PA/00757/22: Restoration and continuous maintenance of the facades in Rabat (Gozo)
St Johns Cavallier & Cittadella Cultural Centre, Triq il-Fosos &, Triq Bieb l-Imdina, Cittadella, Rabat (Gozo)
Restoration and continuous maintenance of the facades of St Johns Cavalier and Cittadella Cultural Centre, within the walls of the Cittadella, Rabat, Gozo.
- Status
- Status being checked
- Location
- St Johns Cavallier & Cittadella Cultural Centre, Triq il-Fosos &, Triq Bieb l-Imdina, Cittadella, Rabat (Gozo)
- Locality
- Rabat (Gozo)
- Applicant
- Mr Stephen Cini
- Perit
- Perit Matthew Casha
- Type of works
- Restoration
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around St Johns Cavallier & Cittadella Cultural Centre, Triq il-Fosos &, Triq Bieb l-Imdina, Cittadella, Rabat (Gozo)
172 other applications within 300 m: 104 granted, 1 refused, 23 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03387/25).
Approval estimate for restoration applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/06381/23 Rabat (Gozo): Renewal of PA3449/18 - Restoration of internal boundary walls and restoration of wall bordering street; to sanction installation of gate.
- PA/07104/23 Rabat (Gozo): To restore facade to dwelling. The works will consist in the cleaning of the facade, repointing, plastic repair and other works necessary to solidify the…
- PA/02622/21 Rabat (Gozo): Reopening of original doorway giving access to museum from Triq Zenqa
- PA/02649/24 Rabat (Gozo): To sanction the additional use of Class 4B and replacement of retractable canopy.
- PA/03867/24 Rabat (Gozo): Proposed restoration of the back wall of the Gozo Law Courts, facing Triq iz-Zenqa, Cittadella, Gozo.
- PA/00834/24 Rabat (Gozo): Proposed reconstruction of bastion wall and consolidation; reinstatement of gate, bridge, and railing; and construction of rubble wall and landscaping. Works…
- PA/07097/26 Rabat (Gozo): To construct a pump room and underground water reservoir.
- PA/03402/22 Rabat (Gozo): Proposed restoration and conservation of external facades of Cultural Heritage Directorate offices.
- PA/01863/26 Rabat (Gozo): Proposed landscaping consisting of planting of trees; passage ways; water fountain and fixing of gate and the proposed changes to existing building approved…
- PA/01830/26 Rabat (Gozo): To construct Class 4A offices above existing shopping arcade.
- PA/04669/24 Rabat (Gozo): Proposed excavation and construction of reservoir, ground floor garage and 3 overlying apartments.
- PA/05140/24 Rabat (Gozo): Change of use from ATM to take-away and fixing of sign.
- PA/00693/20 Rabat (Gozo): Restoration of existing facade including raking of joints, re-pointing of joints in lime-based plaster, maintenance and refurbishing of existing timber…
- PA/00360/23 Rabat (Gozo): To construct an underground reservoir. Site is covered by PA2095/21.
- PA/03225/23 Rabat (Gozo): To demolish an existing dwelling house and construct a basement garage, an apartment at ground floor level and a duplex apartment at first and roof level.
More by Matthew Casha
- PA/04187/26 Mellieha: Proposed construction of an underground water reservoir as approved in DN/01356/21, as well as proposed regeneration and upgrade of garden and facilities,…
- PA/02991/26 Birkirkara: Proposed restoration and conservation works to facade, including changes to the colour of the apertures.
- PA/02929/26 Qormi: Proposed restoration and conservation works to facade.
- PA/02882/26 Sliema: Proposed extension of a hall at the back of the property.
- PA/06966/25 Msida: Proposed construction of natural stone parapet wall at roof level and a spiral staircase as access to the roof level.
- PA/06260/25 Senglea (Isla): Internal alterations and construction of rooms at the existing roof level.