---
title: "Perit Duncan Muscat: contact and planning applications (page 2) | PropertyList"
url: https://propertylist.mt/perit/duncan-muscat?page=2
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Perit Duncan Muscat: contact details and 116 planning applications, mostly in San Pawl il-Bahar, St Julians, Pieta, with approvals and refusals.

Planning applications › Periti › Duncan Muscat

# Perit Duncan Muscat

## Contact Duncan Muscat

- **Phone:** [21432178](tel:21432178)
- **Mobile:** [99897969](tel:99897969)
- **Email:** [duncan@peritmuscat.com](mailto:duncan@peritmuscat.com)
- **Office:** 2, Kent Court, St. Paul's Street, Naxxar, Malta
- **Expertise:** Architectural Design - Residential, Architectural Design - Commercial, Urban Design; Civil Engineering: Structural Engineering, Construction Engineering, Coastal Engineering, Facade Engineering; Other Expertise: Valuations, Project Management, Construction Management, Quantity Surveying

From public sources: [Kamra tal-Periti directory](https://kamratalperiti.org/membership-account/profile/peritduncan), [Kamra tal-Periti directory](https://kamratalperiti.org/membership-account/profile/peritduncan).

Are you Duncan Muscat? [Manage this page](https://propertylist.mt/perit/duncan-muscat?claim=1).

## Register of Periti

- Registration no. 410: Muscat Duncan, year of issue 2001

Source: Register of Periti: List of Warranted Periti (Architect) under the Periti Act (Cap. 622), as at 31 December 2025, published in the Government Gazette of Malta no. 21,617 of 6 April 2026. Matched by name. [See the full list](https://propertylist.mt/periti/register).

116 planning applications since 21 August 2020: 57 granted, 10 refused, 9 pending. Tallest granted: 6 floors. Main localities: [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar) (13), [St Julians](https://propertylist.mt/planning-applications/st-julians) (12), [Pieta](https://propertylist.mt/planning-applications/pieta) (12), [Mellieha](https://propertylist.mt/planning-applications/mellieha) (6), [Zejtun](https://propertylist.mt/planning-applications/zejtun) (5), [Sliema](https://propertylist.mt/planning-applications/sliema) (5).

