> Status being checked planning application in Rabat (Gozo): To sanction variations from approved drawings in PA/04318/10, mostly consisting of correction of…

Planning applications › Rabat (Gozo) › PA0138322

# PA/01383/22: sanction variations from approved drawings in PA/04318/10 in Rabat (Gozo)

65, Triq il-Madonna tal-Karmnu c/w, Triq il-Karmnu, Rabat (Gozo)

To sanction variations from approved drawings in PA/04318/10, mostly consisting of correction of survey drawings. Proposed minor alterations. Slight increase in area of roof structure, within area already approved in PA/04318/10. Restoration of facade.

- **Status:** Status being checked
- **Location:** 65, Triq il-Madonna tal-Karmnu c/w, Triq il-Karmnu, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** Mr David and Ms Lorrieann Vella
- **Perit:** [Perit Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb)
- **Type of works:** Sanctioning

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01383/22)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01383&caseYear=22)

## Planning activity around 65, Triq il-Madonna tal-Karmnu c/w, Triq il-Karmnu, Rabat (Gozo)

218 other applications within 300 m: 137 granted, 3 refused, 29 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03387/25).

On Triq il-Madonna tal-Karmnu: 2 other applications, 1 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 33 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/04454/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04454-24/rabat-gozo-restore-niche): To restore niche. Granted, validated 10 July 2024, 6 m away
- [**PA/01929/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-01929-25/rabat-gozo-reconstruct-roof-of-a-pre-1967-mill-room): To reconstruct roof of a pre-1967 mill room. Pending, validated 26 March 2025, 8 m away
- [**PA/07322/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07322-26/rabat-gozo-replace-front-timber-door-and-restore-facade): To replace front timber door and restore facade wall. Pending, validated 21 October 2026, 15 m away
- [**PA/08005/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-08005-25/rabat-gozo-internal-alterations-and-additions-to-existing-pre-1967): Internal alterations and additions to existing pre-1967 dwelling. To link property to adjacent dwelling approved in PA/01383/22. Granted, validated 10 December 2025, 20 m away
- [**PA/01725/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-01725-24/rabat-gozo-construct-washrooms-on-existing-airspace): To construct washrooms on existing airspace. Granted, validated 3 April 2024, 29 m away
- [**PA/00717/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00717-20/rabat-gozo-sanction-differences-from-pa-2577-02-and-to): To sanction differences from PA 2577/02 and to construct additional rooms at roof level Status being checked, 32 m away
- [**PA/02665/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-02665-24/rabat-gozo-carry-out-alterations-to-terraced-house-and): To carry out alterations to terraced house and to change use to a guesthouse (Class 3A). Alterations include changes to internal layout. To also carry out… Granted, validated 8 May 2024, 36 m away
- [**PA/02814/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02814-22/rabat-gozo-additions-and-alterations-to-existing-house): Additions and alterations to existing house. Mainly an additional floor level, more bedrooms and bathrooms. Status being checked, 38 m away
- [**PA/00733/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-00733-23/rabat-gozo-construction-of-apartment-on-second-floor-and): Proposed construction of apartment on second floor and sanctioning of changes from approved permit PB 543/89. Granted, validated 22 February 2023, 3 floors, 41 m away
- [**PA/06404/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06404-24/rabat-gozo-demolish-existing-dwelling): To demolish existing dwelling, to excavate and to construct a terraced house with a garage. Granted, validated 25 September 2024, 46 m away
- [**PA/03343/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-03343-21/rabat-gozo-sanction-variations-from-pa-07451-19-at-receded-level): To sanction variations from PA/07451/19 at receded level only Status being checked, 48 m away
- [**PA/01909/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-01909-25/rabat-gozo-sanction-changes-to-garage-dimensions-from-that): To sanction changes to garage dimensions from that approved in PA4058/01. Granted, validated 11 April 2025, 52 m away
- [**PA/00322/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00322-20/rabat-gozo-extend-the-first-floor-and-carry-out): To extend the first floor and carry out minor internal alterations which consist of demolishing and construction of walls. Proposal includes the cleaning and… Status being checked, 52 m away
- [**PA/03371/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-03371-21/rabat-gozo-carry-out-internal-and-external-alterations-from): To carry out internal and external alterations from that approved in PA/00322/20 and to construct an additional floor on top. To change also the use from a… Status being checked, 55 m away
- [**PA/01494/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-01494-26/rabat-gozo-sanction-alterations-to-terraced-houses-approved-in): To sanction alterations to terraced houses approved in PA/00088/21. Alterations include changes to layout, levels, relocation of water reservoir and to… Pending, validated 11 March 2026, 58 m away

## More by Mariella Xuereb

- [**PA/07663/26** Xaghra](https://propertylist.mt/permit/PA-07663-26/xaghra-sanction-minor-deviations-from-pa-04078-04-and-rg-00621-24): To sanction minor deviations from PA/04078/04 and RG/00621/24. Pending
- [**PA/07257/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07257-26/rabat-gozo-replacement-of-apertures): Replacement of apertures (accepted through GS/00020/25). Pending
- [**PA/06884/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06884-26/rabat-gozo-restoration-of-facade): Restoration of facade (accepted through GS/00043/25). Pending
- [**PA/06597/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06597-26/rabat-gozo-demolish-existing-structures-and-propose-a-terraced): To demolish existing structures and propose a terraced house organised on two floors with access to roof and a garage for private cars. To excavate and… Pending, 2 floors
- [**PA/06568/26** Qala](https://propertylist.mt/permit/PA-06568-26/qala-construction-of-3-stables-with-ancillary-facilities): Construction of 3 stables with ancillary facilities, a reservoir and installation of timber gates. Pending, validated 23 September 2026
- [**PA/06397/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06397-26/rabat-gozo-restoration-of-facade): Restoration of facade (BHRS25). Granted, validated 15 October 2026

[All applications by Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb)

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)