---
title: "PA/00302/20: changes to PA 7203/17 in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-00302-20/san-pawl-il-bahar-changes-to-pa-7203-17
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Status being checked planning application in San Pawl il-Bahar: Proposed changes to PA 7203/17. Splitting of duplex 1 into: Class 4C snackbar, and…

Planning applications › San Pawl il-Bahar › PA0030220

# PA/00302/20: changes to PA 7203/17 in San Pawl il-Bahar

62, Villa Carina, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar

Proposed changes to PA 7203/17. Splitting of duplex 1 into: Class 4C snackbar, and apartment; splitting of duplex 2 into: 2 separate apartments. Including minor alterations (such as shifting of internal partitions) and installation of signage.

- **Status:** Status being checked
- **Location:** 62, Villa Carina, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Gold Lion Development Company Ltd Attn: Matyas Sziraczki](https://propertylist.mt/applicant/gold-lion-development-company-ltd)
- **Perit:** [MASStudio](https://propertylist.mt/perit/masstudio)
- **Type of works:** Signage
- **Residential units:** 3

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00302/20)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00302&caseYear=20)

## Planning activity around 62, Villa Carina, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar

13 other applications on the same street: 6 granted, 1 refused, 2 pending. 86% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/04969/25).

On Telghet ix-Xemxija: 13 other applications, 6 granted and 1 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: [Karl Ebejer](https://propertylist.mt/perit/karl-ebejer).

Approval estimate for signage applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/04969/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04969-25/san-pawl-il-bahar-demolition-of-existing-pre-1968-dilapidated-resident): Demolition of existing pre-1968 dilapidated residential building; excavation of site down to street level, Construction of six private garages and a studio… Granted, validated 3 September 2025, 3 floors plus a receded floor
- [**PA/04972/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04972-25/san-pawl-il-bahar-sanctioning-of-changes-from-that-approved-in): Sanctioning of changes from that approved in PA2769/21 including variations and extensions to approved Class 3B hotel. Proposed balcony for room 10 at level… Pending, validated 30 July 2025
- [**PA/01858/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01858-24/san-pawl-il-bahar-sanction-apartment-and-washroom): To sanction apartment and washroom, approved by way of PB/1547/69, as built and to propose internal alterations to apartment. Granted, validated 14 May 2024
- [**PA/04697/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04697-23/san-pawl-il-bahar-sanction-variations-at-basement-level-from-approved): To sanction variations at basement level from approved PA7095/18 due to piling works which resulted in the loss of one parking space. Granted, validated 9 August 2023
- [**PA/04318/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04318-23/san-pawl-il-bahar-construction-of-a-block-of-flats-with): Construction of a block of flats with an overlying penthouse floor and underlying basement garages in lieu of block of flats as approved in valid permit… Refused, validated 19 July 2023, 4 floors plus a receded floor
- [**PA/03291/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03291-23/san-pawl-il-bahar-reconstruction-of-a-deteriorated-concrete-deck): Reconstruction of a deteriorated concrete deck. Granted, validated 6 June 2023
- [**PA/02750/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02750-23/san-pawl-il-bahar-change-of-use-from-class-4d-restaurant): Change of use from Class 4D Restaurant to Class 4B Pharmacy and Class 2A Clinic including minor internal alterations and changes to sign on facade. Granted, validated 17 May 2023
- [**PA/00790/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00790-23/san-pawl-il-bahar-sanctioning-of-front-elevation-from-that-approved): Sanctioning of front elevation from that approved in PA06049/20. Granted, validated 23 March 2023
- [**PA/00811/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00811-23/san-pawl-il-bahar-minor-alterations-to-pa11105-17): Minor alterations to PA11105/17, including the removal of basement level, minor external and internal alterations to the apartments and facade. Development to… Pending, validated 22 February 2023
- [**PA/00077/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00077-22/san-pawl-il-bahar-sanction-the-installation-of-1-timber-bar): To sanction the: installation of 1 timber bar; a timber lounge area; an annex to serve as storage and toilets; the opening of door interconnecting restaurant… Status being checked
- [**PA/00456/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00456-22/san-pawl-il-bahar-demolition-of-terraced-house-and-excavation): Demolition of terraced house and excavation. Construction of one basement level including two parking spaces, one Class 4A office at a ground floor, five… Status being checked, 6 floors plus a receded floor
- [**PA/01965/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01965-22/san-pawl-il-bahar-construction-of-twelve-residential-units): Construction of twelve residential units, two penthouse, parking area and domestic store at basement level with a different layout from that approved in… Status being checked
- [**PA/02769/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02769-21/san-pawl-il-bahar-change-of-use-from-class-1): Proposed change of use from Class 1 (dwelling) to Class 3B (hotel), including ancillary facilities and restaurant. Proposed external and internal alterations,… Status being checked

## More by MASStudio

- [**PA/07770/26** Swieqi](https://propertylist.mt/permit/PA-07770-26/swieqi-sanctioning-of-differences-from-approved-pa-02840-92): Sanctioning of differences from approved PA/02840/92, in Garage No 5. Pending
- [**PA/07724/26** Balzan](https://propertylist.mt/permit/PA-07724-26/balzan-change-of-use-of-a-pre-1967-domestic): Change of use of a pre-1967 domestic garage to a studio maisonette. Pending
- [**PA/07658/26** St Julians](https://propertylist.mt/permit/PA-07658-26/st-julians-change-of-use-from-approved-30-rooms): Proposed change of use from approved 30 rooms Class 3A guesthouse (PA/02543/25) to 39 rooms Class 3B 3-star hotel while keeping the same approved volume and… Pending
- [**PA/06521/26** Santa Venera](https://propertylist.mt/permit/PA-06521-26/santa-venera-sanctioning-of-minor-changes-from-approved-pa-07822-06): Sanctioning of minor changes from approved PA/07822/06 of third floor level. And proposed extension of the existing apartment at third-floor level and… Pending, validated 23 September 2026, 4 floors
- [**PA/06435/26** Rabat](https://propertylist.mt/permit/PA-06435-26/rabat-demolition-of-existing-property-and-construction-of): Demolition of existing property and construction of ground floor maisonette, two overlying apartments at first and second floor, and a duplex unit at third… Pending, validated 23 September 2026, 4 floors plus a receded floor
- [**PA/06423/26** Swieqi](https://propertylist.mt/permit/PA-06423-26/swieqi-demolition-of-existing-property-and-reconstruction-of): Proposed demolition of existing property and reconstruction of basement garages and residential units, amalgamated with the adjacent property already covered… Pending, validated 23 September 2026, 4 floors plus a receded floor

[All applications by MASStudio](https://propertylist.mt/perit/masstudio)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
