Triq Pawlu Mifsud, Zebbug: planning intelligence
8 applications on record: 4 granted, 0 refused, 0 pending (100% of decided granted). Granted buildings are typically 4 floors. 24 residential units granted. 4 new in the last 12 months.
What the local plan allows
The official height limit for this street is on Zebbug's local plan height map; it hasn't been read automatically for this street yet. See Zebbug's local plan maps.
Policy zones along the street: Hal-Mula Mixed Use Area (Area A)~SMZGO1 (53%); Green Area~SMSE04 (47%).
Along the street the policy map shows Hal-Mula Mixed Use Area (Area A)~SMZGO1 (53% of the frontage); Green Area~SMSE04 (47% of the frontage).
Height precedents
- PA/02460/24 Zebbug: Proposed excavation and construction of 38 garages at basement level -1 and level -2, and substation, 5 no. Class 5A Light industrial garages at ground floor le
- PA/02667/24 Zebbug: Application includes the demolition of the existing washroom at second floor level & the construction of 3 bedroom apartments at first, second & third floor tog
- PA/00689/24 Zebbug: Sanctioning building as built not as per approved in PA2297/22, sanctioning include minor internal and external modifications. Also included in this application
What the planning files say
Latest applications on Triq Pawlu Mifsud
- PA/03842/26 Zebbug: To sanction minor internal and external alteration from the approved PA/02667/24.
- PA/02197/26 Zebbug: Construction of 11 apartments, washrooms and pool at roof level, over existing airspace
- PA/01942/26 Zebbug: Sanctioning of the existing first floor maisonette as built from the approved PB/01399/92and to construct 3 in no.three bedroom apartments at first, second and
- PA/00957/26 Zebbug: Construction of six apartments, washroom and pool at roof level, and the installation of a lift.
- PA/02667/24 Zebbug: Application includes the demolition of the existing washroom at second floor level & the construction of 3 bedroom apartments at first, second & third floor tog
- PA/02460/24 Zebbug: Proposed excavation and construction of 38 garages at basement level -1 and level -2, and substation, 5 no. Class 5A Light industrial garages at ground floor le
- PA/00689/24 Zebbug: Sanctioning building as built not as per approved in PA2297/22, sanctioning include minor internal and external modifications. Also included in this application
- PA/02297/22 Zebbug: Sanctioning of existing property approved in PA5265/93, Proposed change of use from garage to Class 5A at ground floor level, proposed construction of an additi
Other streets in Zebbug: Triq l-Imdina, Triq il-Kbira, Triq is-Siggiewi, Triq il-Grazzja, Triq Paris, Vjal il-Helsien, Triq Frans Sammut, Triq Dun Karm Psaila, Triq Luigi Fontana, Triq Mikielang Sapiano, Triq Luret Cutajar, Triq il-Mithna.