propertylist

PA/01280/26: demolition of existing hotel in Sliema

117, Chalet Hotel, Triq it-Torri, Sliema

Proposed demolition of existing hotel, excavation of reservoir and basement and proposed construction of a Class 3B 3-star hotel with an indoor pool (at basement level) and outdoor pool (at receded level). Application also include a Class 4D restaurant at ground floor level.

Status
Suspended (Decision suspended to allow for further assessment)
Location
117, Chalet Hotel, Triq it-Torri, Sliema
Locality
Sliema
Applicant
Sliema Chalet Co. Ltd Attn: Ephraim Schembri
Perit
JG Periti
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Commercial)
Height
1 floor plus a receded floor
Received
18 December 2025
Validated
4 March 2026
Published
4 March 2026
Comments close
10 April 2026
Recommendation
Grant Permission

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 117, Chalet Hotel, Triq it-Torri, Sliema

187 other applications within 300 m: 105 granted, 9 refused, 18 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 15 floors (PA/07209/23).

On Triq it-Torri: 141 other applications, 75 granted and 7 refused; granted buildings are typically 8 floors, the tallest 15. Periti active on this street: Edwin Mintoff, David Vassallo, Paul Camilleri, Malcolm Xuereb, Christian Spiteri.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 11 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by JG Periti

All applications by JG Periti

All planning applications in Sliema