propertylist

PA/01814/22: construction of swimming pool and balance tank in Zurrieq

28 'L-Inwar', Triq Hal Millieri, Zurrieq

Proposed construction of swimming pool and balance tank with a different configuration from that approved in DN00169/16, excavation of a reservoir, resurfacing of garage floor and additional courses over backyard wall.

Status
Status being checked
Location
28 'L-Inwar', Triq Hal Millieri, Zurrieq
Locality
Zurrieq
Applicant
Mr Jesmond Borg
Perit
Perit Ronald Zammit Lucas
Type of works
New Construction (Commercial)
Residential units
1

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 28 'L-Inwar', Triq Hal Millieri, Zurrieq

23 other applications within 300 m: 11 granted, 1 refused, 2 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/07407/23).

On Triq Hal Millieri: 3 other applications, 2 granted and 0 refused. Periti active on this street: Rita Sant.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Ronald Zammit Lucas

All applications by Ronald Zammit Lucas

More from Jesmond Borg

All planning applications in Zurrieq