---
title: "PA/01493/21: internal and external alterations to the existing in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-01493-21/san-pawl-il-bahar-internal-and-external-alterations-to-the-existing
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Status being checked planning application in San Pawl il-Bahar: Proposed internal and external alterations to the existing dwelling. Proposal also includes…

Planning applications › San Pawl il-Bahar › PA0149321

# PA/01493/21: internal and external alterations to the existing in San Pawl il-Bahar

139, Dolphin, Triq Parades, San Pawl il-Bahar

Proposed internal and external alterations to the existing dwelling. Proposal also includes construction of additional floors and installation of lift.

- **Status:** Status being checked
- **Location:** 139, Dolphin, Triq Parades, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Charles Ebejer](https://propertylist.mt/applicant/charles-ebejer)
- **Perit:** [Perit Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)
- **Type of works:** New Construction (Residential)
- **Residential units:** 1

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01493/21)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01493&caseYear=21)

## Planning activity around 139, Dolphin, Triq Parades, San Pawl il-Bahar

95 other applications within 300 m: 64 granted, 1 refused, 12 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/05908/25).

On Triq Parades: 24 other applications, 15 granted and 0 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: [Adam Pace](https://propertylist.mt/perit/adam-pace).

Approval estimate for new construction applications like this here: about 92% (likely range 62–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/04938/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04938-26/san-pawl-il-bahar-demolition-of-existing-2-maisonettes): Proposed demolition of existing 2 maisonettes, and construction of 7 dwellings from ground till receded floor. Proposal includes connection with approved… Pending, validated 19 August 2026, 1 floor plus a receded floor, 21 m away
- [**PA/01883/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01883-23/san-pawl-il-bahar-changes-in-layout-and-design-from-pa-03618-19): Proposed changes in layout and design from PA/03618/19 including, changes to retain existing floor layout at fourth floor and extension at fifth floor with… Granted, validated 16 May 2023, 6 floors, 21 m away
- [**PA/04063/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04063-24/san-pawl-il-bahar-demolition-of-existing-building): Demolition of existing building, excavation of reservoir and basement level (domestic store), and construction of 7 dwellings from ground till receded floor… Granted, validated 3 July 2024, 27 m away
- [**PA/05618/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05618-25/san-pawl-il-bahar-alterations-to-facade-removal-of-existing-tiling): Alterations to facade: removal of existing tiling and replacing by rendering and a marble dado. Granted, validated 24 September 2025, 28 m away
- [**PA/04821/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04821-23/san-pawl-il-bahar-sanction-minor-internal-variations-on-a-pre-67): To sanction minor internal variations on a pre-67 property from previous permit PA3501/21 and DN1235/17. Granted, validated 16 August 2023, 30 m away
- [**PA/03501/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03501-21/san-pawl-il-bahar-extension-of-room-at-2nd-floor-and): Extension of room at 2nd floor and installation of retractable awning in backyard. Status being checked, 34 m away
- [**PA/06341/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06341-26/san-pawl-il-bahar-project-involves-the-demolition-of-the-existing): The project involves the demolition of the existing structure, excavation of one basement level, and construction of a Class 3B hotel. The proposal includes… Pending, validated 16 September 2026, 9 floors, 36 m away
- [**PA/08324/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08324-24/san-pawl-il-bahar-demolition-of-existing-townhouse): Demolition of existing townhouse, excavation of 2 basement levels and construction of 2 levels of basement parking spaces, a 2-bedroom maisonette at ground… Granted, validated 11 December 2024, 6 floors plus a receded floor, 36 m away
- [**PA/01731/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01731-23/san-pawl-il-bahar-renewal-of-pa-00444-18): Renewal of PA/00444/18 (To demolish 2 maisonettes and propose one storey excavation, and to construct 3 basement garages and overlying 10 residential units.) Granted, validated 9 May 2023, 36 m away
- [**PA/00133/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00133-22/san-pawl-il-bahar-minor-internal-alterations-to-existing-pre-1967-resi): Minor internal alterations to existing pre-1967 residential unit, alterations include widening of 2 doors, creation of a study and change of use from… Status being checked, 38 m away
- [**PA/08322/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08322-25/san-pawl-il-bahar-demolition-of-existing-elevated-maisonette-and-const): Demolition of existing elevated maisonette and construction of 5 dwellings and rooftop pool. Granted, validated 24 December 2025, 48 m away
- [**PA/02973/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02973-21/san-pawl-il-bahar-sanctioning-of-property-as-built-with-variations): Sanctioning of property as built with variations to PA/09217/17 including the sub-division of the duplex and triplex units into 3 apartments and one duplex. Status being checked, 48 m away
- [**PA/04900/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04900-25/san-pawl-il-bahar-excavate-and-construct-basement-garages): To excavate and construct basement garages, two maisonettes at ground floor level, fifteen apartments from first till fifth floor and two penthouses at… Granted, validated 23 July 2025, 6 floors plus a receded floor, 53 m away
- [**PA/07207/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07207-24/san-pawl-il-bahar-demolish-existing-dwelling-and-construct-1no-class): To demolish existing dwelling and construct 1no Class 4A office at ground floor level and 2no duplex apartments at first, second, third and fourth floor levels. Granted, validated 23 October 2024, 5 floors, 53 m away
- [**PA/01205/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01205-21/san-pawl-il-bahar-excavation-of-site-for-construction-of-2): Proposed excavation of site for construction of 2 levels of basement and construction of basement garages and parking spaces and proposed construction of 2… Status being checked, 7 floors, 56 m away

