> Status being checked planning application in Rabat (Gozo): To sanction variations from PA07085/06, consisting of internal and external differences and…

Planning applications › Rabat (Gozo) › PA0208221

# PA/02082/21: sanction variations from PA07085/06 in Rabat (Gozo)

Lunzjata Court, 12, The Penthouse, Triq Dun Pawl Micallef, Rabat (Gozo)

To sanction variations from PA07085/06, consisting of internal and external differences and correction of site layout.

- **Status:** Status being checked
- **Location:** Lunzjata Court, 12, The Penthouse, Triq Dun Pawl Micallef, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** [Mr Kevin Farrugia](https://propertylist.mt/applicant/kevin-farrugia)
- **Perit:** [Perit Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb)
- **Type of works:** Sanctioning

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/02082/21)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=02082&caseYear=21)

## Planning activity around Lunzjata Court, 12, The Penthouse, Triq Dun Pawl Micallef, Rabat (Gozo)

106 other applications within 300 m: 65 granted, 2 refused, 13 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/05949/25).

On Triq Dun Pawl Micallef: 8 other applications, 7 granted and 0 refused; granted buildings are typically 2 floors, the tallest 2.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 23 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01467/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-01467-24/rabat-gozo-sanction-minor-internal-and-external-variations-and): To sanction minor internal and external variations and non-compliance of re-use of dismantled arches approved in PA3415/18. Granted, validated 13 March 2024, 33 m away
- [**PA/00437/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00437-25/rabat-gozo-change-of-use-of-flat-to-class): Change of use of flat to Class 4A office and proposed minor internal changes. Granted, validated 29 January 2025, 43 m away
- [**PA/05760/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05760-24/rabat-gozo-additions-and-alterations-to-existing-pre-1968-dwelling): Additions and alterations to existing pre-1968 dwelling at ground and first floor level, addition of timber balcony, sanctioning of collapsed structure at back. Granted, validated 28 August 2024, 59 m away
- [**PA/06671/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06671-25/rabat-gozo-partial-demolition): Partial demolition, alterations and additions to existing dwelling including construction of additional floor and change of use from Class 4B shop to… Granted, validated 2 December 2025, 65 m away
- [**PA/00218/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00218-26/rabat-gozo-change-of-use-from-a-private-car): Change of use from a private car garage to a Class 4B hairdresser. The proposal includes alterations to apertures and the display of signage. Granted, validated 21 January 2026, 69 m away
- [**PA/03479/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03479-23/rabat-gozo-change-of-use-from-approved-class-3a): Change of use from approved Class 3A guesthouse, to Class 1 terrace house dwelling. Granted, validated 14 June 2023, 70 m away
- [**PA/01220/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-01220-25/rabat-gozo-subdivide-approved-dwelling-in-pa-06641-21-into-3): To subdivide approved dwelling in PA/06641/21 into 3 houses including garage for private cars and swimming pool at ground floor level, first and receded floor. Granted, validated 26 February 2025, 2 floors plus a receded floor, 71 m away
- [**PA/05949/25** Fontana](https://propertylist.mt/permit/PA-05949-25/fontana-sanction-variations-from-permit-pa4478-08): To sanction variations from permit PA4478/08, to divide terraced house approved in PA4478/08 into two maisonettes and to construct additions to the first… Granted, validated 17 September 2025, 3 floors, 72 m away
- [**PA/04814/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04814-23/rabat-gozo-restoration-of-the-belfry-of-st): Restoration of the belfry of St. Augustine church and the side and back facades of the adjoining priory. Granted, validated 28 September 2023, 92 m away
- [**PA/04744/25** Fontana](https://propertylist.mt/permit/PA-04744-25/fontana-additions-and-alterations-to-class-4b-pharmacy): Proposed additions and alterations to Class 4B pharmacy approved in PA883/25. Granted, validated 26 August 2025, 94 m away
- [**PA/04665/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-04665-25/rabat-gozo-excavation-of-vacant-site-and-construction-of): Proposed excavation of vacant site and construction of an enlarged Class 2A nursing home (already approved through PA/03915/22) on six floors and a recessed… Pending, validated 30 July 2025, 6 floors plus a receded floor, 94 m away
- [**PA/07201/23** Fontana](https://propertylist.mt/permit/PA-07201-23/fontana-make-the-ventilation-grill-at-the-back): To make the ventilation grill at the back accessible. To also carry out alterations to layout. Granted, validated 16 February 2024, 98 m away
- [**PA/06773/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06773-24/rabat-gozo-addition-to-terrace-at-the-back-and): Proposed addition to terrace at the back and sanctioning of minor variations from approved drawings Granted, validated 18 February 2025, 102 m away
- [**PA/02994/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02994-22/rabat-gozo-add-a-niche-in-existing-facade): To add a niche in existing facade. Status being checked, 105 m away
- [**PA/06126/23** Fontana](https://propertylist.mt/permit/PA-06126-23/fontana-sanction-changes-from-pa3919-17-at-ground): To sanction changes from PA3919/17 at ground, first and second floor levels. Also proposed additions to existing roof structures and a service room and lift… Refused, validated 3 January 2024, 107 m away

