propertylist

PA/01054/22: Demolition of existing washroom at second floor in Zejtun

Shema, 14, Triq Hector Dalli, Zejtun

Demolition of existing washroom at second floor and construction of a washroom in back yard at ground floor level, lift and stairs for common area, duplex dwelling unit at second and third floor, and installation of a chimney flue and PV panels.

Status
Status being checked
Location
Shema, 14, Triq Hector Dalli, Zejtun
Locality
Zejtun
Applicant
Ms Daniele Seychell & Ms Anette Buttigieg
Perit
Perit Joseph Saliba
Type of works
Demolition & New Construction (Residential)
Height
4 floors
Residential units
1

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Shema, 14, Triq Hector Dalli, Zejtun

91 other applications within 300 m: 66 granted, 3 refused, 5 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04847/26).

On Triq Hector Dalli: 7 other applications, 6 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Marvin Ellul.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Joseph Saliba

All applications by Joseph Saliba

All planning applications in Zejtun