> Granted planning application in Zebbug: Variations from the official building alignment for the existing footprint, and sanctioning of existing ground floor…

Planning applications › Zebbug › PA0071425

# PA/00714/25: Variations from the official building alignment for in Zebbug

26, Triq il-Princep Baziliku, Zebbug

Variations from the official building alignment for the existing footprint, and sanctioning of existing ground floor garage which was approved as maisonette in PB/5153/79 (i.e., sanctioning also of the change of use of same). Proposed excavation (mainly removal of fill) to form basement domestic store, and reconstruction of garage floor at higher level, including other minor changes.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 26, Triq il-Princep Baziliku, Zebbug
- **Locality:** [Zebbug](https://propertylist.mt/planning-applications/zebbug)
- **Applicant:** Doreen Didi Saliba
- **Perit:** [MASStudio](https://propertylist.mt/perit/masstudio)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 30 October 2024
- **Validated:** 5 February 2025
- **Published:** 16 April 2025
- **Comments close:** 19 May 2025
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 8 October 2025
- **Permit expires:** 29 October 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00714/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00714&caseYear=25)

## Planning activity around 26, Triq il-Princep Baziliku, Zebbug

123 other applications within 300 m: 67 granted, 1 refused, 12 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00404/26).

On Triq il-Princep Baziliku: 1 other application, 1 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 24 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/05200/25** Zebbug](https://propertylist.mt/permit/PA-05200-25/zebbug-erect-extension-of-lift-shaft-at-roof): To erect extension of lift shaft at roof level alongside stairwell. Granted, validated 15 September 2025, 21 m away
- [**PA/04365/24** Zebbug](https://propertylist.mt/permit/PA-04365-24/zebbug-installation-of-lift-from-ground-floor-to): Proposed installation of lift from ground floor to first floor; and other minor alterations. Granted, validated 28 August 2024, 60 m away
- [**PA/05105/24** Zebbug](https://propertylist.mt/permit/PA-05105-24/zebbug-demolition-of-existing-dwelling-and-construction-of): Demolition of existing dwelling and construction of a three floor residential block including a garage and a Class 4B shop at ground floor. Granted, validated 31 July 2024, 3 floors, 75 m away
- [**PA/03568/21** Zebbug](https://propertylist.mt/permit/PA-03568-21/zebbug-sanction-the-construction-of-a-garage-for): To sanction the construction of a garage for private cars Status being checked, 85 m away
- [**PA/03203/21** Zebbug](https://propertylist.mt/permit/PA-03203-21/zebbug-construction-of-conservatory-at-roof-level): Construction of conservatory at roof level, and changes to facade, including sanctioning of basement as built Status being checked, 93 m away
- [**PA/05386/24** Zebbug](https://propertylist.mt/permit/PA-05386-24/zebbug-sanction-facade-as-built): To sanction facade as built, and propose the conversion of existing Class 2C and Class 4B facilities into a Class 4A dentistry. Proposal includes minor… Granted, validated 28 August 2024, 102 m away
- [**PA/02906/26** Zebbug](https://propertylist.mt/permit/PA-02906-26/zebbug-demolition-of-exiting-terraced-housed): Demolition of exiting terraced housed, excavation for the formation of basement and reservoir, construction of basement garage, ground floor maisonette, two… Pending, validated 3 June 2026, 4 floors plus a receded floor, 104 m away
- [**PA/06990/26** Zebbug](https://propertylist.mt/permit/PA-06990-26/zebbug-internal-alterations-at-first-floor): Internal alterations at first floor. To demolish the existing washroom at second floor and to propose two apartments at second and third floors and a… Pending, validated 14 October 2026, 3 floors plus a receded floor, 106 m away
- [**PA/02888/23** Zebbug](https://propertylist.mt/permit/PA-02888-23/zebbug-sanction-differences-from-pa2859-20): To sanction differences from PA2859/20 (1. differences at washroom level and roof level 2. front elevation parapet wall.) Granted, validated 24 May 2023, 114 m away
- [**PA/04448/26** Zebbug](https://propertylist.mt/permit/PA-04448-26/zebbug-excavation-of-site-and-construction-of-1): Proposed excavation of site and construction of 1 basement domestic store, 2 ground floor garages, 2 overlying apartments and 1 duplex apartment. Pending, validated 1 July 2026, 2 floors, 115 m away
- [**PA/00742/21** Zebbug](https://propertylist.mt/permit/PA-00742-21/zebbug-sanction-property-as-built): To sanction property as built. Variations from approved permit PB3490/87 include configuration of backyard and facade, extension at first floor level rear… Status being checked, 117 m away
- [**PA/02723/26** Zebbug](https://propertylist.mt/permit/PA-02723-26/zebbug-demolition): Demolition, alterations and extensions to ground, 1st, 2nd and 3rd floor levels of existing terraced house and garage, and construction of receded floor… Pending, validated 5 August 2026, 4 floors plus a receded floor, 120 m away
- [**PA/02957/21** Zebbug](https://propertylist.mt/permit/PA-02957-21/zebbug-change-of-use-from-class-4b-to): Change of use from Class 4B to Class 1 dwelling including minor internal and external alterations Status being checked, 120 m away
- [**PA/04043/23** Zebbug](https://propertylist.mt/permit/PA-04043-23/zebbug-sanction-garage-as-built-due-to-change): To sanction garage as built due to change in site configuration from that approved in PB103/72. Granted, validated 27 September 2023, 123 m away
- [**PA/00362/20** Zebbug](https://propertylist.mt/permit/PA-00362-20/zebbug-alterations-to-existing-first-and-second-floor): Alterations to existing first and second floor, extensions to second floor and construction of third and receded floor. Status being checked, 4 floors plus a receded floor, 123 m away

