13 planning applications since 2021: 5 granted, 0 refused, 0 pending. Main localities: Naxxar (3), Xewkija (2), Mosta (2), Gzira (2), Siggiewi (1), Rabat (1).
- PA/02454/25 Mosta: To sanction minor alterations and roof structures from approved permits DN923/09 and PB229/84.
- PA/01221/25 Mosta: To sanction minor alterations from the approved permit PA/07588/17.
- PA/01081/25 Xewkija: Renewal of PA/06957/16: Proposed construction of boundary wall and gates.
- PA/06581/24 Naxxar: To remove poles and aerial lines and to relocate the position of 2 existing transformer centres and include safety barriers.
- PA/06012/24 Attard: To sanction the Enemalta Distribution centre as built, correction of the site configuration, alterations to facades and buildings, part boundary wall…
- PA/02903/24 Xewkija: Construction of a pool at roof level.
- PA/02084/24 Gzira: Change of use from gang room to a substation and internal and external alterations including the enlargement of the external door.
- PA/01293/24 Siggiewi: To construct an Enemalta Distribution Centre.
- PA/07783/23 Naxxar: Installation of a temporary 33kV/11kV outdoor substation at Naxxar.
- PA/03172/22 Naxxar: To construct an electricity distribution centre at Naxxar.
- PA/00830/22 Birkirkara: To install an awning on the existing facade.
- PA/02749/21 Rabat: The dismantling of poles and aerial lines extending from Bingemma Fort to Rabat tas-Salib to Tal-Majjistra, the installation of two new TC’s (one temporary)…
- PA/01289/21 Gzira: To construct a passageway to an existing sub-station