propertylist

Triq Bordino, San Pawl il-Bahar: planning intelligence

11 applications on record: 5 granted, 0 refused, 2 pending (100% of decided granted). Granted buildings are typically 6 floors. 8 residential units granted. 4 new in the last 12 months.

What the local plan allows

Official height limit (2006 local plan, map 41): 5 Floors, an overall height of 22.90 m (23.80 m with a basement, 25.00 m with a semi-basement) under the PA's interpretation of height limitation.

Policy zones along the street: St.Paul's Bay Village/Bu gibb a/ Qawra (50%); St.Paul's Bay Village/Bu gibb a/Qawra Residential Area NWUS 3 (50%).

The 2006 local plan limit here is 5 floors; granted buildings are typically 6 floors, and the tallest grants went above the 2006 limit (later policy, DC15 and the 2024 height rules, allows more in places).

Along the street the policy map shows St.Paul's Bay Village/Bu gibb a/ Qawra (50% of the frontage); St.Paul's Bay Village/Bu gibb a/Qawra Residential Area NWUS 3 (50% of the frontage).

Height precedents

  • PA/00824/25 San Pawl il-Bahar: Renewal to PA6229/16 - Conversion of 2 no. penthouses as approved by PA3636/08 into 2 no. apartments at fifth floor level and propose 2 no. apartments at recede Granted, validated 12 February 2025, 6 floors plus a receded floor, decided 14 May 2025
  • PA/03340/23 San Pawl il-Bahar: Renewal of permit PA/05589/18 - Amended application to PA/000577/17 –The proposed works are to change the approved receded apartment at 6th floor level to an ap Granted, validated 4 August 2023, 6 floors plus a receded floor

What the planning files say

No eapps planning files have been read for Triq Bordino yet.

Pending now

  • PA/03791/26 San Pawl il-Bahar: To demolish existing Class 4A offices and Class 2C training centre, and overlying 4 apartments. Excavate site and construct Class 3A hostel including ancillary Pending, validated 10 June 2026, 7 floors plus a receded floor
  • PA/04356/24 San Pawl il-Bahar: Proposed alterations to existing front balconies at Elevated Ground floor level. Proposal also includes variations from the official building alignments. Pending, validated 10 July 2024

Latest applications on Triq Bordino

  • PA/03791/26 San Pawl il-Bahar: To demolish existing Class 4A offices and Class 2C training centre, and overlying 4 apartments. Excavate site and construct Class 3A hostel including ancillary Pending, validated 10 June 2026, 7 floors plus a receded floor
  • PA/02501/26 San Pawl il-Bahar: To sanction variations carried out to apartments (originally approved by PA6321/17) at fifth, sixth and receded floor levels. Variations include changes in floo Granted, validated 22 April 2026
  • PA/02453/26 San Pawl il-Bahar: Sanctioning of variations from PA1642/17 (minor changes to apertures and formation of kitchen), proposed closing of door from common stairwell and formation of Granted, validated 22 May 2026
  • PA/01150/26 San Pawl il-Bahar: Proposed alterations to existing front balconies. Proposal also includes variations from the official building alignments. Granted, validated 4 March 2026
  • PA/00824/25 San Pawl il-Bahar: Renewal to PA6229/16 - Conversion of 2 no. penthouses as approved by PA3636/08 into 2 no. apartments at fifth floor level and propose 2 no. apartments at recede Granted, validated 12 February 2025, 6 floors plus a receded floor
  • PA/04356/24 San Pawl il-Bahar: Proposed alterations to existing front balconies at Elevated Ground floor level. Proposal also includes variations from the official building alignments. Pending, validated 10 July 2024
  • PA/03340/23 San Pawl il-Bahar: Renewal of permit PA/05589/18 - Amended application to PA/000577/17 –The proposed works are to change the approved receded apartment at 6th floor level to an ap Granted, validated 4 August 2023, 6 floors plus a receded floor
  • PA/02901/22 San Pawl il-Bahar: Change of use from apartment to Class 4B shop including minor internal changes and proposed fixing of sign. Status being checked
  • PA/01381/22 San Pawl il-Bahar: Proposed sanctioning of ground floor apartment as built; together with proposed internal alterations and an extension at the back of the property. Status being checked
  • PA/03481/21 San Pawl il-Bahar: To sanction layout as existing from previous permit PB/1758/91/2489/90 Status being checked
  • PA/00490/20 San Pawl il-Bahar: Alterations at ground floor, construction of rear balconies at first, second and third floor levels. Demolition of existing roof slab, alterations and extension Status being checked, 7 floors plus a receded floor

Other streets in San Pawl il-Bahar: Triq San Pawl, Triq il-Qawra, Triq it-Turisti, Triq Burmarrad, Triq it-Tamar, Triq Piscopo Macedonia, Dawret il-Gzejjer, Triq il-Wardija, Triq Sant' Antnin, Triq it-Trunciera, Triq Sir Luigi Preziosi, Triq Parades.