PA/01905/22: construction of farm in San Pawl il-Bahar
Site at, Off, Triq il-Wardija, Burmarrad, San Pawl il-Bahar
Proposed construction of farm, and ancillary storage at basement level, and rubble walls. Proposal also includes the installation of gate and the installation of pv panels at roof level. To sanction also existing front boundary wall.
- Status
- Status being checked
- Location
- Site at, Off, Triq il-Wardija, Burmarrad, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Mr Raymond Gauci
- Perit
- JG Periti
- Type of works
- Sanctioning
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Site at, Off, Triq il-Wardija, Burmarrad, San Pawl il-Bahar
31 other applications within 300 m: 19 granted, 0 refused, 5 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 2 floors (PA/08347/25).
On Triq il-Wardija: 31 other applications, 19 granted and 0 refused; granted buildings are typically 2 floors, the tallest 2. Periti active on this street: Leonard Spiteri, Joseph Bondin, Edwin Mintoff, JG Periti, Mark Sullivan.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00716/26 San Pawl il-Bahar: Proposal includes an agricultural room, with underlying reservoir, pump room and ramp with a timber gate to access the site.
- PA/03830/23 San Pawl il-Bahar: Renewal of permit PA3597/13: to consolidate constructed section of chateau style premises approved originally with PB4992/70/3464/65 and erect ground floor as…
- PA/05357/25 San Pawl il-Bahar: To erect greenhouse and reservoir for agricultural produce purposes.
- PA/04859/26 San Pawl il-Bahar: Proposed construction of 2 underlying basement levels to the approved ancillary farm area (Permit No. PA/04209/23), including excavation works,…
- PA/04209/23 San Pawl il-Bahar: To sanction construction of: 1) the lower basement level to be used as a store instead of underground reservoir. 2) minor changes to the outline of the upper…
- PA/07296/24 San Pawl il-Bahar: To sanction the re-construction of structures built as shown in the aerial photo of 1978 over the existing reservoir, and to sanction the extension of the…
- PA/06011/25 San Pawl il-Bahar: To propose new dwelling as an end of scheme.
- PA/08347/25 San Pawl il-Bahar: To demolish pre-1968 dwelling; alterations to 3C multi purpose hall and layout at basement level approved in PA1527/17; to sanction minor variations from…
- PA/00081/20 San Pawl il-Bahar: Proposed construction of two floor residential unit with garage at basement level and washroom at the top floor.
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/03494/25 San Pawl il-Bahar: Proposed demolition of existing properties, excavation of plot and construction of basement garages, twenty-one apartments, and eight maisonettes from…
- PA/05601/24 San Pawl il-Bahar: Proposed shifting of approved sheep farm and introduction of ramp to access basement store.
- PA/04067/23 San Pawl il-Bahar: Proposed demolition of pig farm and construction of residential unit with basement level, including garage, construction of pool and landscaping.
- PA/06726/25 San Pawl il-Bahar: Proposed rubble wall along the back perimeter of the residential house.
- PA/00618/22 San Pawl il-Bahar: Demolition of rear part of terraced house, re-construction thereof, other internal alterations, construction of swimming-pool, lift and conversion of front…
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…
More from Raymond Gauci
- PA/05601/24 San Pawl il-Bahar: Proposed shifting of approved sheep farm and introduction of ramp to access basement store.
- PA/07444/23 Zejtun: To sanction minor internal and external alterations from approved PAPB71/69 including proposal of railing on facade.
- PA/01064/23 San Pawl il-Bahar: Proposed construction of agricultural room, underlying reservoir and an access gate.
- PA/03281/21 Naxxar: Proposed construction of washroom and opramorta at roof level and sanctioning of garage door material and proposed replacement of apertures materials.
- PA/01807/21 Naxxar: To construct one industrial garage Class 5B at Level 0, another industrial garage Class 5B at Level 1, and 98 car spaces at Level 2. Proposal includes minor…