propertylist

PA/00627/22: sanction variations from development permit PA2219/13 consisting in Nadur

Quiant Boutique Hotel, Triq it-Tlettax ta' Dicembru c/w, Pjazza l-Arcipriet Martin Camilleri, Nadur

To sanction variations from development permit PA2219/13 consisting of minor internal alterations to boutique hotel Class 3A, changes to elements in facade and extension at receded floor level.

Status
Status being checked
Location
Quiant Boutique Hotel, Triq it-Tlettax ta' Dicembru c/w, Pjazza l-Arcipriet Martin Camilleri, Nadur
Locality
Nadur
Applicant
Mr Joseph Portelli
Perit
Perit Emanuel Vella
Type of works
Sanctioning

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Quiant Boutique Hotel, Triq it-Tlettax ta' Dicembru c/w, Pjazza l-Arcipriet Martin Camilleri, Nadur

144 other applications within 300 m: 94 granted, 4 refused, 11 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/01836/24).

On Triq it-Tlettax ta' Dicembru: 15 other applications, 8 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Alexander Bigeni, Saviour Micallef, Edward Scerri, X,Y,Z Architecture & Design.

Approval estimate for sanctioning applications like this here: about 92% (likely range 62–100%, low reliability, from 19 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Emanuel Vella

All applications by Emanuel Vella

More from Joseph Portelli

All planning applications in Nadur