---
title: "PA/01297/20: construct a boundary rubble wall in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-01297-20/san-pawl-il-bahar-construct-a-boundary-rubble-wall
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in San Pawl il-Bahar: To construct a boundary rubble wall. Perit Joseph Bondin. Validated 4 March 2020.

Planning applications › San Pawl il-Bahar › PA0129720

# PA/01297/20: construct a boundary rubble wall in San Pawl il-Bahar

Tas-Saghjtri Farmhouse, Triq Ghajn Rihana, Burmarrad, San Pawl il-Bahar

To construct a boundary rubble wall.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Tas-Saghjtri Farmhouse, Triq Ghajn Rihana, Burmarrad, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Mr Mario Buhagiar](https://propertylist.mt/applicant/mario-buhagiar)
- **Perit:** [Perit Joseph Bondin](https://propertylist.mt/perit/joseph-bondin)
- **Application type:** Full development permission
- **Zone:** Outside Development Zone
- **Type of works:** New Construction
- **Received:** 4 February 2020
- **Validated:** 4 March 2020
- **Published:** 4 March 2020
- **Comments close:** 3 April 2020
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 17 June 2020
- **Permit expires:** 18 November 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01297/20)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01297&caseYear=20)

## Planning activity around Tas-Saghjtri Farmhouse, Triq Ghajn Rihana, Burmarrad, San Pawl il-Bahar

1 other application within 300 m: 0 granted, 0 refused, 0 pending.

On Triq Ghajn Rihana: 1 other application, 0 granted and 0 refused.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 0 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03273/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03273-21/san-pawl-il-bahar-construction-of-outdoor-swimming-pool): Construction of outdoor swimming pool (alterations to PA4549/20). Status being checked, 513 m away

## More by Joseph Bondin

- [**PA/07614/26** St Julians](https://propertylist.mt/permit/PA-07614-26/st-julians-changes-in-layout-to-approved-class-3b): Proposed changes in layout to approved Class 3B hotel in PA/2151/23, changes include merging of property to existing hotel approved in PA/6725/20. Proposal… Pending
- [**PA/07580/26** Mosta](https://propertylist.mt/permit/PA-07580-26/mosta-demolition-of-existing-townhouse-and-change-of): Proposed demolition of existing townhouse and change of use from Class 1 residential to construct Class 3A five-storey guesthouse comprising a total of 18… Pending, 5 floors plus a receded floor
- [**PA/07514/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07514-26/san-pawl-il-bahar-change-of-use-at-first-floor-level): Proposed change of use at first floor level from Class 4A offices to Class 2C educational institution for foreign students coming over to Malta for… Pending, validated 28 October 2026
- [**PA/07400/26** Ghaxaq](https://propertylist.mt/permit/PA-07400-26/ghaxaq-demolish-existing-building): To demolish existing building, to excavate 3 basement levels and construct 5 story apartment building with pools at ground floor and roof level. Pending, validated 28 October 2026, 5 floors
- [**PA/07349/26** Birkirkara](https://propertylist.mt/permit/PA-07349-26/birkirkara-alterations-and-correction-of-site-following-survey): Proposed alterations and correction of site following survey as built for levels which have been approved by planning applications PA/2035/20 and PA/4006/22.… Pending, validated 28 October 2026
- [**PA/07300/26** Qormi](https://propertylist.mt/permit/PA-07300-26/qormi-demolition-of-existing-building): Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,… Pending, validated 21 October 2026, 6 floors

[All applications by Joseph Bondin](https://propertylist.mt/perit/joseph-bondin)

## More from Mario Buhagiar

- [**PA/04865/26** Balzan](https://propertylist.mt/permit/PA-04865-26/balzan-sanction-post-1967-apertures): To sanction post 1967 apertures (changes to the facade as approved in PB/1852/82 have not been carried out. Granted, validated 4 August 2026
- [**PA/01074/26** Pieta](https://propertylist.mt/permit/PA-01074-26/pieta-propose-alterations-at-third-floor-apartment): To propose alterations at third floor apartment. Granted, validated 25 February 2026
- [**PA/05099/25** Pieta](https://propertylist.mt/permit/PA-05099-25/pieta-subdivision-of-one-apartment-into-two-one-bedrooms): Subdivision of one apartment into two one-bedrooms. Granted, validated 15 October 2025
- [**PA/02483/23** Mosta](https://propertylist.mt/permit/PA-02483-23/mosta-propose-widening-of-garage-door-and-a): To propose widening of garage door and a public service vehicle space in private garage. Granted, validated 17 May 2023
- [**PA/03287/22** Zabbar](https://propertylist.mt/permit/PA-03287-22/zabbar-sanction-differences-from-approved-pa2189-06-namely-balcony): To sanction differences from approved PA2189/06 namely balcony on facade, changes to openings and shifting of walls. Status being checked
- [**PA/03273/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03273-21/san-pawl-il-bahar-construction-of-outdoor-swimming-pool): Construction of outdoor swimming pool (alterations to PA4549/20). Status being checked

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
