> Granted planning application in Zebbug (Gozo): To extend penthouses approved in PA/01865/05 and PA/00981/09 and to construct 3 penthouses on airspace. Perit…

Planning applications › Zebbug (Gozo) › PA0123323

# PA/01233/23: extend penthouses approved in PA/01865/05 and PA/00981/09 in Zebbug (Gozo)

Penthouses 13, 14, 15 and airspace, Seabreeze, Triq Santa Marija, Marsalforn, Zebbug (Gozo)

To extend penthouses approved in PA/01865/05 and PA/00981/09 and to construct 3 penthouses on airspace.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Penthouses 13, 14, 15 and airspace, Seabreeze, Triq Santa Marija, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** [Mr Manuel Cini](https://propertylist.mt/applicant/manuel-cini)
- **Perit:** [Perit Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni)
- **Application type:** Full development permission - Summary Process
- **Zone:** Outside Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 3
- **Received:** 7 November 2022
- **Validated:** 17 May 2023
- **Published:** 29 March 2023
- **Comments close:** 20 April 2023
- **Decision:** Acceptable
- **Permit expires:** 31 May 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01233/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01233&caseYear=23)

## Planning activity around Penthouses 13, 14, 15 and airspace, Seabreeze, Triq Santa Marija, Marsalforn, Zebbug (Gozo)

62 other applications within 300 m: 42 granted, 2 refused, 4 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/02160/24).

On Triq Santa Marija: 31 other applications, 21 granted and 1 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Edward Scerri](https://propertylist.mt/perit/edward-scerri), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella), [Leonard Spiteri](https://propertylist.mt/perit/leonard-spiteri), [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto).

Approval estimate for new construction applications like this here: about 89% (likely range 59–100%, low reliability, from 15 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07258/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07258-25/zebbug-gozo-reconstruct-rubble-wall-along-street-and-to): To reconstruct rubble wall along street and to construct rubble wall on the west side and to include access gate. Refused, validated 12 November 2025, 14 m away
- [**PA/03419/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03419-26/zebbug-gozo-restore-existing-rubble-walls-including-small-access): To restore existing rubble walls including small access. Granted, validated 3 June 2026, 17 m away
- [**PA/05442/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05442-25/zebbug-gozo-extend-over-existing-airspace-by-creating-five): To extend over existing airspace by creating five (5) new units, including common parts. Granted, validated 4 November 2025, 114 m away
- [**PA/05441/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05441-25/zebbug-gozo-extend-over-existing-airspace-by-creating-four): To extend over existing airspace by creating four (4) new units, including the common parts. Granted, validated 19 November 2025, 119 m away
- [**PA/03038/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03038-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block D) by creating 4 new apartments and 1 new penthouse, including also installation of lift. Granted, validated 25 June 2024, 123 m away
- [**PA/04914/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04914-26/zebbug-gozo-erect-kiosk): To erect kiosk. Pending, validated 15 July 2026, 1 floor, 125 m away
- [**PA/05947/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05947-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block I) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 24 October 2024, 131 m away
- [**PA/05237/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05237-25/zebbug-gozo-construct-seven-residential-units-in-the-existing): To construct seven residential units in the existing airspace and to propose internal additions to the common areas on all levels to construct a lift shaft to… Withdrawn, 132 m away
- [**PA/05945/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05945-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block H) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 21 January 2025, 133 m away
- [**PA/05123/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05123-24/zebbug-gozo-extend-existing-penthouse-to-form-two-apartments): To extend existing penthouse to form two apartments and to construct penthouse above. Granted, validated 7 August 2024, 148 m away
- [**PA/01249/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01249-26/zebbug-gozo-extension-to-unit-at-the-receded-floor): Proposed extension to unit at the receded floor level, subdividing it into two separate units and the construction of an additional two units at the existing… Granted, validated 29 April 2026, 155 m away
- [**PA/03857/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03857-26/zebbug-gozo-extension-to-existing-unit-located-at-the): Proposed extension to existing unit located at the receded floor; sub-dividing it into two units and the construction of an additional unit at the existing… Pending, validated 26 August 2026, 3 floors plus a receded floor, 156 m away
- [**PA/02120/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02120-22/zebbug-gozo-extend-penthouse-approved-in-pa00432-21-and-to): To extend penthouse approved in PA00432/21 and to construct washrooms at roof level. Status being checked, 170 m away
- [**PA/00432/21** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00432-21/zebbug-gozo-carry-out-alterations-to-apartment-and-to): To carry out alterations to apartment and to construct a penthouse on top. Status being checked, 172 m away
- [**PA/04192/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04192-23/zebbug-gozo-sanction-tiles-on-facade-and-proposed-minor): To sanction tiles on facade and proposed minor internal alteration to existing private car garage. Granted, validated 22 August 2023, 178 m away

## More by Alexander Bigeni

- [**PA/07798/26** Nadur](https://propertylist.mt/permit/PA-07798-26/nadur-excavate-and-to-construct-9-residential-units): To excavate and to construct 9 residential units with underlying garages. Pending, 1 floor
- [**PA/07769/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07769-26/san-pawl-il-bahar-carry-out-alterations-and-additions-to-a): To carry out alterations and additions to a pre-1967 a residential dwelling. Alterations include changes to internal layout. Pending
- [**PA/07733/26** Qala](https://propertylist.mt/permit/PA-07733-26/qala-carry-out-alterations-to-internal-layout-and): To carry out alterations to internal layout and to facade of residential units approved in PA/07213/22 and PA/05532/24. To also sanction further excavation… Pending
- [**PA/07652/26** Nadur](https://propertylist.mt/permit/PA-07652-26/nadur-excavate-and-to-construct-an-agricultural-store): To excavate and to construct an agricultural store with an underlying basement. To also construct an underground water reservoir. Pending, 1 floor
- [**PA/07646/26** Xaghra](https://propertylist.mt/permit/PA-07646-26/xaghra-carry-out-alterations-and-extentions-to-dwelling): To carry out alterations and extentions to dwelling approved in PA/06703/22. Alterations include changes to layout and to facade. Pending
- [**PA/07631/26** Ghajnsielem](https://propertylist.mt/permit/PA-07631-26/ghajnsielem-demolish-existing-dwelling): To demolish existing dwelling, to excavate and to construct 12 residential units and 3 shops (Class 4B) with underlying garages. To also install signage. Pending

[All applications by Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni)

## More from Manuel Cini

- [**PA/00902/25** Nadur](https://propertylist.mt/permit/PA-00902-25/nadur-propose-subdivision-from-two-into-three-houses): To propose subdivision from two into three houses at basement, ground first and receded floor level in lieu of PA/07039/22. Granted, validated 12 February 2025, 2 floors plus a receded floor
- [**PA/06005/23** San Gwann](https://propertylist.mt/permit/PA-06005-23/san-gwann-change-of-use-from-garage): Change of use from garage (private use) to Class 4B retail shop. Proposal includes alterations to facade and proposed installation of external sign. Granted, validated 18 October 2023
- [**PA/01256/23** San Gwann](https://propertylist.mt/permit/PA-01256-23/san-gwann-change-of-use-from-garage): Change of use from garage (private use) to Class 4A office. Withdrawn, validated 8 March 2023

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)