PA/00695/26: demolish existing washrooms at third floor and in Marsaskala
26, Ruzetta Flats, Triq Thomas Ashby, Marsascala
To demolish existing washrooms at third floor and to construct additional floors at third floor and receded fourth floor only.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 26, Ruzetta Flats, Triq Thomas Ashby, Marsascala
- Locality
- Marsaskala
- Applicant
- Eleonora Cutajar
- Perit
- Perit Adrian Mifsud
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Demolition & New Construction
- Height
- 4 floors plus a receded floor
- Received
- 22 December 2025
- Validated
- 4 February 2026
- Published
- 4 February 2026
- Comments close
- 6 March 2026
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 23 June 2026
- Permit expires
- 8 July 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 26, Ruzetta Flats, Triq Thomas Ashby, Marsascala
44 other applications within 300 m: 29 granted, 0 refused, 4 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/01774/26).
On Triq Thomas Ashby: 10 other applications, 9 granted and 0 refused; granted buildings are typically 5 floors, the tallest 5.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00389/23 Marsaskala: Sanctioning of basement -2 and proposed demolition of 4th bedroom at ground floor level, and to interconnect ground floor level and basement level -1.…
- PA/02341/21 Marsaskala: Proposed pv panels at roof level
- PA/05615/26 Marsaskala: To sanction as built existing private car garage and proposed change of use of part of the garage to Class 4B Tattoo Shop. Proposal includes signage.
- PA/06598/25 Marsaskala: To sanction changes from the approved permit PA00465/13.
- PA/02957/25 Marsaskala: To demolish existing common parts as built. To demolish existing washroom at third floor. To construct additional floors, extending from the third floor to…
- PA/06351/23 Marsaskala: Proposed change of use from store to a garage for parking of private vehicles.
- PA/04686/24 Marsaskala: Sanctioning of internal alterations, and variations to the approved building configuration.
- PA/02225/26 Marsaskala: Proposed alterations to approved PA/01975/15 that was not utilized.
- PA/06712/24 Marsaskala: To sanction modifications to existing internal walls, internal apertures, internal heights and to sanction external modifications to approved ground floor…
- PA/03121/23 Marsaskala: Renewal of PA5201/18 (Construction of 4 semi-detached villas and swimming pool as approved by outline permit PA5494/17).
- PA/03418/26 Marsaskala: To sanction existing private garage over PA/3860/92, to correct the existing variation from the official building alignment and to alter the width of the…
- PA/04423/26 Marsaskala: Minor internal modifications, sanctioning minor changes from PA/910/11 and PA/05533/20, and the creation of a one bedroom unit at Receded Floor Level.
- PA/06224/23 Marsaskala: Renewal of PA2658/15: Renewal of PA591/08 for the construction of twenty two apartments, four penthouses and twenty garages.
- PA/02994/25 Marsaskala: Excavation of site and construction of fully detached bungalow including pool.
- PA/03521/24 Marsaskala: To sanction alterations from approved PA/00577/09 which includes displacement of internal partitioning, façade and sign alterations and materials.
More by Adrian Mifsud
- PA/03589/26 Marsaskala: Sanctioning of semi-basement garage, as built from previously approved permit PA/511/97 and construction of front garden wall.
- PA/01257/21 Zabbar: Sanctioning of minor changes to PA 4790/98, extension at roof level and installation of p.v panels at roof level