PA/00343/26: Demolition of existing pre-67 building in San Pawl il-Bahar

HSBC, Triq San Pawl, San Pawl il-Bahar

Demolition of existing pre-67 building (ex HSBC) and proposed construction of 3 star 'La Mer' hotel (Class 3B) consisting of 3 underlying basements, reception lobby and restaurant at ground floor, 75 rooms, service area and ancillary facilities on overlying 8 floors, and pool and pool bar at roof top level.

Status
Suspended (Application processing is currently suspended at the perit's request)
Location
HSBC, Triq San Pawl, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Bradley Vella
Perit
JG Periti
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Commercial)
Height
9 floors
Received
27 October 2025
Validated
28 January 2026
Published
28 January 2026
Comments close
27 February 2026

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 113 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around HSBC, Triq San Pawl, San Pawl il-Bahar

125 other applications within 300 m: 77 granted, 2 refused, 19 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/02674/25).

On Triq San Pawl: 91 other applications, 61 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: Edwin Mintoff, Maria Schembri Grima, JG Periti, Jean Azzopardi, MODEL.

Approval estimate for demolition & new construction applications like this here: about 78% (likely range 48–100%, low reliability, from 20 comparable decisions nearby). It proposes 9 floors; the tallest granted nearby is 7. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by JG Periti

All applications by JG Periti

All planning applications in San Pawl il-Bahar