propertylist

PA/02118/22: Relocation of pre-1968 rooms and reconstruction of in Zabbar

Site at (field), unnamed passage in, Triq il-Kappuccini, Zabbar

Relocation of pre-1968 rooms and reconstruction of pre-1978 room, into one consolidated structure which includes basement. Proposed excavation of an irrigation reservoir, sump, installation of gate and trees.

Status
Status being checked
Location
Site at (field), unnamed passage in, Triq il-Kappuccini, Zabbar
Locality
Zabbar
Applicant
Mr Roderick Gialanze
Perit
Perit Reuben Cauchi
Type of works
Other

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Site at (field), unnamed passage in, Triq il-Kappuccini, Zabbar

52 other applications within 300 m: 36 granted, 2 refused, 3 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02509/23).

On Triq il-Kappuccini: 29 other applications, 20 granted and 2 refused; granted buildings are typically 2 floors, the tallest 2. Periti active on this street: Pierre Poulton, Joe Barbara, Patrick Refalo, Albert Spiteri, Reuben Cauchi.

Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Reuben Cauchi

All applications by Reuben Cauchi

All planning applications in Zabbar