propertylist

PA/02347/25: construction of washroom at second floor level in Zejtun

2, Xefaq, Triq il-Fossa tal-Qamh, Zejtun

Proposed construction of washroom at second floor level and installation of pv panels at rooftop level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
2, Xefaq, Triq il-Fossa tal-Qamh, Zejtun
Locality
Zejtun
Applicant
Jason Aquilina
Perit
Perit Malcolm Caruana
Application type
Full development permission
Zone
Within Development Zone
Type of works
Solar
Received
24 February 2025
Validated
9 April 2025
Published
9 April 2025
Comments close
16 May 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
16 July 2025
Permit expires
30 July 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 2, Xefaq, Triq il-Fossa tal-Qamh, Zejtun

100 other applications within 300 m: 65 granted, 0 refused, 10 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00582/24).

On Triq il-Fossa tal-Qamh: 6 other applications, 4 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Joseph Saliba, Jason Zammit.

Approval estimate for solar applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Malcolm Caruana

All applications by Malcolm Caruana

All planning applications in Zejtun