> Status being checked planning application in San Pawl il-Bahar: To sanction existing ground floor level and construction of a new dwelling Perit Nathaniel…

Planning applications › San Pawl il-Bahar › PA0009021

# PA/00090/21: sanction existing ground floor level and construction in San Pawl il-Bahar

19/21, Triq Patri Guzepp Calleja, San Pawl il-Bahar

To sanction existing ground floor level and construction of a new dwelling

- **Status:** Status being checked
- **Location:** 19/21, Triq Patri Guzepp Calleja, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Mr Victor Mifsud
- **Perit:** [Perit Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)
- **Type of works:** Sanctioning
- **Residential units:** 1

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00090/21)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00090&caseYear=21)

## Planning activity around 19/21, Triq Patri Guzepp Calleja, San Pawl il-Bahar

260 other applications within 300 m: 161 granted, 8 refused, 26 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/07562/24).

On Triq Patri Guzepp Calleja: 10 other applications, 7 granted and 0 refused; granted buildings are typically 7 floors, the tallest 7. Periti active on this street: [Mark Frendo](https://propertylist.mt/perit/mark-frendo).

Approval estimate for sanctioning applications like this here: about 91% (likely range 61–100%, medium reliability, from 70 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03598/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03598-22/san-pawl-il-bahar-erection-of-5-new-residential-levels-over): Proposed erection of 5 new residential levels over existing apartment block that include 2 in no. 1 bedroom apartments, 1 in no. 3 bedroom (duplex) apartment,… Status being checked, 27 m away
- [**PA/05967/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05967-26/san-pawl-il-bahar-alterations-to-fa-ade-balconies): Alterations to façade balconies. Granted, validated 8 October 2026, 30 m away
- [**PA/07932/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07932-25/san-pawl-il-bahar-demolition-of-the-existing-two-storey-structure): Demolition of the existing two-storey structure, retaining the shared staircase, and the construction of 3 private garages with 5 overlying apartments and a… Granted, validated 10 December 2025, 7 floors plus a receded floor, 30 m away
- [**PA/06177/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06177-24/san-pawl-il-bahar-modifications-to-approved-pa-3598-22-consisting-of): Modifications to approved PA 3598/22 consisting of alteration to internal balcony's for third party property's first and second floors, construction of… Granted, validated 3 September 2025, 30 m away
- [**PA/05339/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05339-24/san-pawl-il-bahar-demolition-of-a-ground-floor-and-first): The demolition of a ground floor and first floor maisonette to construct a ground floor garage and 6 overlying residential units. Granted, validated 8 October 2024, 31 m away
- [**PA/03922/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03922-23/san-pawl-il-bahar-internal-alterations-to-existing-pre-67-ground-floor): Proposed internal alterations to existing pre-67 Ground Floor Maisonette including proposed extension of bedroom with en-suite in backyard and alterations to… Granted, validated 29 September 2023, 37 m away
- [**PA/01301/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01301-26/san-pawl-il-bahar-construction-of-ground-floor-staircase): Construction of ground floor staircase, alteration to existing first floor, construction of 6 overlying floors including the receded floor, development to… Granted, validated 15 April 2026, 7 floors plus a receded floor, 40 m away
- [**PA/02855/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02855-26/san-pawl-il-bahar-replace-ceilings-and-carry-out-minor-internal): To replace ceilings and carry out minor internal alterations. Granted, validated 8 June 2026, 43 m away
- [**PA/02573/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02573-25/san-pawl-il-bahar-demolish-existing-ground-floor-garage-and-reconstruc): To demolish existing ground floor garage and reconstruction of an underground reservoir, ground floor Class 4A office and overlying seven residential units. Granted, validated 16 April 2025, 43 m away
- [**PA/04684/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04684-26/san-pawl-il-bahar-sanctioning-of-apartments-as-built-over-pa-05960-09): Sanctioning of apartments as built over PA/05960/09 and DN/00350/19 including alterations. Pending, validated 8 July 2026, 44 m away
- [**PA/07592/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07592-23/san-pawl-il-bahar-sanction-variations-in-existing-apartment): To sanction variations in existing apartment, including a retractable awning from approved permit PA5835/07. Granted, validated 14 February 2024, 44 m away
- [**PA/07871/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07871-24/san-pawl-il-bahar-convert-an-approved-duplex-penthouse-pa2856-07-into): To convert an approved duplex penthouse PA2856/07 into a duplex apartment including demolishing of penthouse, internal and external alterations and… Granted, validated 20 November 2024, 4 floors, 50 m away
- [**PA/00763/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00763-22/san-pawl-il-bahar-propose-change-of-use-of-existing-residence): To propose change of use of existing residence to garage including internal and external alterations. Status being checked, 57 m away
- [**PA/03628/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03628-25/san-pawl-il-bahar-sanctioning-of-garage-as-built-due-to): Sanctioning of garage as built due to deviations from PA4142/93. Granted, validated 30 June 2025, 60 m away
- [**PA/02732/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02732-23/san-pawl-il-bahar-demolish-an-existing-structure-including-the-garage): To demolish an existing structure including the garage and to re-construct garage and construction of a shop Class 4B at ground floor with overlying 6… Granted, validated 17 May 2023, 7 floors, 61 m away

## More by Nathaniel Sammut

- [**PA/07090/26** Mosta](https://propertylist.mt/permit/PA-07090-26/mosta-renewal-of-pa5021-18-to-sanction-as): Renewal of PA5021/18 - To sanction as built floor levels. Proposed alterations in the common area and third floor include; roofing over the terrace, a… Pending, 4 floors plus a receded floor
- [**PA/06826/26** Mgarr](https://propertylist.mt/permit/PA-06826-26/mgarr-sanction-construction-of-wall-in-garage-and): To sanction construction of wall in garage and other minor changes. Pending, validated 7 October 2026
- [**PA/06581/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06581-26/san-pawl-il-bahar-changes-to-wc): Proposed changes to wc, parapet wall and facade. Pending, validated 23 September 2026
- [**PA/05245/26** Balzan](https://propertylist.mt/permit/PA-05245-26/balzan-sanction-demolition-of-wall-and-proposed-re-construction): To sanction demolition of wall and proposed re-construction. Pending, validated 29 July 2026
- [**PA/01724/26** Mgarr](https://propertylist.mt/permit/PA-01724-26/mgarr-shifting-of-greenhouse): Shifting of greenhouse, solar panels and reservoir which were approved in PA/1044/24, and proposed construction of a pump room. Granted, validated 18 March 2026
- [**PA/00487/26** Marsaxlokk](https://propertylist.mt/permit/PA-00487-26/marsaxlokk-installation-of-a-concrete-platform-and-construction): Proposed installation of a concrete platform and construction of a lightweight structure for the administration of the hardstanding facilities. Granted, validated 4 February 2026, 1 floor

[All applications by Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)