of domestic store at receded floor level, minor internal changes at all level and alterations to facade. Granted, validated 17 April 2024
- [**PA/01005/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01005-22/rabat-gozo-sanction-dwelling-namely-washroom-on-the-receded): To sanction dwelling namely washroom on the receded floor and internal alterations. Status being checked
- [**PA/01810/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-01810-21/rabat-gozo-sanction-the-shifting-of-use-of-class): To sanction the shifting of use of class 4b approved in PA 3925/01 from ground floor to basement level and to sanction the use of ground floor to class 4c snack Status being checked
- [**PA/00467/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00467-20/rabat-gozo-renew-permission-pa-3303-14-renewal-of): To renew permission PA 3303/14 - Renewal of PA 4541/09 - To construct basement garage, carry out internal alterations, change of use of ground floor garage Status being checked

Other streets in Rabat (Gozo): [Triq it-Tabib Anton Tabone](https://propertylist.mt/area/rabat-gozo/triq-it-tabib-anton-tabone), [Triq ir-Repubblika](https://propertylist.mt/area/rabat-gozo/triq-ir-repubblika), [Triq Ghajn Qatet](https://propertylist.mt/area/rabat-gozo/triq-ghajn-qatet), [Triq Fortunato Mizzi](https://propertylist.mt/area/rabat-gozo/triq-fortunato-mizzi), [Triq il-Kapuccini](https://propertylist.mt/area/rabat-gozo/triq-il-kapuccini), [Triq Santa Dminka](https://propertylist.mt/area/rabat-gozo/triq-santa-dminka), [Triq Giorgio Borg Olivier](https://propertylist.mt/area/rabat-gozo/triq-giorgio-borg-olivier), [Triq l-Arcisqof Pietru Pace](https://propertylist.mt/area/rabat-gozo/triq-l-arcisqof-pietru-pace), [Triq l-Imghallem](https://propertylist.mt/area/rabat-gozo/triq-l-imghallem), [Triq Sant' Orsla](https://propertylist.mt/area/rabat-gozo/triq-sant-orsla), [Triq Wied Sara](https://propertylist.mt/area/rabat-gozo/triq-wied-sara), [Triq ta' Wara s-Sur](https://propertylist.mt/area/rabat-gozo/triq-ta-wara-s-sur).
