---
title: "PA/00733/23: construction of apartment on second floor and in Rabat (Gozo) | PropertyList"
url: https://propertylist.mt/permit/PA-00733-23/rabat-gozo-construction-of-apartment-on-second-floor-and
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Rabat (Gozo): Proposed construction of apartment on second floor and sanctioning of changes from approved permit PB 543/89.…

Planning applications › Rabat (Gozo) › PA0073323

# PA/00733/23: construction of apartment on second floor and in Rabat (Gozo)

56, Triq il-Karmnu c/w, Triq Santa Marija, Rabat (Gozo)

Proposed construction of apartment on second floor and sanctioning of changes from approved permit PB 543/89.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 56, Triq il-Karmnu c/w, Triq Santa Marija, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** Julian Zammit
- **Perit:** [Perit Mario Cordina](https://propertylist.mt/perit/mario-cordina)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Height:** 3 floors
- **Residential units:** 1
- **Received:** 19 January 2023
- **Validated:** 22 February 2023
- **Published:** 22 February 2023
- **Comments close:** 24 March 2023
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 9 April 2024
- **Permit expires:** 24 April 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00733/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00733&caseYear=23)

## Planning activity around 56, Triq il-Karmnu c/w, Triq Santa Marija, Rabat (Gozo)

221 other applications within 300 m: 137 granted, 3 refused, 29 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03387/25).

On Triq il-Karmnu: 1 other application, 0 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 30 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/08005/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-08005-25/rabat-gozo-internal-alterations-and-additions-to-existing-pre-1967): Internal alterations and additions to existing pre-1967 dwelling. To link property to adjacent dwelling approved in PA/01383/22. Granted, validated 10 December 2025, 12 m away
- [**PA/01929/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-01929-25/rabat-gozo-reconstruct-roof-of-a-pre-1967-mill-room): To reconstruct roof of a pre-1967 mill room. Pending, validated 26 March 2025, 21 m away
- [**PA/07322/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07322-26/rabat-gozo-replace-front-timber-door-and-restore-facade): To replace front timber door and restore facade wall. Pending, validated 21 October 2026, 24 m away
- [**PA/04454/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04454-24/rabat-gozo-restore-niche): To restore niche. Granted, validated 10 July 2024, 24 m away
- [**PA/02814/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02814-22/rabat-gozo-additions-and-alterations-to-existing-house): Additions and alterations to existing house. Mainly an additional floor level, more bedrooms and bathrooms. Status being checked, 32 m away
- [**PA/00717/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00717-20/rabat-gozo-sanction-differences-from-pa-2577-02-and-to): To sanction differences from PA 2577/02 and to construct additional rooms at roof level Status being checked, 36 m away
- [**PA/00322/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00322-20/rabat-gozo-extend-the-first-floor-and-carry-out): To extend the first floor and carry out minor internal alterations which consist of demolishing and construction of walls. Proposal includes the cleaning and… Status being checked, 39 m away
- [**PA/03371/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-03371-21/rabat-gozo-carry-out-internal-and-external-alterations-from): To carry out internal and external alterations from that approved in PA/00322/20 and to construct an additional floor on top. To change also the use from a… Status being checked, 39 m away
- [**PA/02665/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-02665-24/rabat-gozo-carry-out-alterations-to-terraced-house-and): To carry out alterations to terraced house and to change use to a guesthouse (Class 3A). Alterations include changes to internal layout. To also carry out… Granted, validated 8 May 2024, 41 m away
- [**PA/01383/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01383-22/rabat-gozo-sanction-variations-from-approved-drawings-in-pa-04318-10): To sanction variations from approved drawings in PA/04318/10, mostly consisting of correction of survey drawings. Proposed minor alterations. Slight increase… Status being checked, 42 m away
- [**PA/01725/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-01725-24/rabat-gozo-construct-washrooms-on-existing-airspace): To construct washrooms on existing airspace. Granted, validated 3 April 2024, 43 m away
- [**PA/01980/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-01980-24/rabat-gozo-internal-alterations): Internal alterations, additions to existing dwelling at receded floor level and replacement of dangerous balcony. Proposal includes the restoration of the… Granted, validated 3 April 2024, 45 m away
- [**PA/03343/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-03343-21/rabat-gozo-sanction-variations-from-pa-07451-19-at-receded-level): To sanction variations from PA/07451/19 at receded level only Status being checked, 45 m away
- [**PA/03318/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-03318-25/rabat-gozo-wrought-iron-railing-infront-of-windows): Proposed wrought iron railing infront of windows; proposed wrought iron gate and proposed painting of facade at ground floor level. Granted, validated 9 September 2025, 49 m away
- [**PA/00219/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00219-25/rabat-gozo-additions-and-alterations-to-existing-residential-dwelling): Additions and alterations to existing residential dwelling to upgrade it to modern standards, including provision of bathrooms, installation of lift and… Granted, validated 22 January 2025, 54 m away

## More by Mario Cordina

- [**PA/06404/26** Birkirkara](https://propertylist.mt/permit/PA-06404-26/birkirkara-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of underground reservoir. Proposed construction of 4 Class 4D shops with signage… Pending, validated 16 September 2026
- [**PA/06289/26** Birkirkara](https://propertylist.mt/permit/PA-06289-26/birkirkara-sanction-changes-from-approved-pa3588-19-consisting-of): To sanction changes from approved PA3588/19 consisting of stairwell at roof level and internal layout changes. Pending, validated 16 September 2026
- [**PA/06015/26** Munxar](https://propertylist.mt/permit/PA-06015-26/munxar-private-swimming-pool-on-roof-and-private): Proposed private swimming pool on roof and private open stairwell to roof. Proposed change from washroom/pantry to bathroom in recessed floor unit. Granted, validated 15 October 2026
- [**PA/05496/26** Qormi](https://propertylist.mt/permit/PA-05496-26/qormi-demolish-existing-dilapidated-factory): To demolish existing dilapidated factory. Proposed excavation and construction of underground reservoir, 9 basement garages and 14 residential units. Pending, validated 19 August 2026, 1 floor
- [**PA/05450/26** Xewkija](https://propertylist.mt/permit/PA-05450-26/xewkija-demolition-of-existing-ruins): Proposed demolition of existing ruins. Proposed excavation and construction of reservoir, ground floor garage and 5 residential units. Pending, validated 5 August 2026, 1 floor
- [**PA/05444/26** Santa Venera](https://propertylist.mt/permit/PA-05444-26/santa-venera-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of reservoir, 2 garages and 8 residential units. Pending, validated 5 August 2026, 1 floor

[All applications by Mario Cordina](https://propertylist.mt/perit/mario-cordina)

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
