PA/01818/22: Erection of a pump room and excavation in San Gwann
Field at, l/o Tar-Raddiena, Triq tal-Qasbi, San Gwann
Erection of a pump room and excavation for the construction of a water reservoir underneath.
- Status
- Status being checked
- Location
- Field at, l/o Tar-Raddiena, Triq tal-Qasbi, San Gwann
- Locality
- San Gwann
- Applicant
- Ms Santana Pace
- Perit
- Perit Jesmond Mugliett
- Type of works
- New Construction
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Field at, l/o Tar-Raddiena, Triq tal-Qasbi, San Gwann
1 other application on the same street: 1 granted, 0 refused, 0 pending.
On Triq tal-Qasbi: 1 other application, 1 granted and 0 refused.
Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01003/23 San Gwann: Sanctioning of the conversion of a pre-1978 vernacular rural structure into a dwelling including the consolidation of a pre-1978 structure into existing…
More by Jesmond Mugliett
- PA/07409/26 Fgura: Change in layout of toilet and ante room, sanctioning of entrance and proposal for new door.
- PA/06349/26 Tarxien: Sanctioning of garage as built from approved permit PA/2605/12.
- PA/05527/26 Ta' Xbiex: Minor alterations from PA/05902/18 including the addition of a pvc structure at the back of the property.
- PA/05269/26 Qormi: Changes to approved permit PA/01462/23, comprising of, the retention of existing ground floor areas, including adjustments to the courtyard and minor…
- PA/05163/26 Marsaxlokk: Alterations at basement and ground floor from approved PA/07047/24 (including extension at basement level providing access to ground floor and reorganisation…
- PA/05144/26 Msida: Changes to development approved in PA/02059/25 comprising of the following; Addition of buffer zone along third party wall at basement level and one HCB leaf…