PA/02043/26: Excavation of the existing site in St Julians
Vacan Plot, Triq Mikiel Anton Vassalli, Triq Henry Calleja and, Triq Charles Sciberras, San Giljan
Excavation of the existing site, and construction of a sports activities building that includes one underground parking level, gym, squash courts and yoga studio (Class 3C), spa facilities (Class 3C); indoor games room some ancillary facilities and a public garden that includes a kiosk, play, seating and communal areas and a pedestrian link to Triq Charles Sciberras.(Ta' Giorni Area).
- Status
- Suspended (Application processing is currently suspended at the perit's request)
- Location
- Vacan Plot, Triq Mikiel Anton Vassalli, Triq Henry Calleja and, Triq Charles Sciberras, San Giljan
- Locality
- St Julians
- Applicant
- Jodie Camilleri
- Perit
- Dr Pierre Farrugia
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction
- Height
- 1 floor
- Received
- 26 November 2025
- Validated
- 1 April 2026
- Published
- 1 April 2026
- Comments close
- 4 May 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Vacan Plot, Triq Mikiel Anton Vassalli, Triq Henry Calleja and, Triq Charles Sciberras, San Giljan
4 other applications on the same street: 1 granted, 0 refused, 0 pending.
On Triq Mikiel Anton Vassalli: 4 other applications, 1 granted and 0 refused.
Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02237/24 St Julians: To propose free standing billboards along schemed road.
- PA/00608/22 St Julians: Proposed installation of billboard (solar powered illumination).
- PA/02489/22 St Julians: Sanctioning of existing garage as built and proposed opening of garage door in facade
- PA/06079/24 St Julians: Proposed Improvements at part of Triq Mikiel Anton Vassalli and Triq Sant’ Andrija including the Upgrading of Junction with Triq Sant’ Andrija and Junction…
More by Pierre Farrugia
- PA/06712/26 Gzira: To correct discrepancies in the approved drawings under PA/00989/25 regarding the original heights of the existing common party boundary walls at the rear…
- PA/02958/26 Qormi: Conversion of an existing terraced house to a Class 3A guest house with 11 rooms, internal alterations including demolition of parts of the walls,…
- PA/02834/26 Sliema: Renewal of PA/00071/22 which refers to a renewal of PA/07471/17-Demolition of existing hotel and proposed new construction of Class 3B hotel, including…
- PA/02630/26 Sliema: Proposed changes to level 9 - extension of apt.9 to include 1 bedroom.
- PA/01838/26 St Julians: To construct retractable canopies at level 19 of InterContinental Hotel.
- PA/01837/26 St Julians: To construct a retractable canopy at level 15 of InterContinental Hotel.
All applications by Pierre Farrugia
More from Jodie Camilleri
- PA/07140/26 Naxxar: To excavate and construct a basement level with 11 spaces for industrial use (Class 5B), to construct a ground floor level with 10 spaces for industrial use…
- PA/07038/25 Birkirkara: Proposed demolition of existing dwelling. Excavation of basement level and construction of 2 garages, 2 maisonettes, 6 apartments and 2 penthouses
- PA/01745/22 Ghajnsielem: Modifications to existing house, including internal and external alterations and extension, to convert into two duplex maisonettes with pools.
- PA/00254/21 Mtarfa: Proposed restoration, alterations and additions to existing pre-1967 dwelling No. 7, referred to as structure ‘B’ on the drawings, currently having a minimum…