---
title: "PA/00866/21: internal and external alterations to existing dwelling in Rabat | PropertyList"
url: https://propertylist.mt/permit/PA-00866-21/rabat-internal-and-external-alterations-to-existing-dwelling
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Status being checked planning application in Rabat: Proposed internal and external alterations to existing dwelling, already regularised by RG3706/18, that…

Planning applications › Rabat › PA0086621

# PA/00866/21: internal and external alterations to existing dwelling in Rabat

22, Triq Godwin Ganado, Rabat

Proposed internal and external alterations to existing dwelling, already regularised by RG3706/18, that includes opening and closing-off of internal doorways and walls to create large kitchen/living area, formation of ensuite bathrooms, walk-in wardrobe and box rooms. Proposal also includes construction of external light-weight canopy in side curtilage.

- **Status:** Status being checked
- **Location:** 22, Triq Godwin Ganado, Rabat
- **Locality:** [Rabat](https://propertylist.mt/planning-applications/rabat)
- **Applicant:** Edward Degaetano
- **Perit:** [Perit Mark Abela](https://propertylist.mt/perit/mark-abela)
- **Type of works:** New Construction (Residential)
- **Residential units:** 1

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/00866/21)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=00866&caseYear=21)

## Planning activity around 22, Triq Godwin Ganado, Rabat

34 other applications within 300 m: 15 granted, 0 refused, 6 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 2 floors (PA/00478/23).

On Triq Godwin Ganado: 15 other applications, 6 granted and 0 refused; granted buildings are typically 2 floors, the tallest 2. Periti active on this street: [X,Y,Z Architecture & Design](https://propertylist.mt/perit/x-y-z-architecture-and-design), [Lara Lia](https://propertylist.mt/perit/lara-lia).

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 5 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01905/24** Rabat](https://propertylist.mt/permit/PA-01905-24/rabat-demolish-existing-detached-villa): To demolish existing detached villa, excavate site and construct new detached villa with basement and pool. Granted, validated 3 April 2024, 23 m away
- [**PA/04212/26** Rabat](https://propertylist.mt/permit/PA-04212-26/rabat-sanction-as-built-semi-detached-building-and-to): To sanction as built semi-detached building and to propose the relocation of the garage against that approved in PA/4801/95, a pool in the back garden and… Pending, validated 5 August 2026, 41 m away
- [**PA/07325/23** Rabat](https://propertylist.mt/permit/PA-07325-23/rabat-sanction-existing-rural-room-as-per-1978): To sanction existing rural room as per 1978 official aerial photo. Granted, validated 3 January 2024, 44 m away
- [**PA/02475/21** Rabat](https://propertylist.mt/permit/PA-02475-21/rabat-propose-internal-alterations-at-basement): To propose internal alterations at basement, ground, first and second floor level together with the removal of part of soil in garden to make room for pool,… Status being checked, 98 m away
- [**PA/01076/20** Rabat](https://propertylist.mt/permit/PA-01076-20/rabat-proposal-for-new-semi-detached-villa): Proposal for new semi-detached villa, works to include the excavation of pool, reservoir and basement, and the construction of 2 overlying floors and roof… Status being checked, 2 floors, 102 m away
- [**PA/01188/26** Rabat](https://propertylist.mt/permit/PA-01188-26/rabat-sanctioning-of-existing-canopy-for-dry-storing): Sanctioning of existing canopy for dry storing agriculture related items. Pending, validated 25 February 2026, 106 m away
- [**PA/01786/24** Rabat](https://propertylist.mt/permit/PA-01786-24/rabat-construct-drying-area-and-install-pv-panels): To construct drying area and install pv panels. Withdrawn, validated 27 March 2024, 106 m away
- [**PA/04270/23** Rabat](https://propertylist.mt/permit/PA-04270-23/rabat-additions-and-alterations-to-existing-building): Additions and alterations to existing building. Works include changes to elevations of villa(residential) and sanctioning of works already carried out. Granted, validated 19 July 2023, 110 m away
- [**PA/01318/22** Rabat](https://propertylist.mt/permit/PA-01318-22/rabat-alterations-to-external-area-at-semi-basement-level): Proposed alterations to external area at semi-basement level including excavation of earth for the construction of a swimming pool, washroom, jacuzzi, Pump… Status being checked, 114 m away
- [**PA/06317/21** Rabat](https://propertylist.mt/permit/PA-06317-21/rabat-construct-swimming-pool): To construct swimming pool, patio and related ancillary facilities at backyard Granted, validated 2 November 2021, 115 m away
- [**PA/02486/23** Rabat](https://propertylist.mt/permit/PA-02486-23/rabat-sanction-alterations-to-pa-08274-20): To sanction alterations to PA/08274/20, including internal and external changes at all levels, minor changes to side and back facade. Proposed addition of a… Granted, validated 3 May 2023, 127 m away
- [**PA/00478/23** Rabat](https://propertylist.mt/permit/PA-00478-23/rabat-renewal-of-pa3627-17-additions-and-alterations-to): Renewal of PA3627/17: Additions and alterations to two storey villa with underlying basement, including, extension of basement, installation of lift and… Granted, validated 7 March 2023, 2 floors, 129 m away
- [**PA/05976/26** Rabat](https://propertylist.mt/permit/PA-05976-26/rabat-demolition-of-existing-detached-villa): Demolition of existing detached villa, excavation of basement level and construction of detached villa with rooftop pool. Pending, validated 2 September 2026, 1 floor, 132 m away
- [**PA/03496/24** Rabat](https://propertylist.mt/permit/PA-03496-24/rabat-extension-along-back-terrace-to-extend-existing): Proposed extension along back terrace to extend existing garage at basement level and construction of pool. Granted, validated 12 June 2024, 137 m away
- [**PA/06945/25** Rabat](https://propertylist.mt/permit/PA-06945-25/rabat-demolish-the-existing-dwelling): To demolish the existing dwelling, excavate, and construct two semi-detached villas with pools. Pending, validated 29 October 2025, 138 m away