## More by Karl Ebejer

- [**PA/07131/26** Msida](https://propertylist.mt/permit/PA-07131-26/msida-correction-of-site-plan-for-pa-03679-16): Correction of site plan for PA/03679/16. Pending
- [**PA/07010/26** Hamrun](https://propertylist.mt/permit/PA-07010-26/hamrun-demolition-of-existing-first-floor-maisonette-excluding): Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese… Pending, validated 14 October 2026, 4 floors
- [**PA/06307/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06307-26/san-pawl-il-bahar-construction-of-three-additional-full-floors-and): Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and… Pending, validated 16 September 2026, 6 floors plus a receded floor
- [**PA/06122/26** Swieqi](https://propertylist.mt/permit/PA-06122-26/swieqi-extension-to-the-existing-third-floor-penthouse): Proposed extension to the existing third-floor penthouse, including minor internal alterations, the construction of an additional recessed penthouse at… Pending, validated 9 September 2026, 4 floors plus a receded floor
- [**PA/06008/26** Marsaskala](https://propertylist.mt/permit/PA-06008-26/marsaskala-sanctioning-of-changes-from-approved-permits-pa-00889-07): Proposed sanctioning of changes from approved permits PA/00889/07. Granted, validated 24 September 2026
- [**PA/05704/26** Floriana](https://propertylist.mt/permit/PA-05704-26/floriana-sanction-minor-existing-discrepancies-from-approved-drawings): To sanction minor existing discrepancies from approved drawings. Granted, validated 19 August 2026

[All applications by Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)

## More from Charles Ebejer

- [**PA/07010/26** Hamrun](https://propertylist.mt/permit/PA-07010-26/hamrun-demolition-of-existing-first-floor-maisonette-excluding): Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese… Pending, validated 14 October 2026, 4 floors
- [**PA/06307/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06307-26/san-pawl-il-bahar-construction-of-three-additional-full-floors-and): Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and… Pending, validated 16 September 2026, 6 floors plus a receded floor
- [**PA/05599/26** Fgura](https://propertylist.mt/permit/PA-05599-26/fgura-demolition-of-the-existing-first-floor-maisonette-and): Demolition of the existing first-floor maisonette and construction of six apartments and two penthouses over the first, second, third and receded floor… Pending, validated 19 August 2026, 3 floors plus a receded floor
- [**PA/04491/26** Birkirkara](https://propertylist.mt/permit/PA-04491-26/birkirkara-demolition-of-the-existing-garage-and-first-floor): Demolition of the existing garage and first-floor maisonette, excavation of one basement level, and construction of a residential development comprising… Granted, validated 1 July 2026, 4 floors plus a receded floor
- [**PA/04475/26** Gzira](https://propertylist.mt/permit/PA-04475-26/gzira-partial-demolition-of-property-retaining-facade): Partial demolition of property retaining facade. Excavation and construction of 42 underground parking garages, five overlying floors and a receded floor… Suspended, validated 1 July 2026, 5 floors plus a receded floor
- [**PA/02539/26** Birkirkara](https://propertylist.mt/permit/PA-02539-26/birkirkara-demolition-of-the-existing-common-area): Proposed demolition of the existing common area, first floor and roof level, and the construction of new first, second and third floor levels, each consisting… Granted, validated 22 April 2026, 4 floors plus a receded floor

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
