---
title: "PA/01473/24: sanction maisonette as is in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-01473-24/san-pawl-il-bahar-sanction-maisonette-as-is
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in San Pawl il-Bahar: To sanction maisonette as is. Perit Rupert Pace. Validated 19 June 2024.

Planning applications › San Pawl il-Bahar › PA0147324

# PA/01473/24: sanction maisonette as is in San Pawl il-Bahar

Flat 4, Plot 9, Triq il-Qala, Qawra, San Pawl il-Bahar

To sanction maisonette as is.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Flat 4, Plot 9, Triq il-Qala, Qawra, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Wladyslawa Nowicky
- **Perit:** [Perit Rupert Pace](https://propertylist.mt/perit/rupert-pace)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 31 January 2024
- **Validated:** 19 June 2024
- **Published:** 19 June 2024
- **Comments close:** 19 July 2024
- **Recommendation:** Refuse Permission
- **Decision:** Grant Permission
- **Decision date:** 5 November 2025
- **Permit expires:** 19 November 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01473/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01473&caseYear=24)

## Planning activity around Flat 4, Plot 9, Triq il-Qala, Qawra, San Pawl il-Bahar

88 other applications within 300 m: 56 granted, 2 refused, 5 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/03552/23).

On Triq il-Qala: 2 other applications, 0 granted and 0 refused. Periti active on this street: [Reuben Borg](https://propertylist.mt/perit/reuben-borg).

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 32 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03457/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03457-25/san-pawl-il-bahar-excavate-and-extend-garage): To excavate and extend garage, changes to internal partitions of elevated ground floor and extension of existing balcony. Withdrawn, validated 10 September 2025, 1 floor, 16 m away
- [**PA/04664/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04664-26/san-pawl-il-bahar-demolish-two-existing-maisonettes-and-garages): To demolish two existing maisonettes and garages, excavate and construct basement garage, two overlying maisonettes and pool at roof level. Suspended, validated 8 July 2026, 2 floors, 22 m away
- [**PA/05095/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05095-24/san-pawl-il-bahar-sanction-departures-in-private-car-garage-as): To sanction departures in private car garage as built from approved drawings in PA/4288/00 which includes differences in internal layout and in the elevation.… Granted, validated 31 July 2024, 46 m away
- [**PA/00253/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00253-25/san-pawl-il-bahar-alterations-to-second-floor-and-extension-at): Alterations to second floor and extension at third floor to pre-1967 maisonette. Granted, validated 22 January 2025, 4 floors, 53 m away
- [**PA/00522/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00522-25/san-pawl-il-bahar-change-of-use-from-private-car-garage): Change of use from private car garage to public car garage. Refused, validated 29 January 2025, 54 m away
- [**PA/03659/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03659-26/san-pawl-il-bahar-sanctioning-of-alterations-and-extension-to-pre-1968): Sanctioning of alterations and extension to pre-1968 garages, including proposed internal alterations to sub-divide garages. Granted, validated 10 June 2026, 74 m away
- [**PA/04666/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04666-23/san-pawl-il-bahar-alterations-to-a-penthouse-at-the-fifth-floor): Alterations to a penthouse at the fifth-floor level and extension at the sixth-floor level to create a duplex apartment. Granted, validated 2 August 2023, 6 floors, 99 m away
- [**PA/05425/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05425-23/san-pawl-il-bahar-sanction-existing-sign-on-class-4-stationery): To sanction existing sign on Class 4 stationery façade including correction of site. Granted, validated 26 October 2023, 102 m away
- [**PA/04238/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04238-23/san-pawl-il-bahar-placement-of-reverse-vending-machine): Placement of reverse vending machine (RVM) for container recycling. Withdrawn, 103 m away
- [**PA/06855/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06855-23/san-pawl-il-bahar-sanctioning-of-minor-alterations): Sanctioning of minor alterations. Granted, validated 15 November 2023, 106 m away
- [**PA/04700/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04700-26/san-pawl-il-bahar-sanctioning-of-internal-and-external-differences-to): Sanctioning of internal and external differences to as built apartment from approved permit PA5207/00. Granted, validated 25 August 2026, 117 m away
- [**PA/03970/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03970-23/san-pawl-il-bahar-sanctioning-of-alterations-to-approved-pa-05207-00-w): Proposed sanctioning of alterations to approved PA/05207/00 which changes include removal of internal walls and roofing of part of back yard. Granted, validated 28 September 2023, 119 m away
- [**PA/02315/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02315-21/san-pawl-il-bahar-construct-2-floors-and-1-receded-floor): To construct 2 floors and 1 receded floor above 2 existing apartment blocks Status being checked, 120 m away
- [**PA/05719/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05719-24/san-pawl-il-bahar-sanction-minor-variations-from-papb3753-99-following): To sanction minor variations from PAPB3753/99 following site survey. Granted, validated 22 October 2024, 122 m away
- [**PA/03146/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03146-21/san-pawl-il-bahar-sanction-garage-as-built): To sanction garage as built, on a larger footprint and with variances from approved permit PB3633/86 Status being checked, 135 m away

## More by Rupert Pace

- [**PA/05563/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05563-26/san-pawl-il-bahar-sanction-layout-of-apartment-as-is): To sanction layout of apartment as is. Previous permit is PAPB524/87. Pending, validated 19 August 2026
- [**PA/05562/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05562-26/san-pawl-il-bahar-sanction-layout-of-apartment-as-is): To sanction layout of apartment as is. Previous permit is PAPB524/87. Pending, validated 19 August 2026
- [**PA/03676/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03676-26/san-pawl-il-bahar-sanction-existing-sports-club-as-is): To sanction existing sports club as is. Sanctioning includes the creation of an ancillary catering establishment and extension of premises Suspended, validated 10 June 2026
- [**PA/06632/25** Fgura](https://propertylist.mt/permit/PA-06632-25/fgura-sanction-alterations-to-pa6035-16-and-creation-of): To sanction alterations to PA6035/16 and creation of a new dwelling. Pending, validated 27 November 2025
- [**PA/06507/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06507-25/san-pawl-il-bahar-sanction-minor-alterations-to-dwelling-post-rg626-16): To sanction minor alterations to dwelling post RG626/16. Granted, validated 13 November 2025
- [**PA/06217/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06217-25/san-pawl-il-bahar-alterations-to-pa-2677-10-including-extension-of): Alterations to PA 2677/10 including extension of top apartment. Granted, validated 1 October 2025

[All applications by Rupert Pace](https://propertylist.mt/perit/rupert-pace)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
