PA/00863/25: Change of use of 2 commercial offices in San Pawl il-Bahar
123, Telghet ix-Xemxija, Triq Raddet ir-Roti, San Pawl il-Bahar
Change of use of 2 commercial offices at ground floor to studio apartments, addition of a car space at basement level, addition of 2 pools at roof level.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 123, Telghet ix-Xemxija, Triq Raddet ir-Roti, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- E&T MCompany Attn: Thomas Mifsud
- Perit
- Perit Karl Ebejer
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Change of Use
- Residential units
- 2
- Received
- 4 December 2024
- Validated
- 12 February 2025
- Published
- 12 February 2025
- Comments close
- 14 March 2025
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 1 August 2025
- Permit expires
- 19 November 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 123, Telghet ix-Xemxija, Triq Raddet ir-Roti, San Pawl il-Bahar
106 other applications within 300 m: 63 granted, 2 refused, 10 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/03047/24).
On Triq Raddet ir-Roti: 13 other applications, 10 granted and 0 refused. Periti active on this street: Samuel Formosa, Cherylann Bonello.
Approval estimate for change of use applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05239/24 San Pawl il-Bahar: To sanction apartment as built from that approved in PA3732/82 namely internal yard and backyard configuration and the combined kitchen and dining area along…
- PA/00669/23 San Pawl il-Bahar: To sanction overall differences in layout and propose removal of dividing walls from kitchen, living and dining rooms.
- PA/00142/26 San Pawl il-Bahar: To sanction internal and external alterations (previously approved by PA/4103/23).
- PA/04103/23 San Pawl il-Bahar: To sanction variations of apartment as built which were covered with PA2906/07 and PA563/19.
- PA/01856/22 San Pawl il-Bahar: Proposed exterior alterations including side curtilage ramp and construction of pool.
- PA/00040/26 San Pawl il-Bahar: Proposal includes change of use of garage (at lower semi-basement level) to a public service garage.
- PA/00383/26 San Pawl il-Bahar: To construct pool at upper roof level and minor alterations to approved permit PA/05419/23.
- PA/05419/23 San Pawl il-Bahar: Proposed alterations in lieu of permit PA4530/16.
- PA/06416/23 San Pawl il-Bahar: It is proposed to sanction some minor internal and external variations and to change the existing use of a Class 4A office into a Class 4B hairdresser.
- PA/00550/25 San Pawl il-Bahar: Proposal includes change of use of garage (at lower semi-basement level) to a public service garage.
- PA/02458/23 San Pawl il-Bahar: To sanction minor alterations and proposed works as per approved drawings.
- PA/02577/21 San Pawl il-Bahar: Proposed additions and alterations to PA 4530/16 including internal alterations at level 5 and receded floor level and proposed overlying roof garden with pool.
- PA/07077/25 San Pawl il-Bahar: To sanction minor internal changes from PA/5364/22 including changes to lightweight gypsum partitions and soffit.
- PA/06725/23 San Pawl il-Bahar: Proposed internal and external alterations in lieu of PA3793/20. The proposal includes extensions at front and rear section of fifth floor level and removal…
- PA/00704/20 San Pawl il-Bahar: To sanction variations to apartment from previous approved permit PA/4530/16.
More by Karl Ebejer
- PA/07131/26 Msida: Correction of site plan for PA/03679/16.
- PA/07010/26 Hamrun: Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese…
- PA/06307/26 San Pawl il-Bahar: Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and…
- PA/06122/26 Swieqi: Proposed extension to the existing third-floor penthouse, including minor internal alterations, the construction of an additional recessed penthouse at…
- PA/06008/26 Marsaskala: Proposed sanctioning of changes from approved permits PA/00889/07.
- PA/05704/26 Floriana: To sanction minor existing discrepancies from approved drawings.