- [**PA/02503/24** Zejtun](https://propertylist.mt/permit/PA-02503-24/zejtun-demolition-and-construction-of-existing-boundary-wall): Demolition and construction of existing boundary wall to be repaired due to dilapidated condition and installation of steel gate to existing borehole. Withdrawn, validated 30 April 2024
- [**PA/02405/24** Pieta](https://propertylist.mt/permit/PA-02405-24/pieta-internal-alterations-and-to-change-use-of): Internal alterations and to change use of approved garage in PA/02174/21 into local shop Class 4B. Refused, validated 30 April 2024
- [**PA/01902/24** Pieta](https://propertylist.mt/permit/PA-01902-24/pieta-develop-pool-and-move-staircase-at-roof): To develop pool and move staircase at roof level of penthouse as approved in permits PA/1188/22 and PA/2761/21. Reduction of apartment 9 from two-bedroom to… Granted, validated 3 April 2024
- [**PA/01569/24** Zabbar](https://propertylist.mt/permit/PA-01569-24/zabbar-sanction-internal-alterations-including-the-reduction-of): To sanction internal alterations including the reduction of built up areas at first floor level, various apertures at ground floor and first floor level,… Granted, validated 31 July 2024
- [**PA/01511/24** Zabbar](https://propertylist.mt/permit/PA-01511-24/zabbar-internal-and-external-modifications-in-backyard): Internal and external modifications in backyard, to excavate and develop swimming pool and jacuzzi at ground floor level and addition of pump room. Granted, validated 13 March 2024
- [**PA/01350/24** Hamrun](https://propertylist.mt/permit/PA-01350-24/hamrun-change-of-use-from-vacant-premises-pre-1968): Change of use from vacant premises pre-1968 to garage. Withdrawn, validated 6 March 2024
- [**PA/00792/24** Iklin](https://propertylist.mt/permit/PA-00792-24/iklin-alterations-to-existing-dwelling-including-internal-walls): Alterations to existing dwelling including internal walls, staircase, and lift, and construction of an additional floor (3rd floor and washroom). Granted, validated 14 February 2024, 4 floors
- [**PA/00651/24** Sliema](https://propertylist.mt/permit/PA-00651-24/sliema-carry-out-alterations-to-pa3196-21): To carry out alterations to PA3196/21 (Construction of basement level -3, ramp in basement floor levels and removal of car lift, and carry out internal… Granted, validated 7 February 2024
- [**PA/00549/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00549-24/san-pawl-il-bahar-internal-and-external-modifications-in-backyard-and): Internal and external modifications in backyard and facade at ground floor maisonette and basement level. Granted, validated 7 February 2024
- [**PA/00287/24** Luqa](https://propertylist.mt/permit/PA-00287-24/luqa-develop-terrace-of-existing-penthouse-and-additional): To develop terrace of existing penthouse and additional penthouse at fourth floor level. Granted, validated 24 January 2024, 5 floors
- [**PA/07676/23** Mellieha](https://propertylist.mt/permit/PA-07676-23/mellieha-sanction-washroom-as-built-at-receded-floor): To sanction washroom as built at receded floor level at Triq it-Tramuntana c/w Triq il-Qalb Imqaddsa and Triq il-Mithna l-Gdida, Mellieha. Granted, validated 24 January 2024
- [**PA/07658/23** Santa Lucija](https://propertylist.mt/permit/PA-07658-23/santa-lucija-internal-alterations-and-construction-of-washrooms): Internal alterations and construction of washrooms, removal of internal walls at ground and first floor level and rebuilding of stairwell leaving to roof… Granted, validated 3 January 2024
- [**PA/06428/23** Qormi](https://propertylist.mt/permit/PA-06428-23/qormi-change-of-use-from-warehouses-workshops-at-second): Change of use from warehouses/workshops at second floor level into Class 5A light industries and to carry out internal alterations. Granted, validated 1 November 2023
- [**PA/06198/23** Tarxien](https://propertylist.mt/permit/PA-06198-23/tarxien-sanction-as-built-internal-alterations-and-additions): To sanction as built internal alterations and additions to existing dwelling. Granted, validated 15 December 2023
- [**PA/06070/23** Pembroke](https://propertylist.mt/permit/PA-06070-23/pembroke-renewal-of-pa7822-17-proposed-construction-of): Renewal of PA7822/17 - Proposed construction of 8 self catering units to form accommodation area to existing english language speaking complex Class 2C (b).… Granted, validated 20 March 2024
- [**PA/05912/23** St Julians](https://propertylist.mt/permit/PA-05912-23/st-julians-sanction-outdoor-play-area-and-landscaping-as): To sanction outdoor play area and landscaping as built and to construct ramp for access for all to the play area. Granted, validated 11 October 2023