## More by Mark Abela

- [**PA/06115/26** Msida](https://propertylist.mt/permit/PA-06115-26/msida-sanctioning-of-minor-changes-from-pa4794-94): Proposed sanctioning of minor changes from PA4794/94, development of airspace to create 4 new units, and installation of new lift from first floor to receded… Pending, validated 9 September 2026
- [**PA/06083/26** Senglea (Isla)](https://propertylist.mt/permit/PA-06083-26/senglea-isla-change-of-use-from-class-4a-to): Proposed change of use from Class 4A to Class 1, and proposed different configuration to that approved in PA1193/25. Pending, validated 2 September 2026
- [**PA/06078/26** St Julians](https://propertylist.mt/permit/PA-06078-26/st-julians-removal-of-post-1967-platform): Proposed removal of post-1967 platform, excavation in loose material and rock trimming as may be required to allow construction of pool, pool deck area and… Pending, validated 9 September 2026
- [**PA/04812/26** Gzira](https://propertylist.mt/permit/PA-04812-26/gzira-sanction-minor-difference-from-approved-layouts-in): To sanction minor difference from approved layouts in PA/7611/17. Pending, validated 15 July 2026
- [**PA/03570/26** Rabat](https://propertylist.mt/permit/PA-03570-26/rabat-sanction-construction-of-dwarf-walls-at-level): To sanction construction of dwarf walls at level 0, underlying approved layout of PA/6469/20 and minor internal changes. Proposed domestic stores at level 0. Suspended, validated 3 June 2026
- [**PA/02976/26** Vittoriosa (Birgu)](https://propertylist.mt/permit/PA-02976-26/vittoriosa-birgu-extension-at-third-floor-level): Proposed extension at third floor level, and opening of new windows on facade. Suspended, validated 6 May 2026

[All applications by Mark Abela](https://propertylist.mt/perit/mark-abela)

[All planning applications in Rabat](https://propertylist.mt/planning-applications/rabat)
