> Status being checked planning application in Rabat: Demolition of aluminum structures and existing store, and construction of a new w.c/kitchenette, and…

Planning applications › Rabat › PA0047522

# PA/00475/22: Demolition of aluminum structures and existing store in Rabat

Annex to Santa Katerina Chapel, Triq Santa Katerina, Rabat

Demolition of aluminum structures and existing store, and construction of a new w.c/kitchenette, and paving of open space adjacent to chapel parvis.

- **Status:** Status being checked
- **Location:** Annex to Santa Katerina Chapel, Triq Santa Katerina, Rabat
- **Locality:** [Rabat](https://propertylist.mt/planning-applications/rabat)
- **Applicant:** [Stephen Bonello](https://propertylist.mt/applicant/stephen-bonello)
- **Perit:** [Perit Mario Ellul](https://propertylist.mt/perit/mario-ellul)
- **Type of works:** Demolition & New Construction

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00475/22)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00475&caseYear=22)

## Planning activity around Annex to Santa Katerina Chapel, Triq Santa Katerina, Rabat

102 other applications within 300 m: 65 granted, 2 refused, 12 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/02652/24).

On Triq Santa Katerina: 31 other applications, 16 granted and 2 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: [Roderick Camilleri](https://propertylist.mt/perit/roderick-camilleri), [Ray Demicoli](https://propertylist.mt/perit/ray-demicoli), [Julian Borg](https://propertylist.mt/perit/julian-borg), [Christian Cuschieri](https://propertylist.mt/perit/christian-cuschieri), [Russell Marmara](https://propertylist.mt/perit/russell-marmara).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 18 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/02652/24** Rabat](https://propertylist.mt/permit/PA-02652-24/rabat-internal-alterations-to-dwelling-approved-by-permit): Internal alterations to dwelling approved by permit RG627/16 and construction of two bedrooms at second floor level and a washroom at third floor level.… Granted, validated 3 July 2024, 4 floors, 18 m away
- [**PA/06969/23** Rabat](https://propertylist.mt/permit/PA-06969-23/rabat-internal-alterations-and-extension-at-second-floor): Internal alterations and extension at second floor. Granted, validated 25 January 2024, 21 m away
- [**PA/06634/23** Rabat](https://propertylist.mt/permit/PA-06634-23/rabat-demolish-existing-ground-floor-garage): To demolish existing ground floor garage. Construction of ground floor garage and an overlying maisonette (1 unit). Granted, validated 8 November 2023, 2 floors, 21 m away
- [**PA/05962/24** Rabat](https://propertylist.mt/permit/PA-05962-24/rabat-sanction-ground-and-first-floor-level-as): To sanction ground and first floor level as built. Proposed alterations/extensions at 2nd floor level. Proposed new dwelling at third/receded floor level. Granted, validated 27 November 2024, 3 floors plus a receded floor, 33 m away
- [**PA/05939/24** Rabat](https://propertylist.mt/permit/PA-05939-24/rabat-demolition-of-existing-dwelling): Demolition of existing dwelling, construction of ground floor garage, 3 apartments and receded apartment including pool. Granted, validated 4 September 2024, 4 floors plus a receded floor, 35 m away
- [**PA/04797/20** Rabat](https://propertylist.mt/permit/PA-04797-20/rabat-demolition-of-existing-groundfloor-garage): Demolition of existing groundfloor garage. Alterations to existing basement domestic store. Construction of private car garage, common stair well including… Pending, validated 26 August 2020, 1 floor plus a receded floor, 38 m away
- [**PA/05306/25** Rabat](https://propertylist.mt/permit/PA-05306-25/rabat-demolition-of-existing-townhouse-and-construction-of): Proposed demolition of existing townhouse and construction of ground floor garage, apartments at first, second and third floor level and penthouse at receded… Granted, validated 8 October 2025, 4 floors plus a receded floor, 43 m away
- [**PA/03611/26** Rabat](https://propertylist.mt/permit/PA-03611-26/rabat-demolish-existing-maisonette-and-construct-2-floors): To demolish existing maisonette and construct 2 floors and a receded floor as 1 residential unit, including pool at roof level. Granted, validated 3 August 2026, 3 floors plus a receded floor, 51 m away
- [**PA/02192/25** Rabat](https://propertylist.mt/permit/PA-02192-25/rabat-renewal-of-pa-08564-19-demolition-of-existing): Renewal of PA/08564/19 - Demolition of existing dwelling and construction of ground floor garage, 3 apartments (first, second and third floor) and a receded… Granted, validated 28 April 2025, 4 floors plus a receded floor, 54 m away
- [**PA/02045/23** Rabat](https://propertylist.mt/permit/PA-02045-23/rabat-demolish-existing-dwelling-retaining-facade-and-construct): To demolish existing dwelling retaining facade and construct 1 garage at ground floor level and 4no apartments at first, second, third and receded floor… Granted, validated 12 April 2023, 4 floors plus a receded floor, 54 m away
- [**PA/05728/26** Rabat](https://propertylist.mt/permit/PA-05728-26/rabat-demolition-of-existing-dwelling): Demolition of existing dwelling, construction of ground floor garage, 3 apartments and a receded apartment. Pending, validated 19 August 2026, 2 floors plus a receded floor, 59 m away
- [**PA/01560/26** Rabat](https://propertylist.mt/permit/PA-01560-26/rabat-sanctioning-of-subdivision-of-a-duplex-residential): Sanctioning of subdivision of a duplex residential unit into two separate units, including internal alterations. Granted, validated 17 April 2026, 66 m away
- [**PA/01690/26** Rabat](https://propertylist.mt/permit/PA-01690-26/rabat-remove-one-floor-from-the-approved-permit): Remove one floor from the approved permit PA2831/23, turning the development into one unit, rather than two. Proposed internal alterations. Granted, validated 14 April 2026, 1 floor, 67 m away
- [**PA/06362/25** Rabat](https://propertylist.mt/permit/PA-06362-25/rabat-digital-advertisement-screen-on-elevation): Proposed digital advertisement screen on elevation. Refused, validated 15 October 2025, 67 m away
- [**PA/01203/26** Rabat](https://propertylist.mt/permit/PA-01203-26/rabat-demolish-the-first-floor-maisonette-and-the): To demolish the first floor maisonette and the construction of 3 overlying apartments and 1 receded penthouse. Granted, validated 22 April 2026, 3 floors plus a receded floor, 68 m away