- [**PA/05726/23** Gudja](https://propertylist.mt/permit/PA-05726-23/gudja-construct-ground-floor-garage): To construct ground floor garage, 2 apartments at first and second floor levels, and 1 duplex apartment at third and receded floor levels. Granted, validated 5 January 2024, 4 floors plus a receded floor
- [**PA/05643/23** Rabat](https://propertylist.mt/permit/PA-05643-23/rabat-construct-pump-room-adjacent-to-water-reservoir): To construct pump room adjacent to water reservoir as approved in PA1730/21. Granted, validated 27 September 2023
- [**PA/05319/23** Gzira](https://propertylist.mt/permit/PA-05319-23/gzira-renewal-of-pa3131-18-to-convert-existing): Renewal of PA3131/18 - To convert existing penthouse into flat and reconstruct penthouse. Granted, validated 19 October 2023
- [**PA/04865/23** Qormi](https://propertylist.mt/permit/PA-04865-23/qormi-renewal-of-pa9949-18-replacement-of-dangerous): Renewal of PA9949/18 - Replacement of dangerous roof structure of existing warehouse Class 6A, carry out alterations to facade and construct staircase with… Granted, validated 29 September 2023
- [**PA/04624/23** San Gwann](https://propertylist.mt/permit/PA-04624-23/san-gwann-renewal-permit-of-pa7596-18-to-convert): To renewal permit of PA7596/18 - To convert existing penthouse into two apartments and to construct overlying two penthouses and to sanction balcony railings… Granted, validated 4 October 2023
- [**PA/04347/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04347-23/san-pawl-il-bahar-change-of-use-from-2-car-garage): Change of use from 2 car garage to Class 4B retail outlet and alteration to main aperture on façade. Granted, validated 19 July 2023
- [**PA/04022/23** Pieta](https://propertylist.mt/permit/PA-04022-23/pieta-construct-block-of-2-maisonettes): To construct block of 2 maisonettes, 15 apartments and overlying penthouse (18 units in total) and underlying 2 stories of garages and to replace one parking… Granted, validated 5 July 2023
- [**PA/03923/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03923-23/san-pawl-il-bahar-sanction-railing-and-to-split-the-4th): To sanction railing and to split the 4th floor apartment into 2 apartments and to develop 2 apartments instead of the penthouse at 5th floor level. An… Granted, validated 28 June 2023, 6 floors plus a receded floor
- [**PA/03540/23** Naxxar](https://propertylist.mt/permit/PA-03540-23/naxxar-sanction-modification-to-pre-1967-farmhouse-and-construct): To sanction modification to pre-1967 farmhouse and construct roof over garage Refused, validated 5 July 2023
- [**PA/03427/23** Hamrun](https://propertylist.mt/permit/PA-03427-23/hamrun-sanction-internal-wall-and-external-openings): To sanction internal wall and external openings, to construct internal wall and change use from local shop to 3 garages. Granted, validated 14 June 2023
- [**PA/02799/23** St Julians](https://propertylist.mt/permit/PA-02799-23/st-julians-construction-of-emergency-door-and-adjoining-staircase): Construction of emergency door and adjoining staircase. Granted, validated 17 May 2023
- [**PA/02604/23** Marsa](https://propertylist.mt/permit/PA-02604-23/marsa-sanction-the-existing-plan-and-the-use): To sanction the existing plan and the use as a lotto office/betting shop, and to execute minor alterations (modifications of internal walls and apertures,… Granted, validated 10 May 2023
- [**PA/02524/23** Rabat](https://propertylist.mt/permit/PA-02524-23/rabat-remove-ramp-and-install-lift): To remove ramp and install lift, to increase an entrance and a circular staircase leading from ground floor to basement level on Triq Manuel Vitale and to… Granted, validated 3 May 2023
- [**PA/02038/23** Pieta](https://propertylist.mt/permit/PA-02038-23/pieta-construct-basement-garages): To construct basement garages, 2 maisonettes, 15 apartments and 2 penthouses and to sanction ramp at basement -1. Granted, validated 12 April 2023
- [**PA/01123/23** Qormi](https://propertylist.mt/permit/PA-01123-23/qormi-development-proposed-includes): The development proposed includes, the sanctioning of all alterations from original permits (as indicated in uploaded plans, sections and elevations.)… Refused, validated 26 July 2023
- [**PA/00291/23** Sliema](https://propertylist.mt/permit/PA-00291-23/sliema-demolish-existing-dilapidated-building-and-to-rebuild): To demolish existing dilapidated building and to rebuild facades as existing, construct basement garage, ground floor maisonette, 2 apartments at first and… Granted, validated 15 March 2023, 3 floors
- [**PA/02719/22** San Gwann](https://propertylist.mt/permit/PA-02719-22/san-gwann-change-of-use-form-existing-garage-to): To change of use form existing garage to Class 3C, play area and Class 4D, and carry out minor internal alterations and display of sign. Status being checked
