PA/01441/24: change of use from Class 4D restaurant in Zabbar
50, Triq il-Kunvent c/w, Triq Tumas Dingli, Zabbar
Proposed change of use from Class 4D restaurant to Class 4B retail.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 50, Triq il-Kunvent c/w, Triq Tumas Dingli, Zabbar
- Locality
- Zabbar
- Applicant
- Grazio Borg
- Perit
- JG Periti
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Change of Use
- Received
- 26 October 2023
- Validated
- 13 March 2024
- Published
- 13 March 2024
- Comments close
- 19 April 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 22 May 2024
- Permit expires
- 5 June 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 50, Triq il-Kunvent c/w, Triq Tumas Dingli, Zabbar
252 other applications within 300 m: 163 granted, 5 refused, 25 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/00167/25).
On Triq il-Kunvent: 20 other applications, 11 granted and 1 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Randolph Nicholas Bartoli, Joseph Saliba, Falzon & Cutajar, Colin Zammit.
Approval estimate for change of use applications like this here: about 91% (likely range 61–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/04905/25 Zabbar: Proposed sanctioning of two apartments from previously approved single residence in permit PA/1175/15 and changes to internal layout at all levels including…
- PA/04144/24 Zabbar: To demolish existing public lavatory and to construct a Class 3C multi-purpose hall built on three levels.
- PA/01010/24 Zabbar: To demolish existing dwelling and construct a Class 4B retail shop at ground floor level and 3 overlying apartments and a penthouse.
- PA/07590/24 Zabbar: Sanctioning of minor alterations and change of Class use from Class 1 to Class 4A
- PA/08612/24 Zabbar: To propose internal and external alterations in lieu PA/5776/21, to propose change of use into a shop Class 4B, signage and additional apartments at second…
- PA/01139/25 Zabbar: To demolish existing building and excavate 1 level to construct parking spaces at basement level, maisonette at ground floor level, 3 overlying apartments and…
- PA/00809/23 Zabbar: Proposed construction of ground floor garages, with three overlying apartments and a penthouse at recessed floor level.
- PA/00999/21 Zabbar: Proposed alterations to existing bocci club including construction of lightweight canopy plus other internal and external alterations.
- PA/03642/23 Zabbar: Change of use from a garage to a Class 4C shop include signage.
- PA/01910/22 Zabbar: Proposed extension at first floor level to existing bocci club.
- PA/00330/22 Zabbar: Remodelling of townhouse including redevelopment of rooms at back of property due to heavily deteriorated roof slabs and cracked walls, internal alterations,…
- PA/01511/24 Zabbar: Internal and external modifications in backyard, to excavate and develop swimming pool and jacuzzi at ground floor level and addition of pump room.
- PA/01108/22 Zabbar: Demolition of parts of dilapidated house including shop at corner, retaining facade, alterations to existing ground floor facade, construction of two storey…
- PA/01331/21 Zabbar: Sanctioning of minor variations to development as approved in PA 2794/05, and change of use from Class 4B shop and ancillary store as approved in the same…
- PA/03889/26 Zabbar: Shifting of living quarters from ground floor to first floor, including other internal additions and alterations.
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…
More from Grazio Borg
- PA/04334/26 Fgura: To sanction changes and use to street level garage approved in PA/00235/93. Changes include increase in height of garage and of garage door and change of use…
- PA/04747/23 Zabbar: Proposed demolition while retaining facade and construction of dwelling.
- PA/00400/21 Paola: Proposed sanctioning of canopy and construction of facade over existing building approved by DN 1225/15.