PA/00541/23: Internal and external alterations in Lija
51, Serendipity, Triq Gannikol Buhagiar, Lija
Internal and external alterations, proposed extension at second floor and stairwell at third floor, pv panels at roof level.
- Status
- Refused (This application has been refused by Planning Board / Commission and a refusal notification has been sent.)
- Location
- 51, Serendipity, Triq Gannikol Buhagiar, Lija
- Locality
- Lija
- Applicant
- Ivan Carl Saliba
- Perit
- Perit Jesmond Mugliett
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Solar
- Received
- 19 December 2022
- Validated
- 26 April 2023
- Published
- 26 April 2023
- Comments close
- 26 May 2023
- Recommendation
- Refuse Permission
- Decision
- Refuse Permission
- Decision date
- 5 March 2024
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 51, Serendipity, Triq Gannikol Buhagiar, Lija
21 other applications within 300 m: 15 granted, 0 refused, 4 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 2 floors (PA/04736/24).
On Triq Gannikol Buhagiar: 2 other applications, 1 granted and 0 refused.
- PA/05337/23 Lija: Proposed internal and external alteration to maisonette from approved RG687/22.
- PA/04622/24 Lija: To sanction internal minor variations in basement garage.
- PA/05738/25 Lija: Sanctioning of maisonette as built from that approved in PA5727/03 including minor changes to layout and installation of chimney flue.
- PA/06235/26 Lija: To propose the installation of a wall-mounted lightweight pergola, together with a lightweight roof structure over a small section at roof level.
- PA/03513/26 Lija: Proposed construction of pump room and sanctioning of landscaping as PA/00336/23.
- PA/00336/23 Lija: Proposed demolition of existing pre-1967 structure and reconstruction of same footprint with underlying basement and underground reservoir. Including…
- PA/07782/26 Lija: Sanctioning of the front garden as built, following the works approved under PA 6295/05
- PA/02730/25 Lija: Proposed excavation and construction of underground agricultural store and reservoir, with overlying store room and pump room. Proposed fixing of gate.
- PA/04736/24 Lija: Proposed extension to existing Class 4B commercial premises, by means of excavation and construction of two levels of basement parking, two levels of Class 4B…
- PA/05426/24 Lija: It is proposed to dismantle the existing wall/gate, construct a new ramp, and develop a public service garage at basement level with overlying ancillary…
- PA/05120/25 Lija: Extension of the existing office space, classified as Class 4A, to provide additional workspace and improve overall functionality.
- PA/06733/24 Lija: To amend approved description to PA/8073/21 to include demolition of facade as per approved plans. To sanction internal alterations at ground floor and…
- PA/04671/25 Lija: To propose internal alterations from approved PA/06733/24 and the extension of the washroom at roof level.
- PA/02490/25 Lija: Change of use from garages and stores approved in PA/8012/20 to Class 5B automotive repair shop.
- PA/05372/26 Lija: To sanction changes from PA/05101/00 and correction of all plans following survey.
More by Jesmond Mugliett
- PA/07409/26 Fgura: Change in layout of toilet and ante room, sanctioning of entrance and proposal for new door.
- PA/06349/26 Tarxien: Sanctioning of garage as built from approved permit PA/2605/12.
- PA/05527/26 Ta' Xbiex: Minor alterations from PA/05902/18 including the addition of a pvc structure at the back of the property.
- PA/05269/26 Qormi: Changes to approved permit PA/01462/23, comprising of, the retention of existing ground floor areas, including adjustments to the courtyard and minor…
- PA/05163/26 Marsaxlokk: Alterations at basement and ground floor from approved PA/07047/24 (including extension at basement level providing access to ground floor and reorganisation…
- PA/05144/26 Msida: Changes to development approved in PA/02059/25 comprising of the following; Addition of buffer zone along third party wall at basement level and one HCB leaf…