> Granted planning application in Zabbar: Proposed demolition of existing property and construction of ground floor garage, 3 apartments and a penthouse.…

Planning applications › Zabbar › PA0046923

# PA/00469/23: demolition of existing property and construction of in Zabbar

155, Triq Bajada, Zabbar

Proposed demolition of existing property and construction of ground floor garage, 3 apartments and a penthouse.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 155, Triq Bajada, Zabbar
- **Locality:** [Zabbar](https://propertylist.mt/planning-applications/zabbar)
- **Applicant:** [Mr. Carmel Bondin](https://propertylist.mt/applicant/carmel-bondin)
- **Perit:** [Perit Randolph Nicholas Bartoli](https://propertylist.mt/perit/randolph-nicholas-bartoli)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Residential units:** 4
- **Received:** 16 November 2022
- **Validated:** 8 February 2023
- **Published:** 8 February 2023
- **Comments close:** 10 March 2023
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 20 June 2023
- **Permit expires:** 5 July 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00469/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00469&caseYear=23)

## Planning activity around 155, Triq Bajada, Zabbar

136 other applications within 300 m: 90 granted, 1 refused, 15 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02870/24).

On Triq Bajada: 26 other applications, 18 granted and 1 refused; granted buildings are typically 3 floors, the tallest 4. Periti active on this street: [X,Y,Z Architecture & Design](https://propertylist.mt/perit/x-y-z-architecture-and-design), [Ruben Sciortino](https://propertylist.mt/perit/ruben-sciortino), [Stephen Micallef](https://propertylist.mt/perit/stephen-micallef), [Hector Zammit](https://propertylist.mt/perit/hector-zammit).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 16 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03034/25** Zabbar](https://propertylist.mt/permit/PA-03034-25/zabbar-amendments-to-residential-block-as-approved-through): Amendments to residential block as approved through PA/05995/23, to include full demolition of site, reconfiguration of layouts to include a maisonette at… Granted, validated 18 June 2025, 4 floors plus a receded floor, 16 m away
- [**PA/05995/23** Zabbar](https://propertylist.mt/permit/PA-05995-23/zabbar-alterations-within-the-ground-floor-and-first): Alterations within the ground floor and first floor, construction of second, third and recessed floor, converting the existing single residential unit into… Granted, validated 18 October 2023, 4 floors plus a receded floor, 22 m away
- [**PA/07369/26** Zabbar](https://propertylist.mt/permit/PA-07369-26/zabbar-modification-to-pa1896-23): Modification to PA1896/23, elimination of washroom at roof level, and construction of a separate apartment. Pending, validated 21 October 2026, 25 m away
- [**PA/01896/23** Zabbar](https://propertylist.mt/permit/PA-01896-23/zabbar-demolish-existing-dwelling-and-construct-ground-floor): To demolish existing dwelling and construct ground floor garage, two overlying residential units and two washrooms. Granted, validated 5 April 2023, 3 floors, 25 m away
- [**PA/00919/26** Zabbar](https://propertylist.mt/permit/PA-00919-26/zabbar-change-of-use-from-commercial-unit): Proposed change of use from commercial unit (shop) to a two bedroom maisonette, changes to facade and internal alterations including installation of gypsum… Granted, validated 18 February 2026, 1 floor, 45 m away
- [**PA/03279/23** Zabbar](https://propertylist.mt/permit/PA-03279-23/zabbar-internal-and-external-alterations): Internal and external alterations. Proposal includes the addition of a bedroom at the second floor level. Granted, validated 6 June 2023, 47 m away
- [**PA/03149/25** Zabbar](https://propertylist.mt/permit/PA-03149-25/zabbar-internal-alterations-to-first-floor-apartment-previously): Proposed internal alterations to first floor apartment previously approved in PA/09075/17. Granted, validated 9 June 2025, 50 m away
- [**PA/04635/23** Zabbar](https://propertylist.mt/permit/PA-04635-23/zabbar-propose-minor-alterations): To propose minor alterations, including reconfiguration of common area, extension and change of use of level -1 and level 0 to garage; and alteration in room… Granted, validated 2 August 2023, 50 m away
- [**PA/00268/20** Zabbar](https://propertylist.mt/permit/PA-00268-20/zabbar-demolish-existing-washrooms-and-construct-a-two-bedroom): To demolish existing washrooms and construct a two-bedroom apartment at third floor, and a one-bedroom penthouse at fourth floor. Status being checked, 4 floors, 55 m away
- [**PA/00533/22** Zabbar](https://propertylist.mt/permit/PA-00533-22/zabbar-raise-fa-ade-parapet-wall-at-roof-level): To raise façade parapet wall at roof level and internal alterations over PA 7055/17. Status being checked, 55 m away
- [**PA/00935/24** Zabbar](https://propertylist.mt/permit/PA-00935-24/zabbar-structural-alterations-and-extension-to-existing-ground): Structural alterations and extension to existing ground floor maisonette covered by RG/3147/18. Granted, validated 2 May 2024, 68 m away
- [**PA/04157/24** Zabbar](https://propertylist.mt/permit/PA-04157-24/zabbar-construction-of-a-class-4a): Construction of a Class 4A (including selling of related products) at ground floor level, an overlying two bedroom residential unit and installation of an… Pending, validated 3 July 2024, 2 floors, 69 m away
- [**PA/04319/25** Zabbar](https://propertylist.mt/permit/PA-04319-25/zabbar-demolish-existing-dwellings): To demolish existing dwellings, excavate site and construct basement garages and water reservoir, one maisonette and one apartment at ground floor level,… Granted, validated 2 July 2025, 4 floors plus a receded floor, 84 m away
- [**PA/00880/22** Zabbar](https://propertylist.mt/permit/PA-00880-22/zabbar-modifications-to-pa-07783-19-including-extension-to-cellar): Modifications to PA/07783/19 including extension to cellar, reconstruction of deteriorated/collapsed cellar and ground floor ceilings, relocation of stairs,… Status being checked, 84 m away
- [**PA/05589/26** Zabbar](https://propertylist.mt/permit/PA-05589-26/zabbar-alterations-to-an-existing-townhouse): Proposed alterations to an existing townhouse, including the relocation of internal apertures and the formation of new internal openings. Proposed… Pending, validated 19 August 2026, 95 m away

