propertylist

PA/00810/20: construction of tool room in San Pawl il-Bahar

Field at Ta' Qarbuni, country lane off, Triq Burmarrad, Burmarrad, San Pawl il-Bahar

Proposed construction of tool room, excavation for and construction of water reservoir with a different layout from that approved in permission PA4209/19, fixing of timber gate formation of ramp with beaten earth and construction/reinstating of rubble wall.

Status
Status being checked
Location
Field at Ta' Qarbuni, country lane off, Triq Burmarrad, Burmarrad, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Mr Robert Grech
Perit
Perit Manuel Darmanin
Type of works
New Construction

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Field at Ta' Qarbuni, country lane off, Triq Burmarrad, Burmarrad, San Pawl il-Bahar

46 other applications within 300 m: 23 granted, 2 refused, 5 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00219/26).

On Triq Burmarrad: 44 other applications, 22 granted and 2 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: Charles Buhagiar, JG Periti, George Farrugia, Gilbert Bartolo, Robert Grech.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Manuel Darmanin

All applications by Manuel Darmanin

More from Robert Grech

All planning applications in San Pawl il-Bahar