PA/00684/22: construct agricultural store and rainwater reservoir in Ghajnsielem
Raba fil-Kuntrada ta', Taht Il-Belt, Ghajnsielem
To construct agricultural store and rainwater reservoir.
- Status
- Status being checked
- Location
- Raba fil-Kuntrada ta', Taht Il-Belt, Ghajnsielem
- Locality
- Ghajnsielem
- Applicant
- Mr Teddy Rapa
- Perit
- Perit Cornelia Tabone
- Type of works
- Agricultural
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Raba fil-Kuntrada ta', Taht Il-Belt, Ghajnsielem
No other applications recorded nearby yet.
Approval estimate for agricultural applications like this here: about 87% (likely range 57–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by Cornelia Tabone
- PA/01178/25 Ghajnsielem: To construct pump room ancillary to rainwater shaft (spiera).
- PA/01156/25 Nadur: To renew permit PA06806/19: "To demolish existing dwelling, to construct garages below street level with overlying residence and Class 4A office, and to…
- PA/00553/25 Rabat (Gozo): To renew permit PA/06011/19: Alterations to existing dwelling, extension to first floor as well as construction of second and third floor; To change use of…
- PA/00333/25 Zebbug (Gozo): To renew permit PA/04631/19 - To construct lift shaft and motor room.
- PA/00331/25 Gharb: Biex jiggedded il permess: PA/00902/17:"Biex jiggedded il-permess bin-numru PA/1750/12 (Biex tinbena dar residenzjali)."
- PA/06937/24 Qala: To construct parapet wall at roof level.
All applications by Cornelia Tabone
More from Teddy Rapa
- PA/02655/26 Rabat (Gozo): Proposed flat at receded floor level, changes to elements in facade and sanctioning of minor variations to floor levels and proposed changes to ironmongery…
- PA/03629/25 Rabat (Gozo): To extend flat at third floor level to full floor by the carrying out of internal alterations and changes to facade.
- PA/05157/24 Nadur: To sanction garage as built and to shift garage wall outwards onto alignment and to lower garage floor level by removing of infill material and minor rock…