---
title: "PA/01260/25: sanction variations of garage from previous permit in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-01260-25/san-pawl-il-bahar-sanction-variations-of-garage-from-previous-permit
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Withdrawn planning application in San Pawl il-Bahar: To sanction variations of garage from previous permit PA/5588/96. Perit Matthew Gauci.

Planning applications › San Pawl il-Bahar › PA0126025

# PA/01260/25: sanction variations of garage from previous permit in San Pawl il-Bahar

Maida Vale, Garage No. 3, Triq il-Port Ruman, San Pawl il-Bahar

To sanction variations of garage from previous permit PA/5588/96.

- **Status:** Withdrawn (This application for development permission has been withdrawn by the applicant.)
- **Location:** Maida Vale, Garage No. 3, Triq il-Port Ruman, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Victoria Saliba
- **Perit:** [Perit Matthew Gauci](https://propertylist.mt/perit/matthew-gauci)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 27 January 2025
- **Published:** 5 March 2025
- **Comments close:** 20 March 2025

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01260/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01260&caseYear=25)

## Planning activity around Maida Vale, Garage No. 3, Triq il-Port Ruman, San Pawl il-Bahar

116 other applications within 300 m: 78 granted, 2 refused, 12 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 11 floors (PA/02964/23).

On Triq il-Port Ruman: 12 other applications, 10 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 28 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01342/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01342-26/san-pawl-il-bahar-change-of-use-from-store-to-motor): Change of use from store to Motor Car Showroom. Withdrawn, validated 4 March 2026, 12 m away
- [**PA/05152/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05152-25/san-pawl-il-bahar-sanction-internal-and-external-variations-from-pa-19): To sanction internal and external variations from PA/1914/13. Variations mainly include positioning of walls and apertures. Granted, validated 12 November 2025, 25 m away
- [**PA/02682/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02682-26/san-pawl-il-bahar-alterations-to-existing-penthouse-and-proposed-const): Proposed alterations to existing penthouse and proposed construction of additional apartment and penthouse to approved permit, PA/04423/06. Granted, validated 29 April 2026, 35 m away
- [**PA/04024/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04024-24/san-pawl-il-bahar-propose-changes-to-internal-layout-approved-by): To propose changes to internal layout approved by RG/00926/22, also change of use from Class A (office) to Class 2A (medical clinic). Granted, validated 3 July 2024, 44 m away
- [**PA/01115/20** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01115-20/san-pawl-il-bahar-sanction-as-built-internal-alterations-at-shops): To sanction as built internal alterations at shop’s groundfloor and basement levels and minor alterations tofaçade (amendments to approved permit PA/04423/06) Status being checked, 49 m away
- [**PA/05034/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05034-25/san-pawl-il-bahar-demolish-existing-washroom-and-construct-one-bedroom): To demolish existing washroom and construct one bedroom unit at fourth floor level and duplex unit at fifth and sixth floor level. Granted, validated 6 August 2025, 6 floors, 50 m away
- [**PA/01289/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01289-25/san-pawl-il-bahar-construct-receded-unit-over-existing-receded-floor): To construct receded unit over existing receded floor with an open staircase connecting the new level to the roof. To also raise the stairwell block. Granted, validated 5 March 2025, 54 m away
- [**PA/05080/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05080-25/san-pawl-il-bahar-sanctioning-of-a-basement-garage-and-a): Sanctioning of a basement garage and a ground floor apartment as built over site covered by PA/00247/99. Granted, validated 13 October 2025, 55 m away
- [**PA/01524/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01524-24/san-pawl-il-bahar-demolish-existing-washroom-and-construct-one-bedroom): To demolish existing washroom and construct one bedroom unit at fourth floor level and duplex unit at fifth and sixth floor level. Granted, validated 13 March 2024, 7 floors, 55 m away
- [**PA/03829/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03829-25/san-pawl-il-bahar-sanctioning-of-variations-from-approved-permit-pa-04): Proposed sanctioning of variations from approved permit PA/04874/09 within Garden Apartments Block C flat 15, including proposed sanctioning of pool within… Granted, validated 9 July 2025, 57 m away
- [**PA/00815/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00815-22/san-pawl-il-bahar-demolish-existing-flats-and-garages-and-erect): To demolish existing flats and garages and erect 2 maisonettes, 2 Class 4B shops, 24 apartments, 4 penthouses and 17 garages. Status being checked, 59 m away
- [**PA/06205/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06205-26/san-pawl-il-bahar-restoration-of-ex-military-structure-including-alter): Restoration of ex-military structure including alterations and change of use to band club multipurpose hall. Sanctioning of extensions. Pending, validated 9 September 2026, 64 m away
- [**PA/07527/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07527-25/san-pawl-il-bahar-sanction-drive-and-ramp-as-built-from): To sanction drive and ramp as built from the approved permit PA/05139/02. Granted, validated 19 December 2025, 68 m away
- [**PA/08483/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08483-24/san-pawl-il-bahar-change-of-use-from-garage-to-class): Change of use from garage to Class 4B shop. Granted, validated 18 December 2024, 87 m away
- [**PA/07839/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07839-26/san-pawl-il-bahar-sanction-differences-of-garages-at-basement-levels): To sanction differences of garages at basement levels -1 and -2 , numbering and internal height of sixth floor, from approved development permission… Pending, 87 m away

## More by Matthew Gauci

- [**PA/07240/26** Sliema](https://propertylist.mt/permit/PA-07240-26/sliema-sanction-variations-from-previously-approved-permit-pa1797-08): To sanction variations from previously approved permit PA1797/08. Pending
- [**PA/07238/26** Sliema](https://propertylist.mt/permit/PA-07238-26/sliema-sanction-variations-from-previously-approved-permit-pa1797-08): To sanction variations from previously approved permit PA1797/08. Pending
- [**PA/07145/26** Mosta](https://propertylist.mt/permit/PA-07145-26/mosta-propose-demolition-of-existing-building-with-retention): Propose demolition of existing building with retention of the facade and excavation of two levels to construct of garages at basement, 1 bedroom unit at… Pending, validated 14 October 2026
- [**PA/07002/26** Birzebbuga](https://propertylist.mt/permit/PA-07002-26/birzebbuga-amendment-to-pa3173-24): Amendment to PA3173/24, to include additional property in the redevelopment of both sites including demolition of existing structures and construction of… Pending, validated 14 October 2026, 3 floors plus a receded floor
- [**PA/06929/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06929-26/san-pawl-il-bahar-sanctioning-of-internal-variations-from-approved-per): Sanctioning of internal variations from approved permit PA/1653/17 (MA), including the reinstatement of the third bedroom in accordance with the layout… Pending
- [**PA/06547/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06547-26/san-pawl-il-bahar-amendment-to-pa-6301-23-previously-approved-in-pa-13): Amendment to PA/6301/23 previously approved in PA/1311/18 including demolition of roof above 5th floor and extension of same floor, construction of 6th floor… Pending, 6 floors plus a receded floor

[All applications by Matthew Gauci](https://propertylist.mt/perit/matthew-gauci)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