- [**PA/02688/22** Luqa](https://propertylist.mt/permit/PA-02688-22/luqa-demolition-of-existing-buildings-and-construction-of): Demolition of existing buildings and construction of 15 basement garages, 3 apartments at elevated ground, 12 apartments at first, second, and third floor and… Status being checked, 4 floors plus a receded floor
- [**PA/02560/22** Mosta](https://propertylist.mt/permit/PA-02560-22/mosta-sanction-existing-property-approved-by-pb03854-85-as): To sanction existing property approved by PB03854/85 as built, sanction p.v panels at upper roof level and construct 1m parapet wall at upper roof level and… Status being checked
- [**PA/02358/22** Pieta](https://propertylist.mt/permit/PA-02358-22/pieta-demolish-existing-structures-and-construct-basement-and): To demolish existing structures and construct basement and ground floor garages accessible from approved permit PA7241/16 and PA02761/21, 15 apartments at… Status being checked, 6 floors plus a receded floor
- [**PA/02326/22** Hamrun](https://propertylist.mt/permit/PA-02326-22/hamrun-sanction-alterations-to-facade-from-that-approved): To sanction alterations to facade from that approved in PA00710/94 and construct store in backyard and carry out internal and external alterations. Status being checked
- [**PA/02112/22** Swieqi](https://propertylist.mt/permit/PA-02112-22/swieqi-construct-additional-apartment-and-penthouse-with-a): To construct additional apartment and penthouse with a different layout from that approved in PA04484/15, and carry out alterations to existing facade. Status being checked
- [**PA/01646/22** St Julians](https://propertylist.mt/permit/PA-01646-22/st-julians-sanction-canopy-and-sign-from-that-approved): To sanction canopy and sign from that approved in PA00334/02. Status being checked
- [**PA/01271/22** Birkirkara](https://propertylist.mt/permit/PA-01271-22/birkirkara-demolish-existing-washroom): To demolish existing washroom, carry out minor internal alterations at first floor level and construct 2 rooms at second floor level. Status being checked, 3 floors
- [**PA/01200/22** Pieta](https://propertylist.mt/permit/PA-01200-22/pieta-carry-out-alterations-to-local-shop-class): To carry out alterations to Local Shop Class 4B, garages and stairs (as approved in PA02174/21) at ground floor level. Status being checked
- [**PA/01188/22** Pieta](https://propertylist.mt/permit/PA-01188-22/pieta-convert-approved-3-penthouses-at-setback-floor): To convert approved 3 penthouses at setback floor level into 5 apartments at fifth floor level and construct 3 penthouses at setback floor level. Status being checked, 6 floors plus a receded floor
- [**PA/01113/22** Msida](https://propertylist.mt/permit/PA-01113-22/msida-convert-existing-washroom-into-apartment-at-fourth): To convert existing washroom into apartment at fourth floor level and construct duplex penthouse at fifth and setback floor levels and construct lift. Status being checked, 5 floors plus a receded floor
- [**PA/00906/22** Hamrun](https://propertylist.mt/permit/PA-00906-22/hamrun-change-of-use-from-vacant-space-to): To change of use from vacant space to Class 2A clinic and carry out internal alterations. Status being checked
- [**PA/00632/22** Attard](https://propertylist.mt/permit/PA-00632-22/attard-construct-agricultural-store): To construct agricultural store. Status being checked
- [**PA/00330/22** Zabbar](https://propertylist.mt/permit/PA-00330-22/zabbar-remodelling-of-townhouse-including-redevelopment-of-rooms): Remodelling of townhouse including redevelopment of rooms at back of property due to heavily deteriorated roof slabs and cracked walls, internal alterations,… Status being checked
- [**PA/03634/21** Zejtun](https://propertylist.mt/permit/PA-03634-21/zejtun-carry-out-external-alterations-to-existing-facade): To carry out external alterations to existing facade; lowering of garage door and construction of 'opramorta'. Status being checked
- [**PA/03569/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03569-21/san-pawl-il-bahar-sanction-existing-property-approved-by-pb6605-82-435): To sanction existing property approved by PB6605/82/4359/81 as built Status being checked
- [**PA/03339/21** Sliema](https://propertylist.mt/permit/PA-03339-21/sliema-alterations-and-extension-to-existing-dwelling): Proposed alterations and extension to existing dwelling, construction of washroom at roof level, excavation of basement, restoration of facade and replacement… Status being checked
- [**PA/03196/21** Sliema](https://propertylist.mt/permit/PA-03196-21/sliema-construction-of-basement-level-3): Construction of basement level -3, ramp in basement floor levels and removal of car lift, and carry out internal alterations at all floors and levels with a… Status being checked

[Newer](https://propertylist.mt/perit/duncan-muscat) Page 2 of 3 [Older](https://propertylist.mt/perit/duncan-muscat?page=3)