## More by MASStudio

- [**PA/07770/26** Swieqi](https://propertylist.mt/permit/PA-07770-26/swieqi-sanctioning-of-differences-from-approved-pa-02840-92): Sanctioning of differences from approved PA/02840/92, in Garage No 5. Pending
- [**PA/07724/26** Balzan](https://propertylist.mt/permit/PA-07724-26/balzan-change-of-use-of-a-pre-1967-domestic): Change of use of a pre-1967 domestic garage to a studio maisonette. Pending
- [**PA/07658/26** St Julians](https://propertylist.mt/permit/PA-07658-26/st-julians-change-of-use-from-approved-30-rooms): Proposed change of use from approved 30 rooms Class 3A guesthouse (PA/02543/25) to 39 rooms Class 3B 3-star hotel while keeping the same approved volume and… Pending
- [**PA/06521/26** Santa Venera](https://propertylist.mt/permit/PA-06521-26/santa-venera-sanctioning-of-minor-changes-from-approved-pa-07822-06): Sanctioning of minor changes from approved PA/07822/06 of third floor level. And proposed extension of the existing apartment at third-floor level and… Pending, validated 23 September 2026, 4 floors
- [**PA/06435/26** Rabat](https://propertylist.mt/permit/PA-06435-26/rabat-demolition-of-existing-property-and-construction-of): Demolition of existing property and construction of ground floor maisonette, two overlying apartments at first and second floor, and a duplex unit at third… Pending, validated 23 September 2026, 4 floors plus a receded floor
- [**PA/06423/26** Swieqi](https://propertylist.mt/permit/PA-06423-26/swieqi-demolition-of-existing-property-and-reconstruction-of): Proposed demolition of existing property and reconstruction of basement garages and residential units, amalgamated with the adjacent property already covered… Pending, validated 23 September 2026, 4 floors plus a receded floor

[All applications by MASStudio](https://propertylist.mt/perit/masstudio)

[All planning applications in Zebbug](https://propertylist.mt/planning-applications/zebbug)