## More by Randolph Nicholas Bartoli

- [**PA/07103/26** Zabbar](https://propertylist.mt/permit/PA-07103-26/zabbar-minor-internal-alterations-to-dwelling-and-replacement): Proposed minor internal alterations to dwelling and replacement of roofs. Pending, validated 14 October 2026
- [**PA/06641/26** Xghajra](https://propertylist.mt/permit/PA-06641-26/xghajra-sanction-garage-as-built-from-pa-06629-05): To sanction garage as built from PA/06629/05. Pending, validated 30 September 2026
- [**PA/06151/26** Zabbar](https://propertylist.mt/permit/PA-06151-26/zabbar-demolition-of-roof-structures): Demolition of roof structures, proposed formation of lift to serve all levels, alterations at first floor level, construction of second/third/roof level to… Pending, validated 9 September 2026, 3 floors
- [**PA/06061/26** Marsaskala](https://propertylist.mt/permit/PA-06061-26/marsaskala-placing-of-pergola-on-front-terrace): Proposed placing of pergola on front terrace. Pending, validated 2 September 2026
- [**PA/05874/26** Zabbar](https://propertylist.mt/permit/PA-05874-26/zabbar-demolish-existing-dwelling-and-excavate-site-to): To demolish existing dwelling and excavate site to lower levels and formation of water cistern. Proposed construction of Class 4B shop at ground floor and… Pending, validated 26 August 2026, 3 floors plus a receded floor
- [**PA/05596/26** Qormi](https://propertylist.mt/permit/PA-05596-26/qormi-changes-to-pa-04791-25-to-re-design-layout-of): Proposed changes to PA/04791/25 to re-design layout of first floor unit and construction of 2 overlying apartments and a receded floor penthouse including… Pending, validated 19 August 2026, 3 floors plus a receded floor

[All applications by Randolph Nicholas Bartoli](https://propertylist.mt/perit/randolph-nicholas-bartoli)

## More from Carmel Bondin

- [**PA/03524/25** Vittoriosa (Birgu)](https://propertylist.mt/permit/PA-03524-25/vittoriosa-birgu-formation-of-door-on-facade-and-installation): Proposed formation of door on facade and installation of metal balcony at first floor level. Granted, validated 4 June 2025
- [**PA/02958/25** Zurrieq](https://propertylist.mt/permit/PA-02958-25/zurrieq-construction-of-a-penthouse-instead-of-three): Proposed construction of a penthouse instead of three washrooms at the fourth floor level as per PA 0083/21. Proposed minor amendments due to change in… Granted, validated 14 May 2025, 5 floors
- [**PA/05646/24** Qala](https://propertylist.mt/permit/PA-05646-24/qala-change-of-use-of-private-car-garage): Proposed change of use of private car garage as approved in PA1389/21 to public service car garage. Granted, validated 11 September 2024
- [**PA/05375/24** Cospicua (Bormla)](https://propertylist.mt/permit/PA-05375-24/cospicua-bormla-change-of-use-from-living-room-to): Proposed change of use from living room to Class 4A office at ground floor level, internal alterations and extension of residence at second and third floor… Granted, validated 28 August 2024, 4 floors
- [**PA/00083/21** Zurrieq](https://propertylist.mt/permit/PA-00083-21/zurrieq-construction-of-four): Proposed construction of four (4) garages and a Class 4B shop at ground floor level, three apartments one overlying the other and three washrooms at roof level. Status being checked, 3 floors

[All planning applications in Zabbar](https://propertylist.mt/planning-applications/zabbar)