---
title: "PA/00844/23: construct parapet wall on roof in Rabat (Gozo) | PropertyList"
url: https://propertylist.mt/permit/PA-00844-23/rabat-gozo-construct-parapet-wall-on-roof
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in Rabat (Gozo): To construct parapet wall on roof. Perit Mario Cordina. Validated 1 March 2023.

Planning applications › Rabat (Gozo) › PA0084423

# PA/00844/23: construct parapet wall on roof in Rabat (Gozo)

Victoria Regina, 28, 29, 30, 31, Pjazza Savina, Rabat (Gozo)

To construct parapet wall on roof.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Victoria Regina, 28, 29, 30, 31, Pjazza Savina, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** Mr George Larry Zammit
- **Perit:** [Perit Mario Cordina](https://propertylist.mt/perit/mario-cordina)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction
- **Received:** 26 January 2023
- **Validated:** 1 March 2023
- **Published:** 1 March 2023
- **Comments close:** 3 April 2023
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 11 July 2023
- **Permit expires:** 26 July 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00844/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00844&caseYear=23)

## Planning activity around Victoria Regina, 28, 29, 30, 31, Pjazza Savina, Rabat (Gozo)

195 other applications within 300 m: 116 granted, 2 refused, 25 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03387/25).

On Pjazza Savina: 6 other applications, 3 granted and 0 refused. Periti active on this street: [Mario Cordina](https://propertylist.mt/perit/mario-cordina), [Edward Scerri](https://propertylist.mt/perit/edward-scerri).

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03894/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-03894-24/rabat-gozo-facade-restoration): Proposed facade restoration. Granted, validated 3 July 2024, 14 m away
- [**PA/01669/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01669-22/rabat-gozo-extend-slightly-area-for-tables-and-chairs): To extend slightly area for tables and chairs and place timber platform and install railing. Status being checked, 21 m away
- [**PA/07526/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-07526-25/rabat-gozo-minor-alterations-to-facade-for-the-formation): Proposed minor alterations to facade for the formation of garage. Pending, validated 19 November 2025, 26 m away
- [**PA/01837/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-01837-21/rabat-gozo-alterations-to-that-approved-in-pa-01362-15): Proposed alterations to that approved in PA 01362/15 by removing proposed basement extension. Status being checked, 26 m away
- [**PA/05916/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05916-24/rabat-gozo-change-from-pre-1968-six): Change from pre-1968 six (6) bedroom townhouse (Class 1A) to seven (7) bedroom townhouse (Class 1C) including internal alterations, minor changes to facade… Granted, validated 4 September 2024, 29 m away
- [**PA/07681/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07681-23/rabat-gozo-construct-additions-at-roof-level): To construct additions at roof level. Granted, validated 3 January 2024, 29 m away
- [**PA/05292/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05292-24/rabat-gozo-propose-internal-and-external-alterations-and-additions): To propose internal and external alterations and additions to an existing pre-1967 building, including the construction of a rooftop pool and the installation… Granted, validated 7 August 2024, 32 m away
- [**PA/01594/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01594-22/rabat-gozo-change-of-use-from-a-class-2b): Proposed change of use from a Class 2B exhibition space to a Class 3C assembly and leisure. Status being checked, 32 m away
- [**PA/02377/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02377-22/rabat-gozo-carry-out-additions-and-alterations-to-existing): To carry out additions and alterations to existing terraced house. Granted, validated 6 April 2022, 48 m away
- [**PA/07402/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07402-23/rabat-gozo-propose-change-of-use-from-class-4b): To propose change of use from Class 4B (retails shop) to Class 2C(b) (educational). Granted, validated 12 December 2023, 49 m away
- [**PA/00979/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00979-25/rabat-gozo-change-the-use-of-a-class-4b): To change the use of a Class 4B photo shop into a Class 4C cafeteria, to fix sign, to carry out alterations and to sanction the carrying out of internal… Granted, validated 19 February 2025, 50 m away
- [**PA/00821/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00821-26/rabat-gozo-change-of-use-from-a-lounge-approved): Change of use from a lounge approved in PA/08762/19 to a wellness room Class 4B and to change internal ground floor finished floor levels allowing main… Granted, validated 11 February 2026, 55 m away
- [**PA/05073/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05073-24/rabat-gozo-additions-and-alterations-to-licensed-class-4c): Proposed additions and alterations to licensed Class 4C bar; proposed change of use to Class 4D bar and restaurant and proposed flat at first floor and duplex… Granted, validated 31 July 2024, 4 floors, 60 m away
- [**PA/06744/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06744-26/rabat-gozo-change-a-pre-1967-store-to-a-class): To change a pre-1967 store to a Class 4C shop. The proposal includes a built-in illuminated sign. Pending, validated 30 September 2026, 62 m away
- [**PA/03318/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-03318-25/rabat-gozo-wrought-iron-railing-infront-of-windows): Proposed wrought iron railing infront of windows; proposed wrought iron gate and proposed painting of facade at ground floor level. Granted, validated 9 September 2025, 62 m away

## More by Mario Cordina

- [**PA/06404/26** Birkirkara](https://propertylist.mt/permit/PA-06404-26/birkirkara-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of underground reservoir. Proposed construction of 4 Class 4D shops with signage… Pending, validated 16 September 2026
- [**PA/06289/26** Birkirkara](https://propertylist.mt/permit/PA-06289-26/birkirkara-sanction-changes-from-approved-pa3588-19-consisting-of): To sanction changes from approved PA3588/19 consisting of stairwell at roof level and internal layout changes. Pending, validated 16 September 2026
- [**PA/06015/26** Munxar](https://propertylist.mt/permit/PA-06015-26/munxar-private-swimming-pool-on-roof-and-private): Proposed private swimming pool on roof and private open stairwell to roof. Proposed change from washroom/pantry to bathroom in recessed floor unit. Granted, validated 15 October 2026
- [**PA/05496/26** Qormi](https://propertylist.mt/permit/PA-05496-26/qormi-demolish-existing-dilapidated-factory): To demolish existing dilapidated factory. Proposed excavation and construction of underground reservoir, 9 basement garages and 14 residential units. Pending, validated 19 August 2026, 1 floor
- [**PA/05450/26** Xewkija](https://propertylist.mt/permit/PA-05450-26/xewkija-demolition-of-existing-ruins): Proposed demolition of existing ruins. Proposed excavation and construction of reservoir, ground floor garage and 5 residential units. Pending, validated 5 August 2026, 1 floor
- [**PA/05444/26** Santa Venera](https://propertylist.mt/permit/PA-05444-26/santa-venera-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of reservoir, 2 garages and 8 residential units. Pending, validated 5 August 2026, 1 floor

[All applications by Mario Cordina](https://propertylist.mt/perit/mario-cordina)

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
