---
title: "PA/00673/25: demolish existing commercial building and to construct in Rabat (Gozo) |…"
url: https://propertylist.mt/permit/PA-00673-25/rabat-gozo-demolish-existing-commercial-building-and-to-construct
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Rabat (Gozo): To demolish existing commercial building and to construct an extension to PA1689/24 comprising of 8…

Planning applications › Rabat (Gozo) › PA0067325

# PA/00673/25: demolish existing commercial building and to construct in Rabat (Gozo)

Kappuccini Court, Triq il-Kapuccini, Rabat (Gozo)

To demolish existing commercial building and to construct an extension to PA1689/24 comprising of 8 residential units with underlying Class 4B showroom which is to form an extension to the approved Class 4B use at ground floor. Proposed works include internal and external alterations to PA1689/24 in order to amalgamate the common access areas and parking level. Amendments to the re-alignment of the approved building in PA1689/24 to comply with official alignment. Proposed signage.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Kappuccini Court, Triq il-Kapuccini, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** [Dr Joseph Attard](https://propertylist.mt/applicant/joseph-attard)
- **Perit:** [Perit Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Residential units:** 8
- **Received:** 29 November 2024
- **Validated:** 5 February 2025
- **Published:** 5 February 2025
- **Comments close:** 7 March 2025
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 29 April 2025
- **Permit expires:** 14 May 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00673/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00673&caseYear=25)

## Planning activity around Kappuccini Court, Triq il-Kapuccini, Rabat (Gozo)

196 other applications within 300 m: 125 granted, 4 refused, 26 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/01261/23).

On Triq il-Kapuccini: 26 other applications, 16 granted and 1 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni), [Edward Scerri](https://propertylist.mt/perit/edward-scerri), [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto), [Mario Cordina](https://propertylist.mt/perit/mario-cordina), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 17 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01096/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-01096-24/rabat-gozo-renew-pa-10396-17-to-demolish-existing-offices): To renew PA/10396/17 - To demolish existing offices and to construct parking at basement level, four office levels (Class 4A) and a receded floor level and… Granted, validated 4 April 2024, 4 floors plus a receded floor, 14 m away
- [**PA/00763/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-00763-21/rabat-gozo-change-use-from-shop): To change use from shop (Class 4B) to restaurant (Class 4D) and carry out internal and external alterations and sanctioning of sign and its relocation. Status being checked, 14 m away
- [**PA/02182/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02182-26/rabat-gozo-carry-out-alterations-and-extensions-to-existing): To carry out alterations and extensions to existing offices (Class 4A). Alterations include changes to internal layout. Granted, validated 1 April 2026, 16 m away
- [**PA/00298/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-00298-24/rabat-gozo-sanction-the-relocation-and-changes-to-sign): To sanction the relocation and changes to sign approved in PA763/21. Granted, validated 24 January 2024, 21 m away
- [**PA/02757/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-02757-25/rabat-gozo-change-of-use-from-class-4a-office): Change of use from Class 4A office to confectionery Class 4B; proposed sign, sanctioning of facade materials & variations from the official building alignments. Granted, validated 30 April 2025, 27 m away
- [**PA/01432/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-01432-23/rabat-gozo-change-of-use-from-class-9-gaming): Change of use from Class 9 gaming shop approved in PA0516/11 to Class 4A office and change of sign from that approved in same permit. Granted, validated 15 March 2023, 27 m away
- [**PA/06332/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06332-24/rabat-gozo-change-in-use-of-part-of-the): To change in use of part of the existing showroom into a public service garage including minor alterations and variations from building alignment in line with… Granted, validated 25 September 2024, 36 m away
- [**PA/03697/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-03697-24/rabat-gozo-sanction-change-of-use-from-boutique-to): To sanction change of use from boutique to Class 4B use - butcher and to sanction alterations to facade. Granted, validated 26 June 2024, 37 m away
- [**PA/04285/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04285-23/rabat-gozo-minor-internal-alterations): Proposed minor internal alterations, extension at ground and first floor levels, addition of washroom at roof level and change of color of existing apertures. Granted, validated 4 October 2023, 44 m away
- [**PA/06514/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06514-25/rabat-gozo-internal-and-external-alterations-to-pre-68-building): Proposed internal and external alterations to pre-68 building, that includes subdivision of existing property into two residential units. Pending, validated 15 October 2025, 48 m away
- [**PA/02897/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02897-22/rabat-gozo-change-use-from-class-4a-to-class): To change use from Class 4A to Class 4D, to effect internal and external alterations and to replace the existing retractable awning & shop sign Status being checked, 50 m away
- [**PA/01049/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-01049-20/rabat-gozo-internal-additions-and-alterations-to-class-4a): Internal additions and alterations to Class 4A office. Status being checked, 50 m away
- [**PA/06559/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06559-24/rabat-gozo-remove-existing-sign): To remove existing sign. Proposal includes changes to facade and sign. Granted, validated 25 September 2024, 51 m away
- [**PA/05927/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05927-24/rabat-gozo-changes-to-pa-03088-19-by-changing-layouts-and): Proposed changes to PA/03088/19 by changing layouts and number of units. Proposed 2 garages and 1 Class 4A office at semi-basement, 14 apartments and washroom… Granted, validated 4 September 2024, 56 m away
- [**PA/03012/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03012-23/rabat-gozo-renew-pa4415-18-internal-alterations-to-existing): To renew PA4415/18 - Internal alterations to existing dwelling, including removal of existing stairs, formation of stairs in front room, repair of facade… Granted, validated 26 June 2023, 59 m away