## More by Mariella Xuereb

- [**PA/07663/26** Xaghra](https://propertylist.mt/permit/PA-07663-26/xaghra-sanction-minor-deviations-from-pa-04078-04-and-rg-00621-24): To sanction minor deviations from PA/04078/04 and RG/00621/24. Pending
- [**PA/07257/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07257-26/rabat-gozo-replacement-of-apertures): Replacement of apertures (accepted through GS/00020/25). Pending
- [**PA/06884/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06884-26/rabat-gozo-restoration-of-facade): Restoration of facade (accepted through GS/00043/25). Pending
- [**PA/06597/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06597-26/rabat-gozo-demolish-existing-structures-and-propose-a-terraced): To demolish existing structures and propose a terraced house organised on two floors with access to roof and a garage for private cars. To excavate and… Pending, 2 floors
- [**PA/06568/26** Qala](https://propertylist.mt/permit/PA-06568-26/qala-construction-of-3-stables-with-ancillary-facilities): Construction of 3 stables with ancillary facilities, a reservoir and installation of timber gates. Pending, validated 23 September 2026
- [**PA/06397/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06397-26/rabat-gozo-restoration-of-facade): Restoration of facade (BHRS25). Granted, validated 15 October 2026

[All applications by Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb)

## More from Kevin Farrugia

- [**PA/02049/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02049-26/rabat-gozo-change-of-use-from-class-4b-to): Change of use from Class 4B to a residential unit. Granted, validated 25 March 2026
- [**PA/05416/25** Attard](https://propertylist.mt/permit/PA-05416-25/attard-part-extension-of-the-existing-third-floor): Proposed part extension of the existing third floor plan and construction of a washroom at fourth floor to the property covered by RG00396/23. Under appeal, validated 29 September 2025, 5 floors
- [**PA/02860/25** Zurrieq](https://propertylist.mt/permit/PA-02860-25/zurrieq-excavation-and-construction-of-an-underground-water): Proposed excavation and construction of an underground water reservoir, small pump room and sanctioning of gate. Granted, validated 14 May 2025
- [**PA/02724/25** Ghajnsielem](https://propertylist.mt/permit/PA-02724-25/ghajnsielem-excavation-of-site-and-construction-of-garages): Excavation of site and construction of garages at basement and ground floor levels, and overlying 12 residential units. Granted, validated 24 May 2025
- [**PA/06590/24** Qala](https://propertylist.mt/permit/PA-06590-24/qala-demolish-existing-residential-unit-and-construct-ten): To demolish existing residential unit and construct ten residential units and eight garages. Granted, validated 24 December 2024
- [**PA/02653/24** Ghajnsielem](https://propertylist.mt/permit/PA-02653-24/ghajnsielem-demolition-of-existing-dwelling): Demolition of existing dwelling, excavation and construction of basement garages with overlying 9 residential units. Granted, validated 8 May 2024

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)