---
title: "PA/00200/21: sanction addition of garage in the side in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-00200-21/san-pawl-il-bahar-sanction-addition-of-garage-in-the-side
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Status being checked planning application in San Pawl il-Bahar: To sanction addition of garage in the side curtilage to a pre-1968 development Perit…

Planning applications › San Pawl il-Bahar › PA0020021

# PA/00200/21: sanction addition of garage in the side in San Pawl il-Bahar

15, Nevada & Garage No.17, Triq il-Lacci, Qawra, San Pawl il-Bahar

To sanction addition of garage in the side curtilage to a pre-1968 development

- **Status:** Status being checked
- **Location:** 15, Nevada & Garage No.17, Triq il-Lacci, Qawra, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Mr Carmel k/a Charles Armeni
- **Perit:** [Perit Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)
- **Type of works:** Sanctioning

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00200/21)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00200&caseYear=21)

## Planning activity around 15, Nevada & Garage No.17, Triq il-Lacci, Qawra, San Pawl il-Bahar

95 other applications within 300 m: 56 granted, 5 refused, 10 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/04795/25).

On Triq il-Lacci: 2 other applications, 1 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 92% (likely range 62–100%, low reliability, from 31 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07753/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07753-24/san-pawl-il-bahar-minor-internal-and-external-alterations-to-an): Minor internal and external alterations to an existing pre-1967 first floor maisonette. Granted, validated 27 January 2025, 18 m away
- [**PA/07947/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07947-25/san-pawl-il-bahar-internal-alterations-to-approved-rg-01131-20-and-pro): Proposed internal alterations to approved RG/01131/20 and proposed washroom at second floor level. Granted, validated 26 January 2026, 29 m away
- [**PA/03814/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03814-25/san-pawl-il-bahar-demolishing-of-existing-dwelling-and-construction-of): Demolishing of existing dwelling and construction of an apartment block containing a basement level and three habitable levels. Granted, validated 11 June 2025, 3 floors, 43 m away
- [**PA/02741/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02741-26/san-pawl-il-bahar-demolish-existing-dwellings-and-to-excavate-basement): To demolish existing dwellings and to excavate basement floors. To construct garages basement floor levels. To construct a Class 4D restaurant at ground floor… Withdrawn, validated 29 April 2026, 4 floors plus a receded floor, 46 m away
- [**PA/02217/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02217-26/san-pawl-il-bahar-internal-and-external-alterations-to-flat-and): Internal and external alterations to flat and raising of parapett wall for safety purposes. Granted, validated 8 April 2026, 65 m away
- [**PA/06534/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06534-26/san-pawl-il-bahar-sanction-third-floor-apartment-variations-from-pa-00): To sanction third floor apartment variations from PA/00255/00, including variations from the official building alignment. Pending, validated 23 September 2026, 73 m away
- [**PA/06840/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06840-23/san-pawl-il-bahar-minor-amendments-to-layout-and-sanctioning-of): Minor amendments to layout and sanctioning of closing the balcony opening. Granted, validated 15 November 2023, 77 m away
- [**PA/05856/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05856-23/san-pawl-il-bahar-internal-alterations-to-pre-1968-apartment-layout-wi): Internal alterations to pre-1968 apartment layout with variations from the official building alignment, addition of window on façade and replacement of… Granted, validated 12 December 2023, 83 m away
- [**PA/05634/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05634-26/san-pawl-il-bahar-sanctioning-of-two-private-car-garages-as): Sanctioning of two private car garages as built. Pending, 84 m away
- [**PA/05727/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05727-26/san-pawl-il-bahar-sanction-shifting-of-the-front-glazed-aluminum): To sanction shifting of the front glazed aluminum door at receded fifth floor level. Granted, validated 14 September 2026, 94 m away
- [**PA/03460/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03460-22/san-pawl-il-bahar-sanctioning-to-replacement-and-relocation-of-front): Sanctioning to replacement and relocation of front balcony aluminum door over approved plans in PA4168/07. Status being checked, 96 m away
- [**PA/06119/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06119-24/san-pawl-il-bahar-sanction-the-placing-of-outdoor-tables-and): To sanction the placing of outdoor tables and chairs covered with umbrellas and the carrying out of alterations to the design of the enclosed structure and… Granted, validated 18 September 2024, 99 m away
- [**PA/03503/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03503-21/san-pawl-il-bahar-replace-existing-aluminium-railings-with-tempered-gl): To replace existing aluminium railings with tempered glass balustrades at receded fifth floor level Status being checked, 101 m away
- [**PA/00638/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00638-26/san-pawl-il-bahar-minor-internal-alterations-to-residence-to-alter): Minor internal alterations to residence to alter use of rooms in the said residence, change of access to maisonette to new stairs off trejqet il-Kulparra.… Suspended, validated 4 February 2026, 106 m away
- [**PA/01918/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01918-22/san-pawl-il-bahar-install-umbrellas-over-approved-tables-and-chairs): To install umbrellas over approved tables and chairs (DN559/05) and wind breaker around the outdoor catering area. Status being checked, 112 m away

## More by Nathaniel Sammut

- [**PA/07090/26** Mosta](https://propertylist.mt/permit/PA-07090-26/mosta-renewal-of-pa5021-18-to-sanction-as): Renewal of PA5021/18 - To sanction as built floor levels. Proposed alterations in the common area and third floor include; roofing over the terrace, a… Pending, 4 floors plus a receded floor
- [**PA/06826/26** Mgarr](https://propertylist.mt/permit/PA-06826-26/mgarr-sanction-construction-of-wall-in-garage-and): To sanction construction of wall in garage and other minor changes. Pending, validated 7 October 2026
- [**PA/06581/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06581-26/san-pawl-il-bahar-changes-to-wc): Proposed changes to wc, parapet wall and facade. Pending, validated 23 September 2026
- [**PA/05245/26** Balzan](https://propertylist.mt/permit/PA-05245-26/balzan-sanction-demolition-of-wall-and-proposed-re-construction): To sanction demolition of wall and proposed re-construction. Pending, validated 29 July 2026
- [**PA/01724/26** Mgarr](https://propertylist.mt/permit/PA-01724-26/mgarr-shifting-of-greenhouse): Shifting of greenhouse, solar panels and reservoir which were approved in PA/1044/24, and proposed construction of a pump room. Granted, validated 18 March 2026
- [**PA/00487/26** Marsaxlokk](https://propertylist.mt/permit/PA-00487-26/marsaxlokk-installation-of-a-concrete-platform-and-construction): Proposed installation of a concrete platform and construction of a lightweight structure for the administration of the hardstanding facilities. Granted, validated 4 February 2026, 1 floor

[All applications by Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