## More by Annamaria Attard Montalto

- [**PA/07535/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07535-26/rabat-gozo-propose-minimal-internal-layout-changes-at-all): To propose minimal internal layout changes at all levels, with the provision of a bathroom at a mezzanine level and to amend facade design incorporating two… Pending, validated 28 October 2026
- [**PA/07453/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07453-26/rabat-gozo-renewal-of-permission-pa4674-15-to-amend-and): Renewal of permission PA4674/15: To amend and renew permit PA2609/10, amendments consist of minor internal changes, proposed sign and change in design of… Pending
- [**PA/07279/26** Gharb](https://propertylist.mt/permit/PA-07279-26/gharb-dismantle-and-reinstate-structurally-unsafe-roof-using): To dismantle and reinstate structurally unsafe roof using same materials and to raise same roof by 80cm. Pending, validated 21 October 2026
- [**PA/06984/26** Munxar](https://propertylist.mt/permit/PA-06984-26/munxar-sanction-alterations-from-pa5310-03-and-propose-change): To sanction alterations from PA5310/03 and propose change of use from garage to 1 bed apartment. Pending, validated 14 October 2026
- [**PA/06825/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06825-26/zebbug-gozo-carry-out-additions-to-an-existing-apartment): To carry out additions to an existing apartment. Pending, validated 14 October 2026
- [**PA/06306/26** Gharb](https://propertylist.mt/permit/PA-06306-26/gharb-sanction-room-at-ground-floor-level): To sanction room at ground floor level, to refurbish and restore an existing dis-used cattle farm, retaining the original architectural features. Proposal… Pending, validated 16 September 2026, 2 floors plus a receded floor

[All applications by Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto)

## More from Joseph Attard

- [**PA/07327/26** Qala](https://propertylist.mt/permit/PA-07327-26/qala-renewal-to-pa07347-17-alterations-and-additions-to): Renewal to PA07347/17: Alterations and additions to existing house consisting in removal of wall separating the two ground floor rooms; addition of living… Pending, validated 21 October 2026, 2 floors
- [**PA/06920/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06920-26/zebbug-gozo-excavate-and-to-construct-a-sheep-farm): To excavate and to construct a sheep farm, a water reservoir, cesspits and a settling tank. To also plant trees and reconstruct rubble wall. Pending, validated 14 October 2026, 1 floor
- [**PA/06200/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06200-26/san-pawl-il-bahar-sanctioning-of-communal-area-as-built-over): Sanctioning of communal area as built over PA/05192/02. Pending
- [**PA/06126/26** Qormi](https://propertylist.mt/permit/PA-06126-26/qormi-construction-of-a-class-6a-storage-and): Construction of a Class 6A storage and Class 5A light industry. Pending, validated 9 September 2026
- [**PA/05654/26** Qala](https://propertylist.mt/permit/PA-05654-26/qala-sanction-internal-alterations-and-alterations-to-facade): To sanction internal alterations and alterations to facade from previously approved in PA1245/22 and to sanction construction of washroom. Proposed alteration… Pending, validated 19 August 2026
- [**PA/03520/26** Marsaskala](https://propertylist.mt/permit/PA-03520-26/marsaskala-alterations-to-existing-farmhouse): Proposed alterations to existing farmhouse. It is proposed that the existing structure is to be renovated and used as a residence. The proposal also includes… Suspended, validated 3 June 2026

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
