propertylist

PA/00682/21: demolish existing stair hood at third floor in St Julians

148, Triq il-Kbira, San Giljan

To demolish existing stair hood at third floor level and construct 2 apartments at third and fourth floor levels plus overlying duplex apartment at fifth floor and setback level, including the installation of lift.

Status
Status being checked
Location
148, Triq il-Kbira, San Giljan
Locality
St Julians
Applicant
Diamond Holdings Ltd. Attn: Mr Darren Cauchi
Perit
Perit Alistair Avallone
Type of works
Demolition & New Construction (Residential)
Height
5 floors plus a receded floor
Residential units
3

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 148, Triq il-Kbira, San Giljan

35 other applications on the same street: 15 granted, 3 refused, 3 pending. 83% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/02105/24).

On Triq il-Kbira: 35 other applications, 15 granted and 3 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: Ruben Sciortino, Simon Bonnici Mallia, Elena Borg Costanzi, Christopher Tabone.

Approval estimate for demolition & new construction applications like this here: about 89% (likely range 59–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Alistair Avallone

All applications by Alistair Avallone

More from Diamond Holdings Ltd

All planning applications in St Julians