PA/00287/20: carry out restoration works on facade including in Paola
42 Cupid, Triq il-Foss, Paola
To carry out restoration works on facade including replacement and apertures and balcony as per approved GS 471/19.
- Status
- Status being checked
- Location
- 42 Cupid, Triq il-Foss, Paola
- Locality
- Paola
- Applicant
- Mr Peter Farrugia
- Perit
- Perit Matthew Bugeja
- Type of works
- Restoration
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 42 Cupid, Triq il-Foss, Paola
217 other applications within 300 m: 142 granted, 6 refused, 25 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/03327/23).
On Triq il-Foss: 22 other applications, 12 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Marvin Ellul, Roderick Camilleri, Maria Schembri Grima, David Paul Grima, Lauran Dimech.
Approval estimate for restoration applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05111/24 Paola: To subdivide maisonette (approved in RG/01148/20) and Class 4B unit (approved in PA/4036/15).
- PA/06798/23 Paola: To sanction apartment at second floor level.
- PA/05622/26 Paola: To change the facade, and internal alterations.
- PA/07478/26 Paola: To affect internal and external alterations to existing townhouse including replacement of roofs, affecting an extension at the rear and opening of walls at…
- PA/06745/23 Paola: Proposed construction of store (ancillary to Class 4A office) at second floor level.
- PA/01050/20 Paola: Renewal of approved PA3904/14. (Proposed change of use to Class 4A (office) & minor internal alterations (no changes to elevation)
- PA/01623/21 Paola: Proposed internal alterations to existing first floor maisonette including the installation of a spiral staircase and the construction of a parapet wall at…
- PA/05731/25 Paola: To sanction changes from 1992 permit (PA3888/92) including internal and external alterations and correction of site.
- PA/00720/22 Paola: Proposed internal and external alterations to existing dwelling including excavation and construction of swimming pool at ground floor level, changes in…
- PA/00576/24 Paola: Internal and external alterations to existing townhouse incl changes to internal layout, addition of lift, back balcony, front balcony balustrade, enlarge…
- PA/04292/26 Paola: Proposed alterations to existing property.
- PA/05605/26 Paola: To sanction existing washroom at roof level as built.
- PA/02762/24 Paola: Replacement of deteriorated parapet wall on facade.
- PA/00877/22 Paola: To sanction minor alteration/extension at ground floor level and proposed extension at first floor level.
- PA/08454/24 Paola: To sanction changes from approved [PA/7830/17], the proposal includes the construction of a canopy on the roof, as well as the installation of timber slats in…
More by Matthew Bugeja
- PA/07173/26 Paola: Proposed minor internal alterations, removal of second floor pigeon loft, construction of second floor washroom, replacement of facade apertures and…
- PA/06991/26 Santa Venera: To demolish existing dwelling and construct ground floor Class 4A office, apartments at first and second floor levels and one duplex apartment at third and…
- PA/06885/26 Birzebbuga: Proposed minor internal alterations to existing townhouse at ground and first floor levels. Proposed extension at first floor level terrace, construction of…
- PA/06782/26 Tarxien: Proposed change of use from private car garage to Class 4B retail outlet. Proposal includes minor internal alterations and shop sign.
- PA/05947/26 Birzebbuga: Proposed demolition of existing garage lightweight roof and façade. Proposed construction of ground floor garage and a first floor duplex maisonette. Works…
- PA/05188/26 Lija: Proposed internal alterations at ground floor level to remove accretions, enlarging internal yards and construction of new stairwell. Proposed construction of…