## More by Mario Ellul

- [**PA/05806/24** Birzebbuga](https://propertylist.mt/permit/PA-05806-24/birzebbuga-reconstruction): Reconstruction, extension and improvement of existing concrete footpath along the coast for better access to the rocky coast and to the public pathway around… Granted, validated 4 September 2024
- [**PA/05472/24** Qrendi](https://propertylist.mt/permit/PA-05472-24/qrendi-refurbishment-works-at-the-quay-of-wied): Refurbishment works at the quay of Wied iz-Zurrieq and surrounding areas. Redevelopment of ticket booth for Blue Grotto operators. Construction of public… Granted, validated 9 October 2024
- [**PA/02780/24** Marsaskala](https://propertylist.mt/permit/PA-02780-24/marsaskala-excavation-and-construction-of-a-silt-pit): Excavation and construction of a silt pit for the temporary deposition of liquid silt during the cleaning operations of Zabbar stormwater tunnel. Works entail… Granted, validated 15 May 2024
- [**PA/07297/23** Marsa](https://propertylist.mt/permit/PA-07297-23/marsa-construction-of-an-electricity-substation): Construction of an electricity substation, main electrical switch room and backup generator for the new sports complex Class 3C approved in PA5600/19. Granted, validated 6 December 2023
- [**PA/05662/23** Siggiewi](https://propertylist.mt/permit/PA-05662-23/siggiewi-repair-part-of-the-deteriorated-concrete-wall): To repair part of the deteriorated concrete wall and extend the same wall to provide better shelter to the slipway. Granted, validated 27 September 2023
- [**PA/00779/23** Mellieha](https://propertylist.mt/permit/PA-00779-23/mellieha-demolishing-of-existing-concrete-stairs-and-construction): Demolishing of existing concrete stairs and construction of an access for all ramp to pre-1968 boathouses. Granted, validated 22 February 2023

[All applications by Mario Ellul](https://propertylist.mt/perit/mario-ellul)

## More from Stephen Bonello

- [**PA/06636/26** Santa Venera](https://propertylist.mt/permit/PA-06636-26/santa-venera-sanction-changes-to-the-approved-garage): To sanction changes to the approved garage (PA/6953/06) and the proposed extension of existing storage rooms. Pending, validated 30 September 2026
- [**PA/06497/25** Paola](https://propertylist.mt/permit/PA-06497-25/paola-dismantling-of-existing-deteriorated-steel-canopy-and): Proposed dismantling of existing deteriorated steel canopy and construction of new canopy in same material and structural design. Granted, validated 15 October 2025
- [**PA/03677/24** Paola](https://propertylist.mt/permit/PA-03677-24/paola-proposal-involves-transforming-a-section-of-the): The proposal involves transforming a section of the former Pace Grasso / Schreiber Stadium into a public park, which includes the enhancing and widening of… Withdrawn
- [**PA/05662/23** Siggiewi](https://propertylist.mt/permit/PA-05662-23/siggiewi-repair-part-of-the-deteriorated-concrete-wall): To repair part of the deteriorated concrete wall and extend the same wall to provide better shelter to the slipway. Granted, validated 27 September 2023
- [**PA/05407/23** Sliema](https://propertylist.mt/permit/PA-05407-23/sliema-renewal-of-pa1496-18-renewal-of-pa2459-12): Renewal of PA1496/18: Renewal of PA2459/12 - Proposed regeneration works at Part of Triq ix-Xatt. Proposal to include removal of existing parking landscape… Granted, validated 24 January 2024
- [**PA/01556/23** Rabat](https://propertylist.mt/permit/PA-01556-23/rabat-internal-and-external-changes-in-office-building): Proposed internal and external changes in office building, demolition and reconstruction of garage and security area, addition of rubble wall in certain… Granted, validated 22 March 2023

[All planning applications in Rabat](https://propertylist.mt/planning-applications/rabat)