PA/00605/20: change of use from garage to Class in Zabbar
No 3, Triq Alessio Erardi, Zabbar
Proposed change of use from garage to Class 4B shop and construction of W.C, fixing of sign, retractable awning, A.C unit and roller shutter in front of shop front.
- Status
- Status being checked
- Location
- No 3, Triq Alessio Erardi, Zabbar
- Locality
- Zabbar
- Applicant
- Mr Gustaf Cauchi
- Perit
- Perit Randolph Nicholas Bartoli
- Type of works
- Change of Use
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around No 3, Triq Alessio Erardi, Zabbar
107 other applications within 300 m: 67 granted, 1 refused, 10 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06890/25).
On Triq Alessio Erardi: 20 other applications, 15 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Randolph Nicholas Bartoli.
Approval estimate for change of use applications like this here: about 90% (likely range 60–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/04437/24 Zabbar: To transform the back side at first floor level into an open plan. Proposal also includes the replacement of the 'balavostri' of the parapet wall at roof…
- PA/01587/26 Zabbar: The excavation of a vacant plot for the construction of 8 basement garages, an underground reservoir, and 15 residential units above, comprising 3 units per…
- PA/01044/22 Zabbar: Proposed change of use from garage and domestic storage to Class 4B shop and commercial storage, formation of w.c. and fixing of sign.
- PA/03014/24 Zabbar: Proposed installation of retractable awning, aluminium panels fencing on both sides of existing masonry wall, slight shifting of sign and changes to front…
- PA/05672/25 Zabbar: To demolish existing building, excavation and construction of reservoir, garages at basement level, maisonette at ground floor level and 4 apartments.
- PA/04627/24 Zabbar: Proposed alterations at ground floor and construction of 3 overlying apartments and 1 penthouse.
- PA/01901/25 Zabbar: To sanction changes from approved PA2403/08 and to carry out with the internal alterations, mainly removal of internal partitions.
- PA/03978/25 Zabbar: To sanction changes from PB2750/85 and Internal and external alterations to existing dwelling and addition of 1 apartment at third floor and 1 apartment at…
- PA/00211/25 Zabbar: To demolish existing roof structure and to propose extension to existing dwelling including construction of first floor and roof level.
- PA/07695/23 Zabbar: To sanction changes from approved permit PB1886/89.
- PA/01850/22 Zabbar: Proposed addition of room at second floor, as extension to residence.
- PA/01777/23 Zabbar: Proposed different layout from that approved in PA/05817/21, mainly the introduction of balcony at second floor level, alterations to common parts and garage…
- PA/06421/25 Zabbar: Change of use from garage to maisonette and to sanction extension of basement garage covered by PA (Permit PABA/4038/86).
- PA/08533/24 Zabbar: To sanction existing first floor level as built from that approved in PA3837/07. To demolish existing approved structures at second floor level and…
- PA/03993/25 Zabbar: To open a door in backyard wall.
More by Randolph Nicholas Bartoli
- PA/07103/26 Zabbar: Proposed minor internal alterations to dwelling and replacement of roofs.
- PA/06641/26 Xghajra: To sanction garage as built from PA/06629/05.
- PA/06151/26 Zabbar: Demolition of roof structures, proposed formation of lift to serve all levels, alterations at first floor level, construction of second/third/roof level to…
- PA/06061/26 Marsaskala: Proposed placing of pergola on front terrace.
- PA/05874/26 Zabbar: To demolish existing dwelling and excavate site to lower levels and formation of water cistern. Proposed construction of Class 4B shop at ground floor and…
- PA/05596/26 Qormi: Proposed changes to PA/04791/25 to re-design layout of first floor unit and construction of 2 overlying apartments and a receded floor penthouse including…