propertylist

PA/00395/22: Rehabilitation and restoration of Grade 1 Villa in Rabat

Villa Luginsland, 61,63 and 65, Triq Gorg Borg Olivier, Rabat

Rehabilitation and restoration of Grade 1 Villa Luginsland including it’s out buildings and garden. Works to include: restoration of facades, structural strengthening and stitching of localised areas of the property, replacement of dilapidated roofs, restoration/replacement of the timber apertures and metal works, minor internal alterations to Main Villa including: creation of small passenger lift, linking of two rooms at ground floor, creation of w.c. facilities, preparatory work for the services installation. Minor alterations to Blocks A and B, including creation of w.c. facilities, recreation of Loggia, and minor internal structural works (removal of wall). Creation of shallow pool and reinstatement of masonry columns and timber canopy within the garden. Minor alterations to ‘green houses’ including reinstatement of missing metal apertures and new roofs. Structural strengthening of the ridge edge at the edge of the property.

Status
Status being checked
Location
Villa Luginsland, 61,63 and 65, Triq Gorg Borg Olivier, Rabat
Locality
Rabat
Applicant
Luginsland Ltd. Attn: Joanna Popiol
Perit
TBA Periti
Type of works
Restoration

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Villa Luginsland, 61,63 and 65, Triq Gorg Borg Olivier, Rabat

178 other applications within 300 m: 113 granted, 5 refused, 24 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03537/25).

On Triq Gorg Borg Olivier: 21 other applications, 15 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Rita Sant, Roderick Camilleri, Joe Barbara.

Approval estimate for restoration applications like this here: about 95% (likely range 65–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by TBA Periti

All applications by TBA Periti

More from Luginsland Ltd

All planning applications in Rabat