---
title: "Perit Christopher Tabone, KT3D Studio (Architecture & Design): contact and planning applications |… (page 2) | PropertyList"
url: https://propertylist.mt/perit/christopher-tabone?page=2
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Perit Christopher Tabone, KT3D Studio (Architecture & Design): contact details and 55 planning applications, mostly in Sliema, St Julians, San Pawl…

Planning applications › Periti › Christopher Tabone

# Perit Christopher Tabone

## Contact Christopher Tabone

Perit Christopher Tabone (warrant no. 1271) is company director and architect at KT3D Studio in Sliema, which works across Malta and Gozo. The firm's site says he holds a Master's degree in Architectural Conservation and Contemporary Design. The site also names the director as 'Perit Kris Tabone' in one place.

- **Practice:** KT3D Studio (Architecture & Design)
- **Phone:** [+356 9942 8400](tel:+35699428400)
- **Website:** [kt3dstudio.com](https://kt3dstudio.com/)
- **Office:** 27, Triq L. Graham, Sliema, Malta
- **Expertise:** Planning Authority applications and permit drawings, structural alterations, measured and 3D laser surveys, architectural and interior design, construction contract administration, property valuations, condition reports, compliance and attestation reports

From public sources: [KT3D Studio home page](https://kt3dstudio.com/), [KT3D Studio – Perit in Malta](https://kt3dstudio.com/perit-malta.html).

Are you Christopher Tabone? [Manage this page](https://propertylist.mt/perit/christopher-tabone?claim=1).

## Register of Periti

- Registration no. 1271: Tabone Christopher, year of issue 2023

Source: Register of Periti: List of Warranted Periti (Architect) under the Periti Act (Cap. 622), as at 31 December 2025, published in the Government Gazette of Malta no. 21,617 of 6 April 2026. Matched by name. [See the full list](https://propertylist.mt/periti/register).

55 planning applications since 2021: 41 granted, 1 refused, 8 pending. Tallest granted: 10 floors. Main localities: [Sliema](https://propertylist.mt/planning-applications/sliema) (10), [St Julians](https://propertylist.mt/planning-applications/st-julians) (6), [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar) (5), [Gzira](https://propertylist.mt/planning-applications/gzira) (5), [Birkirkara](https://propertylist.mt/planning-applications/birkirkara) (4), [Hamrun](https://propertylist.mt/planning-applications/hamrun) (3).

- [**PA/00180/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00180-24/san-pawl-il-bahar-propose-internal-alterations-and-demolish-the-ceilin): To propose internal alterations and demolish the ceiling of the first floor maisonette and to construct additional five units including a receded floor… Granted, validated 24 January 2024
- [**PA/07640/23** Hamrun](https://propertylist.mt/permit/PA-07640-23/hamrun-retain-the-existing-facade-and-restore-it): To retain the existing facade and restore it, and to demolish the internal rooms and excavate one floor for parking at basement level. To construct four… Granted, validated 3 January 2024, 4 floors plus a receded floor
- [**PA/06397/23** Hamrun](https://propertylist.mt/permit/PA-06397-23/hamrun-reduce-floor-level-and-reduce-from-four): To reduce floor level and reduce from four unit apartments to one dwelling with a domestic store at ground floor and the rest of the living spaces on 1st, 2nd… Granted, validated 22 November 2023, 4 floors
- [**PA/05349/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05349-23/san-pawl-il-bahar-demolish-existing-ground-floor-maisonette-and-first): To demolish existing ground floor maisonette and first floor maisonette excavate for basement floor for garages and construct seven apartments and a penthouse… Granted, validated 1 November 2023, 8 floors
- [**PA/02428/21** Mellieha](https://propertylist.mt/permit/PA-02428-21/mellieha-sanction-the-existing-penthouse-from-pa-02049-06): To sanction the existing penthouse from PA 02049/06 to as currently built, and to propose an outdoor spiral staircase from the privately owned back terrace to… Status being checked

[Newer](https://propertylist.mt/perit/christopher-tabone) Page 2 of 2
