---
title: "PA/01586/23: internal and external alterations in apartment Nº in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-01586-23/san-pawl-il-bahar-internal-and-external-alterations-in-apartment-n
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in San Pawl il-Bahar: Proposed internal and external alterations in apartment Nº 41 on first floor level. Previous permits…

Planning applications › San Pawl il-Bahar › PA0158623

# PA/01586/23: internal and external alterations in apartment Nº in San Pawl il-Bahar

Trithon Court, Block P, Flat 41, Triq il-Kurazza, Qawra, San Pawl il-Bahar

Proposed internal and external alterations in apartment Nº 41 on first floor level. Previous permits PA1475/65.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Trithon Court, Block P, Flat 41, Triq il-Kurazza, Qawra, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Ms Jessica Darmanin
- **Perit:** [Perit Maria Schembri Grima](https://propertylist.mt/perit/maria-schembri-grima)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Alterations & Extensions (Residential)
- **Received:** 16 December 2022
- **Validated:** 10 May 2023
- **Published:** 22 March 2023
- **Comments close:** 13 April 2023
- **Decision:** Acceptable
- **Permit expires:** 24 May 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/01586/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=01586&caseYear=23)

## Planning activity around Trithon Court, Block P, Flat 41, Triq il-Kurazza, Qawra, San Pawl il-Bahar

89 other applications within 300 m: 56 granted, 2 refused, 9 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 10 floors (PA/08577/24).

On Triq il-Kurazza: 4 other applications, 2 granted and 0 refused.

Approval estimate for alterations & extensions applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/08102/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08102-24/san-pawl-il-bahar-sanction-property-as-built): To sanction property as built. Granted, validated 27 November 2024, 20 m away
- [**PA/03018/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03018-26/san-pawl-il-bahar-sanction-property-as-built): To sanction property as built. Property originally approved by PAPB1475/65. Granted, validated 18 June 2026, 24 m away
- [**PA/05165/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05165-25/san-pawl-il-bahar-internal-and-external-alterations-to-existing-maison): Proposed internal and external alterations to existing maisonette. Granted, validated 30 September 2025, 29 m away
- [**PA/01718/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01718-21/san-pawl-il-bahar-installation-of-a-temporary-demountable-platform-lif): Proposed installation of a temporary demountable platform lift on facade, to provide access to all at Apt 28. Status being checked, 44 m away
- [**PA/00487/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00487-21/san-pawl-il-bahar-sanction-apartment-at-second-floor-level-as-built): To sanction apartment at second floor level as-built. Status being checked, 49 m away
- [**PA/04526/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04526-23/san-pawl-il-bahar-shifting-of-internal-walls-namely-removal-of): Shifting of internal walls namely removal of store and existing bathroom to form additional bedroom. shifting of main entrance to form main bathroom and… Granted, validated 26 July 2023, 55 m away
- [**PA/01635/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01635-24/san-pawl-il-bahar-sanctioning-of-differences-from-permit-pb2377-66-and): Sanctioning of differences from permit PB2377/66 and proposed minor alterations. Granted, validated 13 May 2024, 57 m away
- [**PA/01331/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01331-26/san-pawl-il-bahar-sanction-existing-apartment-from-already-approved-pb): To sanction existing apartment from already approved PB2377/66. Granted, validated 1 April 2026, 58 m away
- [**PA/03518/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03518-25/san-pawl-il-bahar-sanction-the-enclosure-of-a-balcony): To sanction the enclosure of a balcony Granted, validated 30 June 2025, 58 m away
- [**PA/00039/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00039-22/san-pawl-il-bahar-sanctioning-of-differences-from-permit-pb2377-66-and): Sanctioning of differences from permit PB2377/66 and proposed minor alterations. Status being checked, 59 m away
- [**PA/04117/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04117-25/san-pawl-il-bahar-internal-and-external-alterations-from-approved-pa-0): Proposed internal and external alterations from approved PA/00977/94, extension at ground floor and subdivision of dwelling. Granted, validated 30 July 2025, 96 m away
- [**PA/04334/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04334-24/san-pawl-il-bahar-sanction-walls-and-apertures-internally-and-external): To sanction walls and apertures internally and externally of Apartment 11 at level 5 which was previously approved by PA/6011/07. Granted, validated 2 September 2024, 101 m away
- [**PA/02475/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02475-25/san-pawl-il-bahar-sanction-property-from-approved-pa-5533-05-and-propo): To sanction property from approved PA/5533/05 and proposed change of use from Class 4A offices to Class 4C including retractable outdoor canopy. Granted, validated 16 April 2025, 117 m away
- [**PA/04298/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04298-26/san-pawl-il-bahar-sanctioning-of-apartment-as-built): Sanctioning of apartment as built. Variations from PA1560/05 and PA6011/07. Granted, validated 3 August 2026, 118 m away
- [**PA/01333/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01333-26/san-pawl-il-bahar-alterations-and-change-of-use-from-class): Proposed alterations and change of use from Class 4B to ancillary gym serving the approved Class 3B DoubleTree Hilton Hotel. Granted, validated 4 March 2026, 125 m away

## More by Maria Schembri Grima

- [**PA/07648/26** Balzan](https://propertylist.mt/permit/PA-07648-26/balzan-subdivision-of-apartments-approved-in-pa-00505-26): Proposed subdivision of apartments approved in PA/00505/26. Proposed internal and external alterations. Proposed pool at receded floor level. Pending
- [**PA/07622/26** Fgura](https://propertylist.mt/permit/PA-07622-26/fgura-demolition-of-existing-garage-and-four-maisonettes): Proposed demolition of existing garage and four maisonettes, excavation of site, construction of 7 garages at basement level, 15 residential units from ground… Pending, 4 floors plus a receded floor
- [**PA/07575/26** Mellieha](https://propertylist.mt/permit/PA-07575-26/mellieha-subdivision-of-the-approved-penthouse-at-receded): Subdivision of the approved penthouse at receded floor (Level 4) as approved under application PA/05613/23, to create two penthouses. Pending
- [**PA/07332/26** Marsa](https://propertylist.mt/permit/PA-07332-26/marsa-demolition-of-existing-property): Demolition of existing property, excavation of plot and construction of a hotel Class 3B from first floor upwards, a spa and an indoor pool at basement level,… Pending, validated 28 October 2026
- [**PA/07307/26** Zabbar](https://propertylist.mt/permit/PA-07307-26/zabbar-site-clearance): Proposed site clearance, excavation of the site, and construction of tombs at ground floor level together with columbariums. Pending, validated 21 October 2026, 1 floor
- [**PA/07301/26** Marsa](https://propertylist.mt/permit/PA-07301-26/marsa-proposed-demolition-of-existing-properties): To proposed demolition of existing properties, excavation of a plot and construction of 3 garages at basement level. Proposed two maisonettes at ground floor… Pending, validated 21 October 2026

[All applications by Maria Schembri Grima](https://propertylist.mt/perit/maria-schembri-grima)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
